Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-Finance | L1 | Accepted-Finance L1 Bidder |
Tender Value
Refer Docs
EMD Value
₹3,600
Closing Date
26 Jun 2023, 2:00 pmClosed
Superintending Engineer
65/1 Ramamoorthy Road Virudhunagar
Works Contract for effecting various Agri and otherworks in Sattur sub division of Sivakasi Division
2023_EB_326981_1
SE/VREDC/AEE/MM/ET no 19, Dt 08.06.2023
Open Tender
Electrical Works
Works
365 days
Sattur sub division
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3,600
Yes
15 Jul 2023
13 Jun 2023
27 Jun 2023
13 Jun 2023
26 Jun 2023
13 Jun 2023
Amount
Works Contract for effecting various Agri & O&M works in Sattur sub division of Sivakasi Division
Loading & unloading of 9 Mtr Pole
Excavation of 9 mtr Pole
Erection of 9 mtr pole
Erection of Tapping Channel X-Arm
Erection of HT TI Fitting
Excavtion of Saty Set
Erection of Saty Complete
Paving and Stringing of 7/3.15 mm AAAC
Paving and Stringimg of 7/2.50 mm AAAC
Erection of 3 1/2 V X-Arm
Fixing of LT 3 Ph X-Arm
Pole Concreting
Transporting of 9 MTR Pole Road Side to Pole Pit
Transporting of 9.14 MTR Pole Road Side to Pole Pit
Loading & unloading of 9.0m Sqre pole
Excavation of Pole pit 9.0 m Sqre pole
Erection of pole 9.0 M Sqre pole
Fixing of Single pole TC set Suitable for seating 16KVA/25KVA and erection DT
Erection of LT Protection kit
Erection of HG,Fuse,11KV solid core Type
Erection of 11KV,200Amps,Single break Gos
Jumpering
Masonary work for each earth pit for 4Nos.earth trough and concreting
Excavation of 3Nos earth pit
Excavation of earth wire trenches and paving of earth wire erection 3Nos earth pipe and giving earth connection,earthing of all metal parts ,LAS etc including central connection
Concreting of Str Pole
Masonary work for earth pit and Str.Pole Coping
Painting with cement pole
Assemble of operating pipe fixing etc
Loading & unloading of DT
Transporting of 16 KVA DT
Erection of 16 KVA DT
Loading & unloading of 8 Mtr Pole
Excavation of 8 Mtr Pole in Rocky Ground
Excavation of 8 Mtr Pole in Normal Ground
Erection of 8.0 MTR Pole
Dismantling of 8.0 MTR Pole
Transporting of 8.0 MTR Pole
Excavation & Erection of Stay in Rocky Ground
Erection of S Ph X-Arm
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_387888.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .