| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.6 LAccepted-AOC BLDG 9 FLAT 130 MIRA CO OP HOUSING SOCIETY LTD SALISBURY PARK GULTEKDI PUNE 411037 | PUNE | PUNE | MAHARASHTRA | 411037 | L1 | Accepted-AOC Bidder quoted L1 rates | |
| 2 | L2₹32.7 L+₹4.1 L (14.2%)Rejected-Finance 10 MAKHAN LAL SADHUKHAN LANE PO PS BARRACKPORE KOLKATA 700120 W B | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700120 | L2 | Rejected-Finance Bidder not quoted L1 rates | |
| 3 | Rejected-Technical | - | Rejected-Technical Incorrect DD Uploaded |
| Sl No | Description | Qty | Unit | Vijay Construction and Company L1 | R K Construction L2 |
|---|---|---|---|---|---|
| 1.00B/R PORTION NOTE : All items required for providing building by new construction including internal services & allied works required for site clearance, road/ Path / Culvert, Sewage Disposal etc. shall be measured and paid under B/R portion of this BOQ. No claim of contractor on this account shall be entertained. | |||||
| 2.00 | Surface dressing n exc 15 cm in soft/loose soil complete all as specified and as directed. | 135 | SQM | 35 ₹4,725 Lowest | 40 ₹5,400 |
| 3.00 | Surface excavation n.exc 30 cm deep and averaging 15cm deep and getting out in soft/loose soil complete all as specified and as directed. | 62 | SQM | 65 ₹4,030 | 60 ₹3,720 Lowest |
| 4.00 | Excavating in trenches, not exc 1.5 m wide and not exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, laying LT UG Cable, GI Pipe etc. not exc 10 sqm on plan and not exc 1.5 m in depth and getting out in soft / loose soil complete all as specified and as directed. | 28 | CUM | 290 ₹8,120 Lowest | 300 ₹8,400 |
| 5.00 | Excavating in trenches, not exc 1.5 m wide and not exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, laying LT UG Cable, GI Pipe etc. not exc 10 sqm on plan and not exc 1.5 m in depth and getting out in hard / dense soil complete all as specified and as directed. | 49.41 | CUM | 350 ₹17,293.5 Lowest | 450 ₹22,234.5 |
| 6.00 | Excavating in trenches not exc 1.5 m wide but exc. 1.5m to 3.00m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exc 10 sqm on plan and getting out in soft /disintegrated rock complete all as specified and as directed. | 3.29 | CUM | 650 ₹2,138.5 | 500 ₹1,645 Lowest |
| 7.00 | Returning filling in including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified and as directed. | 57.94 | CUM | 200 ₹11,588 Lowest | 250 ₹14,485 |
| 8.00 | Removal excavated soil not exc 50m and depositing outside MOD land at a level n.exc 1.5 m above the starting point complete all as specified and as directed. | 42.71 | CUM | 300 ₹12,813 Lowest | 300 ₹12,813 Lowest |
| 9.00 | Removing excavated soil material exc. 1.50 km but n exc. 5 km and depositing outside MOD Land complete all as specified and as directed. | 20.25 | CUM | 450 ₹9,112.5 Lowest | 450 ₹9,112.5 Lowest |
| 10.00 | M&L for cement concrete 1:4:8 type D2 (using 40mm graded stone aggregates) as in foundation, filling and mass concrete complete all as specified and as directed. | 6.29 | CUM | 5,000 ₹31,450 Lowest | 5,500 ₹34,595 |
Tender Value
₹29.7 L
EMD Value
₹59,500
Closing Date
4 May 2026, 6:00 pmClosed
COMMANDER WORKS ENGINEER PUNE - 01
HEADQUARTERS COMMANDER WORKS ENGINEERS GEN CARIAPPA MARG, PUNE-411 001
86192 PROVN OF STORAGE ACCN FOR ARMOURIES AND EXPLOSIVE STORE AND GUARD HOUSE AND ANCILLARIES AT AIPT UNDER GE(CENTRAL) PUNE
2026_MES_760249_1
86192 CWE PUNE
Open Tender
Civil Works
Item Rate
180 days
GE (CENTRAL) PUNE
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE (CENTRAL)
₹59,500
Yes
16 Jul 2026
13 Apr 2026
11 May 2026
13 Apr 2026
4 May 2026
27 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | B/R PORTION
NOTE : All items required for providing building by new construction including internal services & allied works required for site clearance, road/ Path / Culvert, Sewage Disposal etc. shall be measured and paid under B/R portion of this BOQ. No claim of contractor on this account shall be entertained. | - | - | - | - |
| - | Surface dressing n exc 15 cm in soft/loose soil complete all as specified and as directed. | - | SQM | - | - |
| - | Surface excavation n.exc 30 cm deep and averaging 15cm deep and getting out in soft/loose soil complete all as specified and as directed. | - | SQM | - | - |
| - | Excavating in trenches, not exc 1.5 m wide and not exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, laying LT UG Cable, GI Pipe etc. not exc 10 sqm on plan and not exc 1.5 m in depth and getting out in soft / loose soil complete all as specified and as directed. | - | CUM | - | - |
| - | Excavating in trenches, not exc 1.5 m wide and not exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, laying LT UG Cable, GI Pipe etc. not exc 10 sqm on plan and not exc 1.5 m in depth and getting out in hard / dense soil complete all as specified and as directed. | - | CUM | - | - |
| - | Excavating in trenches not exc 1.5 m wide but exc. 1.5m to 3.00m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exc 10 sqm on plan and getting out in soft /disintegrated rock complete all as specified and as directed. | - | CUM | - | - |
| - | Returning filling in including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified and as directed. | - | CUM | - | - |
| - | Removal excavated soil not exc 50m and depositing outside MOD land at a level n.exc 1.5 m above the starting point complete all as specified and as directed. | - | CUM | - | - |
| - | Removing excavated soil material exc. 1.50 km but n exc. 5 km and depositing outside MOD Land complete all as specified and as directed. | - | CUM | - | - |
| - | M&L for cement concrete 1:4:8 type D2 (using 40mm graded stone aggregates) as in foundation, filling and mass concrete complete all as specified and as directed. | - | CUM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.54 MB
86192TenderDocs.pdf
Tender Documents • 5.26 MB
ArmouriesDrgRevised.pdf
Additional Documents • 4.24 MB
BOQ_851560.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .