Loading…
Loading…
Tender Value
₹45.1 L
EMD Value
₹90,140
Closing Date
20 Jul 2026, 2:00 pm7d left
Executive Engineer PHE Division LEH
Executive Engineer PHE division leh
Construction testing commissioning and designs of Over Head tank of 20000 Gallon capacity with 6.5mtr staging hight at FPN sumoor
2026_PWD_19179_1
E-Tender no 519 of phe div leh
Open Tender
Civil Works - Others
30 days
leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Executive Engineer phe div leh
₹90,140
10 Jul 2026
10 Jul 2026
21 Jul 2026
10 Jul 2026
20 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in
foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift upto 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m All kind of soil | 168.8 | Cum | 328.15 | ₹55,391.72 |
| 2 | Ordinary Rock | 27.43 | cum | 595.23 | ₹16,327.16 |
| 3 | Hard Rock | 14.77 | cum | 1,434.91 | ₹21,193.62 |
| 4 | Providing &laying of stone boulders (dully hand packed )including watering dressing and ramming with all carriage loading unloading and stacking etc. | 31.68 | cum | 1,124.57 | ₹35,626.38 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded
stone aggregate 40 mm nominal size derived from natural sources) | 19.07 | cum | 6,755.89 | ₹1,28,834.82 |
| 6 | Reinforced cement concrete of specified grade in m20mix with nominal size stone aggregate including curing compelete excluding cost of centering and shuttering & Reinforcement for OHT raft,fotting, foundation beam columns above foundation plinth beam. | 22.73 | cum | 13,100 | ₹2,97,763 |
| 7 | Reinforced cement concrete of specified grade in m20mix with nominal size stone aggregate including curing compelete excluding cost of centering and shuttering & Reinforcement for connecting band,topbean, top raft salb,OHT wall | 31.13 | cum | 13,630.96 | ₹4,24,331.78 |
| 8 | Reinforced cement concrete of specified grade in m20mix with nominal size stone aggregate including curing compelete excluding cost of centering and shuttering & Reinforcement for OHT ring beam,oht dome | 30.34 | cum | 14,278.82 | ₹4,33,219.4 |
| 9 | Reinforcement for RCC work include straight ing ,cutting ,bending ,placing in position &binding all complete (thermo-mechanically treated bars) | 14,314 | kg | 129 | ₹18,46,506 |
| 10 | Centring and shuttering incl.strutting ,proping etc& removal of form work for foundations,footing bases of column for mass concrete | 114.58 | Sqm | 361.26 | ₹41,393.17 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_45662.xls
BOQ • 0.32 MB
corri6.pdf
PDF • 0.43 MB
Download all tender documents and submit your bid