Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Finance | -54.30% | ₹4.4 L | L1 | Admitted-Finance |
| 2 | L2₹4.7 LAdmitted-Finance | -51.10% | ₹4.7 L | L2 | Admitted-Finance |
| 3 | L3₹4.8 LAdmitted-Finance | -50.20% | ₹4.8 L | L3 | Admitted-Finance |
| 4 | L4₹5.1 LAdmitted-Finance | -47.50% | ₹5.1 L | L4 | Admitted-Finance |
| 5 | L5₹5.1 LAdmitted-Finance | -47.43% | ₹5.1 L | L5 | Admitted-Finance |
Tender Value
₹9.7 L
EMD Value
₹19,400
Closing Date
2 Apr 2026, 4:00 pmClosed
xenrew kathua
xenrew
Development of playground at Thanoon
2026_RDPR_306825_7
e-NIT No.409/REW/K of 2025-26 Dated 27/03/2026
Open Tender
Civil Works
30 days
Barnoti
sbd
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹19,400
7 Apr 2026
27 Mar 2026
3 Apr 2026
27 Mar 2026
2 Apr 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery of the area cleared. | - | m2 | - | - | |
Excavating, supplying and filling of local earth/Good earth(including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | - | cum | - | - | |
Earthwork in excavation by manual means in trenches for foundation not exceeding 1.5m in width and for shafts wells and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottom lify upto 1.5m including getting out excavated earth | - | cum | - | - | |
Crates by Mechnical means | - | cum | - | - | |
Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 mix | - | cum | - | - | |
Centering and shuttering including strutting, propping etc. and removal of form for: | - | m2 | - | - | |
Hand-packing stones in wire-crates; excluding cost of crates and stones | - | cum | - | - | |
Supply and dumping of stones for wire crates excluding cost of crates | - | cum | - | - | |
Providing laying and supplying of galvanized iron zinc coated wire crates with mesh size 100 *120 mm dia 2.7/3.7 mmcomplete job | - | no | - | - | |
Sand bajri within average lead of 8 km mt | - | cum | - | - |
stage.html
html • 0.05 MB
techsummary_995992.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.97 MB
BOQ_995992.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid