| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.1 LAccepted-AOC 103 HARIAKSH PLAZA HOSPITAL ROAD BHUJ KUTCH GUIARAT 370001 | BHUJ | KUTCH | GUJARAT | 370001 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹23.8 L+₹2.7 L (12.8%)Rejected-Finance | L2 | Rejected-Finance Other than L1 | |
| 3 | L3₹25.6 L+₹4.5 L (21.1%)Rejected-Finance | L3 | Rejected-Finance Other than L1 | |
| 4 | L4₹26.7 L+₹5.6 L (26.3%)Rejected-Finance | L4 | Rejected-Finance Other than L1 | |
| 5 | L5₹27.9 L+₹6.8 L (31.9%)Rejected-Finance KRISHNA SOCIETY OPP TODI XRAY AND DIAG CENTRE MAKUM ROAD TINSUKIA ASSAM 786125 | TINSUKIA | ASSAM | 786125 | L5 | Rejected-Finance Other than L1 |
| Sl No | Description | Qty | Unit | Santokh Singh and Associates L4 | M/S JASPAL CONSTRUCTION CO L3 | M/s Vijay Construction Co. L1 | Chander Mohan Arora Contractor L2 | ss enterprises L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits,manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out soft/loose soil complete all as specified and directed. | 364.5 | Cum | 120 ₹43,740 | 100 ₹36,450 Lowest | 150 ₹54,675 | 150 ₹54,675 | 100 ₹36,450 Lowest |
| 2.00 | All as per item no 1 here in before but exceeding 1.5m deep and not exceeding 3m deep complete all as specified and directed | 15 | Cum | 150 ₹2,250 Lowest | 150 ₹2,250 Lowest | 170 ₹2,550 | 200 ₹3,000 | 150 ₹2,250 Lowest |
| 3.00 | Returning, filling in, including spreading, leveling watering and well ramming in layers not exc 25 cm with excavated soil complete all as specified and directed. | 352.4 | Cum | 50 ₹17,620 | 30 ₹10,572 Lowest | 30 ₹10,572 Lowest | 30 ₹10,572 Lowest | 30 ₹10,572 Lowest |
| 4.00 | Removing excavated material soils, not exc 50m and depositing where directed at level not exc 1.5m above the starting point complete all as specified and directed. | 20 | Cum | 150 ₹3,000 | 50 ₹1,000 | 40 ₹800 | 50 ₹1,000 | 30 ₹600 Lowest |
| 5.00 | Demolition and breaking up drain pipes of 150mm internal dia of bore SGSW, AC or reinforced concrete pipe set in cement mortar complete all as specified. | 350 | RM | 20 ₹7,000 | 20 ₹7,000 | 10 ₹3,500 | 10 ₹3,500 | 5 ₹1,750 Lowest |
| 6.00 | Demolition and breaking up drain pipes of 200mm internal dia of bore SGSW, AC or reinforced concrete pipe set in cement mortar complete all as specified. | 300 | RM | 25 ₹7,500 | 20 ₹6,000 | 10 ₹3,000 | 20 ₹6,000 | 5 ₹1,500 Lowest |
| 7.00 | Demolition and breaking up drain pipes of 300mm internal dia of bore SGSW, AC or reinforced concrete pipe set in cement mortar complete all as specified. | 50 | RM | 30 ₹1,500 | 25 ₹1,250 | 10 ₹500 | 30 ₹1,500 | 5 ₹250 Lowest |
| 8.00 | M&L for 150 mm bore dia Reinforced concrete pipes Class NP 3 pipes laid and jointed with collar complete all as specified and directed. | 120 | RM | 600 ₹72,000 | 583 ₹69,960 | 450 ₹54,000 Lowest | 600 ₹72,000 | 600 ₹72,000 |
| 9.00 | Supplying, laying in trenches, jointing and testing salt glazed stoneware pipe grade 'A' drainpipe 150mm bore conforming to IS at any depth over PCC bed, jointed with cement morter 1:3 complete all as specified & directed. | 150 | RM | 300 ₹45,000 | 400 ₹60,000 | 350 ₹52,500 | 325 ₹48,750 | 250 ₹37,500 Lowest |
| 10.00 | Supplying, laying in trenches, jointing and testing salt glazed stoneware pipe grade 'A' drainpipe 200mm bore conforming to IS at any depth over PCC bed, jointed with cement morter 1:3 complete all as specified and directed. | 160 | RM | 350 ₹56,000 | 550 ₹88,000 | 400 ₹64,000 | 380 ₹60,800 | 200 ₹32,000 Lowest |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
2 Jul 2026, 6:00 pmClosed
GE NAMS
GE NAMS Amritsar
CERTAIN REPAIR TO SEWAGE LINE, MANHOLE AND ALLIED WORKS UNDER AGE B/R-II UNDER GE NAMS
2026_MES_771924_1
GE NAMS-35/2026-27
Open Tender
Civil Works
Item Rate
270 days
GE NAMS
CLASS D CATEGORY a (ii)
8 documents required · 8 mandatory
₹500
GE NAMS
₹60,000
20 Aug 2026
12 Jun 2026
6 Jul 2026
12 Jun 2026
2 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits,manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out soft/loose soil complete all as specified and directed. | 364.5 | Cum | - | - |
| 2 | All as per item no 1 here in before but exceeding 1.5m deep and not exceeding 3m deep complete all as specified and directed | 36 | Cum | - | - |
| 3 | Returning, filling in, including spreading, leveling watering and well ramming in layers not exc 25 cm with excavated soil complete all as specified and directed. | 352.4 | Cum | - | - |
| 4 | Removing excavated material soils, not exc 50m and depositing where directed at level not exc 1.5m above the starting point complete all as specified and directed. | 48 | Cum | - | - |
| 5 | Demolition and breaking up drain pipes of 150mm internal dia of bore SGSW, AC or reinforced concrete pipe set in cement mortar complete all as specified. | 350 | RM | - | - |
| 6 | Demolition and breaking up drain pipes of 200mm internal dia of bore SGSW, AC or reinforced concrete pipe set in cement mortar complete all as specified. | 300 | RM | - | - |
| 7 | Demolition and breaking up drain pipes of 300mm internal dia of bore SGSW, AC or reinforced concrete pipe set in cement mortar complete all as specified. | 50 | RM | - | - |
| 8 | M&L for 150 mm bore dia Reinforced concrete pipes Class NP 3 pipes laid and jointed with collar complete all as specified and directed. | 120 | RM | - | - |
| 9 | Supplying, laying in trenches, jointing and testing salt glazed stoneware pipe grade 'A' drainpipe 150mm bore conforming to IS at any depth over PCC bed, jointed with cement morter 1:3 complete all as specified & directed. | 150 | RM | - | - |
| 10 | Supplying, laying in trenches, jointing and testing salt glazed stoneware pipe grade 'A' drainpipe 200mm bore conforming to IS at any depth over PCC bed, jointed with cement morter 1:3 complete all as specified and directed. | 160 | RM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_864401.xls
BOQ • 14.02 MB
35T.pdf
Tender Documents • 1.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .