Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.4 LAccepted-AOC VILL DHARMSALA PART IV P O DHARMMASALA P S DHUBRI DIST DHUBRI ASSAM PIN 783324 | DHUBRI | DHUBRI | ASSAM | 783324 | ₹22.4 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹24.8 L+₹2.4 L (10.9%)Rejected-Finance | ₹24.8 L+₹2.4 L (10.9%) | L2 | Rejected-Finance Refer to Financial minutes. |
| 3 | L3₹24.9 L+₹2.5 L (11.1%)Rejected-Finance PO POLISUMONI PS GOHPUR DIST SONITPUR PIN 784178 | BISWANATH | ASSAM | 784178 | ₹24.9 L+₹2.5 L (11.1%) | L3 | Rejected-Finance Refer to Financial minutes. |
| Sl No | Description | Qty | Unit | Nobab Chand Ahmed L2 | Powal Phukan L3 | Enamul Hassan Mondal L1 |
|---|---|---|---|---|---|---|
| 1.01 | clearing and grubbing road land including uprooting rank vegeation, grass, bushes, shrubs, samplings and trees grith upto 300mm, removal of stumpsoftreescutearlieranddisposaloftheunserviceablematerialsetc.as
directed | 0.07 | Ha | 55,808.98 ₹3,739.2 | 55,808.98 ₹3,739.2 | 50,228.08 ₹3,365.28 Lowest |
| 1.02 | Earth work in excavation of foundation of structures as per draw-ing and
Technical specification,(i) Ordinary soil | 665.24 | Cum | 144.59 ₹96,187.63 | 144.59 ₹96,187.63 | 130.13 ₹86,568.2 Lowest |
| 1.03 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming | 605.25 | Cum | 2,928.23 ₹17,72,311.21 | 2,928.23 ₹17,72,311.21 | 2,635.41 ₹15,95,081.9 Lowest |
| 1.04 | Providing and laying filter material under neath pitching in slopes complete as per drawing and technical specifications Clause 1302 | 33.62 | Cum | 1,986.11 ₹66,782.95 | 2,158.18 ₹72,568.8 | 1,942.31 ₹65,310.17 Lowest |
| 1.05 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dryin front of toe of embankment complete as per drawing and Technical specifications | 201.75 | Cum | 1,959.69 ₹3,95,367.46 | 1,959.69 ₹3,95,367.46 | 1,763.72 ₹3,55,830.51 Lowest |
| 1.06 | Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirment of table 300-2 (Including cost of testing of materials at site and laboratory as directed by the deptt.) | 493.25 | Cum | 271.92 ₹1,34,124.54 | 271.92 ₹1,34,124.54 | 244.73 ₹1,20,713.07 Lowest |
| 1.07 | Cost of RCC sign board including painting, writing & fitting fixing at project site, complete. | 1 | No. | 13,701.16 ₹13,701.16 | 13,701.16 ₹13,701.16 | 12,330.87 ₹12,330.87 Lowest |
Tender Value
₹24.9 L
EMD Value
₹49,760
Closing Date
19 Jan 2026, 1:00 pmClosed
Director of Soil Conservation
O/o The DSC, Bhumi sangrakshan bhanvan, RGB Road, Guwahati -05
River Training Project At Betbari (Khapati Pt III and IV) Village under RIDF-XXXI
2025_SCD_49657_12
Tender/NIT/Pt-I/2025-26/5725
Open Tender
Civil Works
Item Rate
120 days
Barpeta S. C. Division
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
₹49,760
Yes
O/o The DSC, Assam
30 May 2026
26 Dec 2025
19 Jan 2026
3 Jan 2026
19 Jan 2026
8 Jan 2026
7 Jan 2026
clearing and grubbing road land including uprooting rank vegeation, grass, bushes, shrubs, samplings and trees grith upto 300mm, removal of stumpsoftreescutearlieranddisposaloftheunserviceablematerialsetc.as directed
Earth work in excavation of foundation of structures as per draw-ing and Technical specification,(i) Ordinary soil
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming
Providing and laying filter material under neath pitching in slopes complete as per drawing and technical specifications Clause 1302
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dryin front of toe of embankment complete as per drawing and Technical specifications
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirment of table 300-2 (Including cost of testing of materials at site and laboratory as directed by the deptt.)
Cost of RCC sign board including painting, writing & fitting fixing at project site, complete.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BIDBarpetaBetbari.pdf
Tender Documents • 1.03 MB
BOQ_78875.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .