| 1.00 | Conducting check survey, pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead, lift etc., complete. | 66 | Loc. | 2,730 ₹1,80,180 Lowest |
| 2.00 | Earth work excavation in all type of soil with an initial lead of 10m and all lift etc., complete.for foundation. In Hard gravelly soil | 2,709 | m3 | 138 ₹3,73,842 Lowest |
| 3.00 | Earth work excavation in all type of soil with an initial lead of 10 m and all lift etc., complete for foundation In soft distengrated rock not requiring blasting | 417 | m3 | 205 ₹85,485 Lowest |
| 4.00 | Earth work excavation in all type of soil with an initial lead of 10 m and all lift etc., complete for foundation In medium rock and dense medium rock requiring blasting | 417 | m3 | 390 ₹1,62,630 Lowest |
| 5.00 | Earthwork excavtion in hard rock measured in solid including blasting with an initial lead of 10 m and all lift etc., complete for foundation. | 417 | m3 | 400 ₹1,66,800 Lowest |
| 6.00 | Earth work excavation in all type of soil with an initial lead of 10 m and all lift etc., complete.for foundation.Hard rock requires wedging & chessling | 208 | m3 | 1,500 ₹3,12,000 Lowest |
| 7.00 | Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour, fuel, oil, transport,T&P etc., complete. | 840 | Hrs | 20 ₹16,800 Lowest |
| 8.00 | Providing shoring and shuttering during excavation and concreting works using country wood planks and scantlings including cost of all materials ,labour charges, lead and lift etc., complete as directed by the Engineer incharge at site. | 1,449 | m2 | 20 ₹28,980 Lowest |
| 9.00 | Fixing of templates, stub and cleat for GCR tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. | 42 | Loc | 11,500 ₹4,83,000 Lowest |
| 10.00 | Fixing of templates, stub and cleat for HCR tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials, fabrication charges, labour, lead, lift etc., complete. | 15 | Loc | 26,150 ₹3,92,250 Lowest |
Tender Value
Refer Docs
EMD Value
₹6.4 L
Closing Date
23 Nov 2022, 2:30 pmClosed
CE/TP and SO/CHN
O/o the Chief Engineer/Transmission Projects, so/ Chennai, 3rd Floor , 230 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32
Earth work Excavation, stub setting, Concreting, supply and erection of towers of 110KV SC line on DC tower with Supply and stringing of 3nos.of panther Conductor and 1No. of GI Earthwire from Loc.No.84 of existing Uddanapalli 110KV SS to the existin
2022_EB_263228_1
TP1-118/2022-23
Open Tender
Civil Works
Works
270 days
KEMPATTY
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6.4 L
Yes
13 Jan 2023
11 Nov 2022
24 Nov 2022
11 Nov 2022
23 Nov 2022
11 Nov 2022
Amount
Conducting check survey, pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead, lift etc., complete.
Earth work excavation in all type of soil with an initial lead of 10m and all lift etc., complete.for foundation. In Hard gravelly soil
Earth work excavation in all type of soil with an initial lead of 10 m and all lift etc., complete for foundation In soft distengrated rock not requiring blasting
Earth work excavation in all type of soil with an initial lead of 10 m and all lift etc., complete for foundation In medium rock and dense medium rock requiring blasting
Earthwork excavtion in hard rock measured in solid including blasting with an initial lead of 10 m and all lift etc., complete for foundation.
Earth work excavation in all type of soil with an initial lead of 10 m and all lift etc., complete.for foundation.Hard rock requires wedging & chessling
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour, fuel, oil, transport,T&P etc., complete.
Providing shoring and shuttering during excavation and concreting works using country wood planks and scantlings including cost of all materials ,labour charges, lead and lift etc., complete as directed by the Engineer incharge at site.
Fixing of templates, stub and cleat for GCR tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete.
Fixing of templates, stub and cleat for HCR tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials, fabrication charges, labour, lead, lift etc., complete.
Fixing of templates, stub and cleat for KCR tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete.
PCC 1:3:6 using 20mm metal for Revetment and tower foundation without formwork including cost of cement, all materials , labour, lead, lift, curing ,consolidation using vibrators, hire charges for T&P etc complete.
PCC 1:2:4 using 20mm metal for tower foundation Frustum concrete with formwork including cost of cement, all materials , labour, lead, lift, curing ,consolidation, using vibrators, hire charges for T&P etc complete.
PCC 1:2:4 using 12 to 20mm HB Stone for foundation Chimney portion and mupping and copping work with steel form work including cost of cement all materials labour etc., complete.for chimney,muffing & coping
Refilling with the excavated earth for GCR (Dry) type tower other than sand including watering, consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete.
Refilling with the excavated earth for GCR (Wet) type tower other than sand including watering, consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete.
Refilling with the excavated earth for HCR (Wet) type tower other than sand including watering, consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete.
Refilling with the excavated earth for KCR (Wet) type tower other than sand including watering, consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete.
Refilling with the excavated earth for KCR (Dry) type tower other than sand including watering, consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete.
Refilling with the excavated earth for HCR (Dry) type tower other than sand including watering, consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete.
Removal of surplus earth in a low lying area to a average distance of 200m by head load as directed by the Engineer at site.
Providing Pipe type earthing to towers including all materials G.I pipe 3 m length required length of Earth wire and welded with washer at end connecting with Tower leg and all lead, lift etc., complete.As directed by the Engineer at site.
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of cement, all materials , labour, lead, lift, curing ,consolidation using vibrators, hire charges for T&P etc complete.
Labour charges for Erection of various tower parts etc as per drawing including sorting out at site , erection, tightening , punching , final checking, providing holes wherever necessary and final checking etc., complete including cost of all labour charges etc., complete.
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
Labour charges for transporting and hoisting of 7 units of 90 KN insulators for Panther and fixing of SS fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. Without PA rod for Panther.
Labour charges for transporting and hoisting of 8 units of 120 KN insulators for Panther and fixing of ST fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. Without PA rod for Panther
Labour charges for transport of 3 Nos. of Panther conductor paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. ( For Span )
Labour charges for transport of 3 Nos. of Panther conductor paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. ( For Kms )
Labour charges for transport of 7/3.55mm GI earthwire fixing of GI earthwire hardwares (ie ST fittings,SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing, rough sagging, tensioning, including jumber connection transport charges, loading, unloading ,lead, lift, cost of T&P, etc complete. ( For Span)
Labour charges for transport of 7/3.55mm GI earthwire fixing of GI earthwire hardwares (ie ST fittings,SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing, rough sagging, tensioning, including jumber connection transport charges, loading, unloading ,lead, lift, cost of T&P, etc complete. (For Kms )
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead, lift, etc., complete.
Providing temporary guys wherever necessary including excavation, buryingout of anchor for staywire, tightening, dismantling the same after completion of works including cost of all materials, lead, lift, labour, etc., complete.
Providing well supported upto 5 m trussels for Highways, Telepohone lines crossings during paying out,rough sagging and tensioning of power conductors and earth wire including cost of bamboo, coir and labour for excavation etc., complete.
Painting with two coats of anticorrosive paint over tower leg at a height of 45 cm including all cost of materials, labour, lead, lift, etc., complete.
Clearing heavy Juliflora jungle without uprooting for carrying out the stringing works
Supply, fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line, etc., complete.
Supply, Transport and fixing of Number plate in the tower leg with all lead & lift ,etc., complete
Supply, Transport and fixing of Danger board in the tower leg with all lead & lift ,etc., complete
Supply, Transport and fixing of Phase plate in the tower leg with all lead & lift ,etc., complete
Labour charges for cutting, uprooting and romoving of small trees from the line including the hire charges for T & P etc. complete
Labour charges for cutting, uprooting and romoving of large trees from the line including the hire charges for T & P etc. complete
Supply, Transport and fixing of Aluminium Earth bond as per design drawing and specifications
Supply, Transport and fixing of 16 mm dia bolt and nuts Hanger bolt as per design drawing and specifications
Supply, Transport and fixing of D-shackle as per design drawing and specifications
Supply, Transport and fixing of SB damber for panther as per design drawing and specifications.
Supply, Transport and fixing of Repair sleeve for Panther as per design drawing and specifications
Supply, Transport and fixing of Mid span joint for Panther as per design drawing and specifications
Supply, Transport and fixing of Repair sleeve for Earthwire as per design drawing and specifications
Supply, Transport and fixing of Mid span joint for earthwire as per design drawing and specifications
Supply, Transport and fixing of Single Suspension fittings for Panther as per design drawing and specifications.
Supply, Transport and fixing of Single Tension fittings for panther as per design drawing and specifications.
Supply, Transport and fixing of Single Tension fittings for Earthwire including cost of all materials lead and lift etc complete.
Supply, Transport and fixing of of Single suspension fittings for Earthwire including cost of all materials lead and lift etc complete
Supply, Transport and fixing of PA Rod for Panther as per design drawing and specifications
Fabrication, galvanisation and supply of standard MS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost).
Supplying, Transportation from source to site , fabrication, galvanising of standard Bolts and nuts of various sizes and various lengths as per department approved drawing including all taxes and duties, lead, lift and head load, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer at site.
Supply of line materials ACSR Panther conductor as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
Supply of line materials 7/3.55mm GI earthwire as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
Supply of line materials 90 KN Suspension Insulator as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
Supply of line materials 120 KN Tension Insulator as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .