Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.2 LAccepted-AOC | 1 | Accepted-AOC 1 | |
| 2 | 2₹11.3 L+₹10,935 (0.98%)Rejected-AOC BUS STAND ROAD BARARA AMBALA | AMBALA | AMBALA | HARYANA | 2 | Rejected-AOC 2 | |
| 3 | 3₹12.9 L+₹1.8 L (15.8%)Rejected-AOC | 3 | Rejected-AOC 3 |
Tender Value
₹11.7 L
EMD Value
₹23,500
Closing Date
1 Jun 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy CE/TL Circle
Dy CE/TL Circle Patiala
Replacement of existing HRP line with 66 KV S/C on D/C Line from 66 KV S/s Pakhoke to 66 KV S/s Cheema
2022_POWER_83978_2
209/TLC/PTA/2022-23
Open Tender
Electrical Works
Item Rate
90 days
Dy CE/TL Circle
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
₹23,500
Yes
12 Jul 2022
13 May 2022
2 Jun 2022
13 May 2022
1 Jun 2022
13 May 2022
120 days
Tower Type A (D-2o)Normal Open Type (CW/TT-3010-R1)( D-2o + 0m=04 No , D-2o + 3m=2 No )
Tower Type-B (D-30o)Open Pit (CW/TT-3011-R1)( D-30o + 0m=04 No , D-30o + 3m=01 No)
Tower Type-C (D-60o)Open Pit (CW/TT-3013-R3)( D-60o + 0m=02 No , D-60o + 3m=01 No)
Transportation and erection of towers complete with all fittings including tack welding (Welding Rods to be supplied by the contractor) & zinc rich paint touching wherever required (zinc paint to be supplied by the contractor) Installation of danger plates, No. plates, Phase Plates, Ckt Plates, Bird guard & Anti climbing devices etc on labour rate basis (66 KV) D-2o + 0m=04 No , D-2o + 3m=02 No D-30o + 0m=04 No , D-30o + 3m=01 No D-60o + 0m=02 No , D-60o + 3m=1 No
Transportation, Installation of Insulator Strings complete with hardware installation & Stringing & sagging of conductor 0.2sq” including fixing of condr. Accessories for the 66KV S/C line on D/C towers on labour rates basic. ( 3.240 Ckt KM)
Transportation, installation, Stringing & Sagging of Earth wire 7/2.24mm at the top of tower including fixing of earth wire accessories as on labour rate basis. 3.240 KM)
Pit marking Straight Tower
Pit marking Angle Tower
Dismantlement H.T.P = 16 no
Dismantlement 3.T.P = 02 no.
Dismantlement 4.R.P = 03 no.
Dismantlement of ACSR 0.125 Sq’’
Dismantlement of E/W/7/2.24 mm =2x1.248=2.496 KM
Jain Brothers
Sukhdev Ram Govt Contractor
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .