| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹1.9 L+₹1,864 (1.01%)Rejected-Finance | L2 | Rejected-Finance 2nd Lowest | |
| 3 | L3₹1.9 L+₹2,867 (1.55%)Rejected-Finance NABAJIBAN 1 NABAJIBAN COLONY BISHARPARA KOLKA 700158 WEST BENGAL | KOLKATA | KOLKATA | WEST BENGAL | 700158 | L3 | Rejected-Finance 3rd Lowest |
Tender Value
Refer Docs
EMD Value
₹3,721
Closing Date
6 Dec 2023, 12:30 pmClosed
AE/BMCESD/PWD/BANKURA
Kenduadihi, Gobindanagar Hospital campus, Bankura-722102
Annual Maintenance of E.I. work at G and O Building of Bankura Sammilani Medical College and Hospital, under BSMC and H Electrical Section-I,------- Repairing of Copper pipe of three phase Ductable A.C and Split type A.C machine at CCU, main Buildi
2023_WBPWD_609338_1
WBPWDTE/ AE /BMCESD /NIQ-15/Q of 2023-24_2nd call
Open Tender
ELECTRICAL WORKS ORG
Item Wise
14 days
AE/BMCESD/PWD
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,721
Yes
16 Jan 2025
29 Nov 2023
8 Dec 2023
29 Nov 2023
6 Dec 2023
29 Nov 2023
Amount
S& F laying of - (i) gauge copper pipe 5/8" 0.7 mm thick for suction (ii) copper pipe 1/4" 0.6 mm thick for discharge (OEM make) with 9 mm thick thermal insulation foam nitrile / rubber / K Flex / Accroflex with max saddling with max 1 mtr distance both for suction & discharge pipe and mending good the holes & damages as directed by EIC.
S& F laying of - (i) gauge copper pipe 5/8" 0.7 mm thick for suction (ii) copper pipe 3/8" 0.6 mm thick for discharge (OEM make) with 9 mm thick thermal insulation foam nitrile / rubber / K Flex / Accroflex with max saddling with max 1 mtr distance both for suction & discharge pipe and mending good the holes & damages as directed by EIC.
Supply ,fixing & Testing of 2.5 TR capacity Twin Rotary Compressor (For R-22Refrigerant) for Ductable split type Air-conditioner of colling capacity 24000BTU/Hr of rated power supply-415V-3ph-50Hz. in place of damaged compressor unit. (Make -Hitachi/Coopland)
After commissioning the machine testing the leack by nitrogen gas pressure (minimum 400 PSI ) and vacuuming the unit properly (Minimum -30 PSI), hold the vacuum up to 48 hours, after release the gas testing the Ductable split type Air-conditioner Room Air conditioner.
Supply & charge R-22 Refrigerant
NEW ENVIRONMENT CONTROL CO.
ANIKET COOLING AND REFRIGERATION CO
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .