Tender Value
₹2.1 Cr
EMD Value
₹4.3 L
Closing Date
5 Mar 2026, 10:00 amClosed
Executive Engineer
Canal Rest House, Handiaya 148107
Estimate for Brick Lining (Rectangular shape ) from RD 0 to 17081 of Sub Minor no. 3 of Handiaya Minor
2026_WR_160267_3
36/2025-26
Open Tender
Civil Works - Canal
Item Wise
90 days
Canal Rest House, Handiaya
as per tender notice
2 documents required · 2 mandatory
₹2,000
Yes
₹4.3 L
Yes
Canal Rest House, Handiaya
24 Apr 2026
14 Feb 2026
5 Mar 2026
14 Feb 2026
5 Mar 2026
14 Feb 2026
20 Feb 2026
Ordinary Jungle Clearance of both banks of running Disty., Minors and Drains including Boundary road with discharge upto 1.50 cumecs.
Dismentalling Of Brick Work
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads with disposal with an avg lead
Extra for compaction of earth including laying earth in 20cm layers, watering and rolling to specifications
First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth For Bed
First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth For Side walls
12.5 mm thick Cement Plaster 1:4 ( for bed, top of walls )
Dressing of Earthwork for new work.
Dressing of bed and preparation of sub grade
12.5 mm thick Cement Plaster 1:4 ( Internal side )
Providing and fixing distance marks
Earthwork Excavation from canal using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m
Earthwork involved in constructing new O.F,A.P.M. or O.S.M. type outlets with 'H' more than 0.5 m but upto 0.9 m
Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling i.e. R.C. Slab and cement Masonry with 'H' more than 0.5m but upto 0.9 m
Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.5m but upto 0.9 m
PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
Laying Reinforced cement concrete (M-20) mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrated but excluding steel reinforcement, centering and shuttering in foundation and plinth
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc
Cold twisted deformed(Ribbed/ Tor Steel Bar) Bars Fe 500 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and
Supply of outlet
Any other item
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.93 MB
boqsubminor3.xls
Additional Documents • 0.05 MB
boqwithquantiysubminor3.rar
PDF • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .