Tender Value
₹3.4 Cr
EMD Value
₹4.1 L
Closing Date
6 Oct 2026, 6:00 pm
CWE DINJAN
COMMANDER WORKS ENGINEER DINJAN
PROVN OF SINGLE OFFRS LIVING ACN AT DINJAN MIL STN UNDER GE DINJAN
2026_MES_787704_1
84582/E8
Open Tender
Civil Works
Lump-sum
850 days
GE DINJAN
AS PER TENDER DETAILS
8 documents required · 8 mandatory
₹2,000
GE DINJAN
₹4.1 L
Yes
3 Sept 2026
3 Sept 2026
13 Oct 2026
3 Sept 2026
6 Oct 2026
1 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Total amount of Sch 'A' Part-I Building Works Note :- This schedule is not pre-priced by MES and the rate indicated as "Rs. 0.00" under column 6 signifies this fact only. | - | - | - | - |
| 2 | Design, Fabrication and Construction of OTM ACCN FOR OR in RCC Framed Structure as per Arch Drg No. CWE/DIN/15/25 sheet No. 1/3 to 3/3 dated 20.01.2025 AND CWE/DIN/15/25 sheet No. 1/1 dated 20.01.2025 and revised thereof. Specification given in Sch A Notes and Particular Specifications including complete RCC foundation and plinth, Flooring, Joinery and Finishes complete all as specified. NOTE : Soil investigation done by HQ CESZ, Shillong through contigency vide their letter No 23501/183/E2(Plg) dt 15 Jun 2026.
(i) Size – As per Arch drawing (ii) Height – as per Drg
(iii) Fdn – To be design as per SBC report with RCC framed construction. (iv) Plinth – Burnt Brick wk in CM 1:6
(v) DPC – 40 mm thick PCC 1:2:4 with WPC
(vi) Super Structure – All RCC structure to be M25 design mix burnt brick wk wall upto ceiling.
(vii) Seismic Zone – Strengthening measures for Zone V
(viii) Roof – 0.50mm thick Pre-painted Galvalume sheet with MS steel frame structure on living area, roof slab with roof treatment - 150 mm thick on ground floor roof verandhah & Bathroom.
(ix) Ceiling : False ceiling with powder coated snap grid frame work.
(x) Internal Plaster – Internal 15 mm thick in CM (1:6)
(xi) Mirror polished kota stone on, verandah & non skid ceramic tiles in toilet and bathroom over 15 mm thick screed bed in base of CM 1:6 over a layer of PCC 1:2:4 over sub base of 1:5:10.
(xii) Dado/Skirting – Glazed ceramic tiles over 10 mm thick cement screed in CM (1:3) up to lintel height.
(xiii) Joinery – Frames – pressed steel, shutter – Factory made flush door shutter (TD Drg No CESZ/2015/TD/03 Sheet 1/2 & 2/2) & molded / WPC doors in toilet bathroom
(xiv) Joinery Window – aluminum powder coated window with Guard bars/grill (TD Drg No CESZ/2015/TD/07 Sheet No 1R/5, 2R/5, 3R/5, 4R/5 & 5R/5)
(xv) Stainless steel routing on first floor of verandah & staircase.
(xvi) Iron monger – Prefabricated aluminum anodized fittings. (TD Drg No CESZ/2015/TD/03 Sheet 1/2 & 2/2)
(xvii) Plinth Protection – 75 mm thick PCC 1:3:6 over stone hard core.
(xviii) Painting – Synthetic enamel paint on steel/wooden surface.
(xix) Finishes – Internal - 02 coats of oil emulsion distemper incl 1mm thick wall care putty over a coat of primer. External - 02 Coats of weather proof exterior emulsion over one coat of primer.
(xx) Antitermite treatment - As per IS-6313 Part-II : 2001
(xxi) Mosquito proofing - All external doors & Windows
(xxii) 18mm thick granite over CM 1:3 for steps
(xxiii) Sanitory Fitting – Vitreous China EWC, WHB ect of approved make including plumbing work (TD Drg No CESZ/TD-38 Sheet No 1/2 & 2/2 and TD Drg No CESZ/TD-31 Sheet No 1/2 & 2/2).
(xxiv) Mosquito Proofing – All external Door and window.
(xxv) Green marbles on steps & raiser on staircase. | 1 | LUMP SUM | 2,69,51,800 | ₹2,69,51,800 |
| 4 | Total amount of Sch ‘A’ Part II (Site Clearance, Site Development & Earthworks) | 1 | LUMP SUM | 88,236.35 | ₹88,236.35 |
| 5 | Total amount of Sch ‘A’ Part III (Cooling Appliance) | 1 | LUMP SUM | 40,539.04 | ₹40,539.04 |
| 6 | Total amount of Sch ‘A’ Part IV (Air Conditioning) | 1 | LUMP SUM | 5,03,174.96 | ₹5,03,174.96 |
| 7 | Total amount of Sch ‘A’ Part V (Road/Path/Culvert) | 1 | LUMP SUM | 6,44,643.82 | ₹6,44,643.82 |
| 8 | Total amount of Sch ‘A’ Part VI (External Water Supply) | 1 | LUMP SUM | 37,366.7 | ₹37,366.7 |
| 9 | Total amount of Sch ‘A’ Part VII (External Electric Supply) | 1 | LUMP SUM | 3,67,356.75 | ₹3,67,356.75 |
| 10 | Total amount of Sch ‘A’ Part VIII (Sewage Disposal) | 1 | LUMP SUM | 8,44,559.72 | ₹8,44,559.72 |
| 11 | Total amount of Sch ‘A’ Part IX (Hot Water Supply) | 1 | LUMP SUM | 94,822.85 | ₹94,822.85 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.53 MB
TenderDocuments.pdf
Tender Documents • 1.49 MB
BOQ_882840.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .