| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-Finance | L1 | Accepted-Finance Lowest | |
| 2 | L2₹3.6 L+₹32,413 (10.0%)Accepted-Finance | L2 | Accepted-Finance second lowest | |
| 3 | L3₹3.7 L+₹48,663 (15.1%)Accepted-Finance | L3 | Accepted-Finance Highest |
Tender Value
₹3.9 L
EMD Value
₹7,800
Closing Date
15 Feb 2021, 3:00 pmClosed
The Director, CSIR-CFTRI, Mysuru
CSIR-CFTRI,Cheluvamba Mansion,KRS Road,Mysore
Providing plinth protection for HT transformer yards in Institute and M.G Halli staff quarters campus, CSIR-CFTRI, Mysuru
2021_CSIR_69340_1
E/CW/010/928/2020-2021
Open Tender
Civil Works
Item Rate
30 days
CSIR-CFTRI
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹7,800
16 Feb 2021
5 Feb 2021
16 Feb 2021
5 Feb 2021
15 Feb 2021
5 Feb 2021
5 Feb 2021 - 10 Feb 2021
Amount
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : In cement mortar
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix)
Cutting and removing of tree roots of girth more than 30cm including earth work excavation, refilling and compaction.
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 5.00 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 M sand)
Providing and laying factory made Precast concrete solid blocks of 200 mm thickness of grade M10 made of C&D waste from approved manufacturer in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 M sand)
Brick edging 7cm wide 11.4 cm deep to plinth protection with common burnt clay F.P.S. (non modular) bricks of class designation 5.00 including grouting with cement mortar 1:4 (1 cement : 4 M sand).
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 M sand : 4 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 M sand : 4 graded stone aggregate 20 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 M sand : 8 graded stone aggregate 40 mm nominal size)
15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 M sand)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Spreading 53mm to 40mm stone aggregate inside the yard for 100mm to 125mm thick layer including levelling complete as per the direction of Engineer-in-charge.
Supplying and stacking at site. 53 mm to 40 mm size stone aggregate
Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 M sand : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of stone aggregate 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth.
MOHAMMED IQBAL
K V CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .