Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC JAITPUR JAYANT SINGRAULI PIN 486890 | JAYANT | SINGRAULI | MADHYA PRADESH | 486890 | L1 | Accepted-AOC As per TC recommendation and approval. |
Tender Value
₹4.3 L
EMD Value
₹5,400
Closing Date
27 Jul 2024, 10:00 amClosed
M K Pandey, SO(Excavation)
O/o AGM, Bina Area, NCL, District Sonebhadra (UP), Pincode 231220
Repairing / Overhauling of EOT service crane and main overhead crane of 24/96 Saurav Dragline working at Bina Project
2024_NCL_312475_1
Bina/SO(Excv)/Tender/24-25/21 dt 12.07.2024
Open Tender
Excavation Department Work
Item Rate
6 days
Bina Project, NCL
As per NIT
5 documents required · 5 mandatory
₹5,400
1 Nov 2024
12 Jul 2024
29 Jul 2024
13 Jul 2024
27 Jul 2024
13 Jul 2024
13 Jul 2024 - 20 Jul 2024
Amount
Repairing / overhauling of EOT Service Crane of 24/96 Saurav Dragline
Hoist brake liner 2040/305/104
C.T. brake liner Pt 20403
L Rivet Pt. 20401
Oil Seal
2.5 Sq. mm 8 core Copper cablel PVC
C.T. Tripping Brake Assembly
Brake Shoes changing
Timer rating 0.05-60 sec
Repairing of Thirstier Brake assembly
Main shaft coupling 20407/350/3
H L C Auxiliary Contactor
Auxiliary Contactor 3TA-22-10
Hoist Drum Brake Coupling 20402/05
4 Sq. mm 3 core copper cable
Charges including contractors profit for Repairing / overhauling of EOT Service Crane of 24/96 Saurav Dragline. (Labour consists of 02 nos. skillled (Electrician & Fitter) for a period of 6 shiftdays (1 Shift X 6 days), 2 nos. Semi-skilled for a period of 6 shiftdays (1 Shift X 6 days), 1 no. Unskilled for a period of 6 shiftdays (1 Shift X 6 days)and 1 no. Supervisor for a period of 6 shiftdays (1 Shift X 6 days))
Repairing / overhauling of Main Overhead Crane of 24/96 Saurav dragline
Charges including contractors profit for dismantling of gearbox of hoisting system, forward and reverse system, side movement system (Labour consists of 4 nos. Skilled for a period of 6 shiftdays (1 Shift X 6 days), 4 nos. Semi-skilled for a period of 6 shiftdays (1 Shift X 6 days), 3 nos. Unskilled for a period of 6 shiftdays (1 Shift X 6 days) and 1 no. Supervisor for a period of 6 shiftdays (1 Shift X 6 days)) .
Checking of Wheel alignment for LT &CT for smooth operation (1 day)
Complete lubrication of entire crane at LT & CT Wheel, Wheel gear, 6 hoist pulley , lifting ,hook, rope etc. Applying fresh grease on all coupling (1 day)
Cleaning of all contractor tip (1 day)
Checking complete electric circuit & tightening of loose connection (1 day)
Cleaning of hoist rope and cardium compounding (1 day)
Total impact of GST for the purpose of CTC
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_323829.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .