Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 CrFinancial bid opened Construction of RCC Framed boundary wall & Main entry gate for 11th BN, NDRF including electrical work at Shahupur, Varanasi. | Construction of RCC Framed boundary wall & Main entry gate for 11th BN, NDRF including electrical work at Shahupur, Varanasi. | ₹2.7 Cr | L1 | Financial bid opened |
| 2 | L2₹3.1 Cr+₹36.2 L (13.4%) Construction of RCC Framed boundary wall & Main entry gate for 11th BN, NDRF including electrical work at Shahupur, Varanasi. | Construction of RCC Framed boundary wall & Main entry gate for 11th BN, NDRF including electrical work at Shahupur, Varanasi. | ₹3.1 Cr+₹36.2 L (13.4%) | L2 | - |
| 3 | L3₹3.2 Cr+₹45.2 L (16.8%) Construction of RCC Framed boundary wall & Main entry gate for 11th BN, NDRF including electrical work at Shahupur, Varanasi. | Construction of RCC Framed boundary wall & Main entry gate for 11th BN, NDRF including electrical work at Shahupur, Varanasi. | ₹3.2 Cr+₹45.2 L (16.8%) | L3 | - |
| 4 | L4₹3.5 Cr+₹75.6 L (28.0%) Construction of RCC Framed boundary wall & Main entry gate for 11th BN, NDRF including electrical work at Shahupur, Varanasi. | Construction of RCC Framed boundary wall & Main entry gate for 11th BN, NDRF including electrical work at Shahupur, Varanasi. | ₹3.5 Cr+₹75.6 L (28.0%) | L4 | - |
| 5 | L5₹3.5 Cr+₹77.3 L (28.6%) Construction of RCC Framed boundary wall & Main entry gate for 11th BN, NDRF including electrical work at Shahupur, Varanasi. | Construction of RCC Framed boundary wall & Main entry gate for 11th BN, NDRF including electrical work at Shahupur, Varanasi. | ₹3.5 Cr+₹77.3 L (28.6%) | L5 | - |
| Sl No | Description | Qty | Unit | SAS INFRA L6 | MAYANK ASSOCIATES L4 | YOGESH SIKKA L5 | M/s Saurabh Enterprises, Pura-raghunathpur,Babatpur,Varanasi-221006 L1 | M/S AWADH CONSTRUCTION L7 | M/s Singh Builders L3 | Bipin Kumar Patel L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Civil Work | - | - | -30.89 ₹3,59,29,575.09 | -33.63 ₹3,45,05,077.4 | -33.3 ₹3,46,76,640.99 | -48.18 ₹2,69,40,682.7 Lowest | -25.12 ₹3,89,29,338.49 | -39.46 ₹3,14,74,120.62 | -41.2 ₹3,05,69,512.6 |
| - | Electrical Work | - | - | -31.19 ₹46,825.89 | -33.63 ₹45,165.45 | -33.03 ₹45,573.75 | -25 ₹51,038.25 | -22 ₹53,079.78 | -38.99 ₹41,517.92 Lowest | -35 ₹44,233.15 |
Tender Value
₹5.2 Cr
EMD Value
₹10.4 L
Closing Date
17 Sept 2025, 3:00 pmClosed
EE- Chandauli Project
SUBODH KUMAR SINGH
Executive Engineer, Varanasi Division, CPWD, Varanasi
Construction of RCC Framed boundary wall & Main entry gate for 11th BN, NDRF including electrical work at Shahupur, Varanasi.
125548
13/EE/VD/2025-26
OPEN
Civil Works - Buildings
NCB
8 months
Varanasi, Uttar Pradesh
16 documents required · 16 mandatory
₹10.4 L
Not Applicable
17 Sept 2025
3 Sept 2025
17 Sept 2025
17 Sept 2025
10 Sept 2025
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
NDRF+merged+all.pdf
document • 4.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .