Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.4 L
EMD Value
₹4,740
Closing Date
16 Mar 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
XEN REW UDH
XEN REW UDH
BOQ
2022_RDPR_163814_23
3rd Time-NIT No. 340 REW UDH of 21-22 Dt 09/03/22
Open Tender
Civil Works
Item Rate
30 days
UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
XE REW UDH
₹4,740
Yes
17 Mar 2022
10 Mar 2022
17 Mar 2022
10 Mar 2022
16 Mar 2022
10 Mar 2022
90 days
Amount
Earth work in bulk excavation by mechanical means (hydraulic excavator)over areas ( exceeding 30cm in depth ,1.5 mt.in width as well as 10sqm on plan )including disposal of excavated earth lead upto 50 mt. &lift upto 1.5 mt.80% all kind of soil.20%S.R.
Earth work in excavation by manual means in trench for foundation ,drains,pipes,cables etc.(not exceeding 1.5mt. In depth )and for shafts,wells,cesspits and the like not exceeding 10sqm on plan depth upto 1.5 mt. including disposal of excavated earth upto 1mt. from cutting edge disposel earth is to be levelledand neatly dressed100%all kind of soil
P/L in position of cement concrete of specified grade excluding the cost of centring&shuttring-all work upto plinth level1:5:10(1 cement:5coarsesand:10 gradedstone aggregates40mm nominal size)including all leads,lift&carriage completed.
P/L in position of cement concrete of specified grade excluding the cost of centring&shuttring-all work upto plinth level1:3:6(1 cement:3coarsesand:16 gradedstone aggregates20mm nominal size)including all leads,lift&carriage completed.
Dumping/filling of stones including cost of stones in horizontal on level .including all leads ,lift &carriage completed.
Centring&shuttring including strutting propping etc.& removal of the form work foundation,footings ,bases of of columns etc.for mass concrete.
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .