Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAdmitted-Finance VPO TEHSIL JAWALI DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | ₹11.6 L | L1 | Admitted-Finance |
| 2 | L2₹12.1 LAdmitted-Finance VPO TEHSIL JAWALI DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | ₹12.1 L | L2 | Admitted-Finance |
| 3 | L3₹13.0 LAdmitted-Finance DHALIWAL | FATEHGARH SAHIB | PUNJAB | 140402 | ₹13.0 L | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Sushant Puri L1 | Yash Pal Sharma L3 | MS Kamal Dev Sharma L2 |
|---|---|---|---|---|---|---|
| 1.00 | i) Mobilisation & Demobilisation of Survey team and equipment to and from site ii) Marking of TBMs/GCPs with DGPS (reference bench mark approved by the engineer-in-charge) at site/sites under survey by parellel leveling, establishing and constructing bench mark, grid and reference pillars in the field and determining the coordinates of all the boundary corner stones.iii) To conduct aerial surveys using drone visual camera & software analytics and prepare high defination video reports and 2D/3D maps. Prepare Ortho mosaic map in jpeg format (resolution upto 5 cm), Digital Terrain Model (DTM) and Digital surface model (DSM) in Geo TIFF or FSRI ASCII | 4.8 | Sqm KM | 65,000 ₹3.1 L | 70,000 ₹3.4 L | 70,000 ₹3.4 L |
| 2.00Detailed Project Report | ||||||
| 3.00 | i) Collection of relevant information for the subject property and surrounding area. This includes site area maps and identification of land-use ii) Analysis of rainfall data gathered from nearby gauge station or satellite based TRMM data to ascertain flood conditions at site and nearby area (flow rate, frequency, duration). The intensity, frequency and duration of the extreme rainfall shall be defined in accordance with the applicable standard. If not specified in the applicable standard, a minimum return period of 100 years shall be applied, which could be reduced under justification.iii) Visual Survey of the entire drainage area as identified from the maps and data collected.iv) A review of readily available records and documents on hydrology of the area, to assist in determining surface water drainage patterns for the subject property and adjacent areas. v) To establish catchment characterstics such as run-off and natural stream network as established using leading software such asQGIS, HEC, RAS, HEC-HMS and Civil 3D. These characterstics shall be further scrutinized for flood analysis and suitable drainage design.vi) The hydrology analysis to derive flood peak hydrographs and frequency analysis to identify the magnitude of extreme storm events for the return periods specified.vii) Based on the parameters such as rainfall intensity, run off, catchment area, run-off coefficient, existing soil condition,drainout fall location etc. derived from hydrology study, to suggest the plant layout and designs for storm water drains and culverts.viii) Analyzing the data and submitting an engineering report, furnishing recommendations for the design and construction of internal drainage structures or other preventive measures at the site; calculation notes of the drainage system (flow rates,storage volumes, and dimensions) and Erosion protection measures. All details shall be provided to the client with studies of the areas mentioned in the present document and shown on the KMZ file of the site.ix) Prepartion of Detailed Project report from above data and design including proposed storm water drain network with detailed calculations, design, and working estimates. | 1 | Job | 8,50,000 ₹8.5 L | 9,60,000 ₹9.6 L | 8,75,000 ₹8.8 L |
Tender Value
₹10.3 L
EMD Value
₹20,687
Closing Date
23 Mar 2026, 10:00 amClosed
Executive Engineer Jal Shakti Divn Haroli
Executive Engineer Jal Shakti Divn Haroli
C/O Storm Water Drainage Tahliwal Town in Distt Una HP (SH Conducting Drone Survey preparation of detail project Report)
2026_HPIPH_131606_1
No. JSV/ Haroli/ TA/ tender/26- 11022-50 dt 13-03-26
Open Tender
Civil Works
60 days
Haroli Consty
as per NIT
8 documents required · 8 mandatory
₹500
Yes
Executive Engineer Jal Shakti Divn Haroli
₹20,687
6 Apr 2026
14 Mar 2026
23 Mar 2026
14 Mar 2026
23 Mar 2026
14 Mar 2026
14 Mar 2026 - 23 Mar 2026
i) Mobilisation & Demobilisation of Survey team and equipment to and from site ii) Marking of TBMs/GCPs with DGPS (reference bench mark approved by the engineer-in-charge) at site/sites under survey by parellel leveling, establishing and constructing bench mark, grid and reference pillars in the field and determining the coordinates of all the boundary corner stones.iii) To conduct aerial surveys using drone visual camera & software analytics and prepare high defination video reports and 2D/3D maps. Prepare Ortho mosaic map in jpeg format (resolution upto 5 cm), Digital Terrain Model (DTM) and Digital surface model (DSM) in Geo TIFF or FSRI ASCII
Detailed Project Report
i) Collection of relevant information for the subject property and surrounding area. This includes site area maps and identification of land-use ii) Analysis of rainfall data gathered from nearby gauge station or satellite based TRMM data to ascertain flood conditions at site and nearby area (flow rate, frequency, duration). The intensity, frequency and duration of the extreme rainfall shall be defined in accordance with the applicable standard. If not specified in the applicable standard, a minimum return period of 100 years shall be applied, which could be reduced under justification.iii) Visual Survey of the entire drainage area as identified from the maps and data collected.iv) A review of readily available records and documents on hydrology of the area, to assist in determining surface water drainage patterns for the subject property and adjacent areas. v) To establish catchment characterstics such as run-off and natural stream network as established using leading software such asQGIS, HEC, RAS, HEC-HMS and Civil 3D. These characterstics shall be further scrutinized for flood analysis and suitable drainage design.vi) The hydrology analysis to derive flood peak hydrographs and frequency analysis to identify the magnitude of extreme storm events for the return periods specified.vii) Based on the parameters such as rainfall intensity, run off, catchment area, run-off coefficient, existing soil condition,drainout fall location etc. derived from hydrology study, to suggest the plant layout and designs for storm water drains and culverts.viii) Analyzing the data and submitting an engineering report, furnishing recommendations for the design and construction of internal drainage structures or other preventive measures at the site; calculation notes of the drainage system (flow rates,storage volumes, and dimensions) and Erosion protection measures. All details shall be provided to the client with studies of the areas mentioned in the present document and shown on the KMZ file of the site.ix) Prepartion of Detailed Project report from above data and design including proposed storm water drain network with detailed calculations, design, and working estimates.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Tendernotice_2.pdf
PDF • 0.65 MB
Tendernotice_3.pdf
PDF • 0.11 MB
Tendernotice_4.pdf
PDF • 0.10 MB
BOQ_194629.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid