Tender Value
₹16.8 Cr
EMD Value
₹33.5 L
Closing Date
7 Sept 2026, 3:00 pm
ACE WR Zone Jaipur
O/o of Additional Chief Engineer Water resources Zone Sinchai Bhawan JLN Marg Jaipur
Repair and Renovation of Morel Main Canal System District Sawai Madhopur
2026_WRDAS_588114_1
ACE NIT 09/2026-27_Morel
Open Tender
Civil Works
Percentage
730 days
under jurisdiction of EE Sawai Madhopur Division
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
as per nit
₹33.5 L
Yes
Jaipur
14 Aug 2026
14 Aug 2026
8 Sept 2026
14 Aug 2026
7 Sept 2026
14 Aug 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Block joints of foundation stilling basins buckets, aprons etc. (non -suspended horizontally laid mass concrete) | 10,476.48 | Sqm | 160 | ₹16,76,236.8 |
| 2 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Top or intermediate bed plates, in between masonry or piers, abutments sluice wells etc. | 242.64 | Sqm | 185 | ₹44,888.4 |
| 3 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. In foundation rafts, beams, columns bases stilling basins, buckets, aprons etc. (non suspended horizontally laid mass concrete) | 614.1 | Cum | 140 | ₹85,974 |
| 4 | Centering and shuttering for slabs, beams, lintels Columns, trough with or without caps and base including propping and remove | 1,093.5 | Sqm | 225 | ₹2,46,037.5 |
| 5 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) | 41,073.64 | Kg. | 78 | ₹32,03,743.92 |
| 6 | Design, Drawing, fabrication, supply, erection, testing and commissioning of Vent liners (steel liners for sluice/tunnel or as per requirement in Dam/irrigation system) including Embedded parts consisting of liner plates, anchors, stiffeners, girders, fasteners etc. and any required necessary item, with all accessories for all types of Gates/ sluice channels/ any section of water resources projects including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, tools and tackles, applying two coat of zinc rich epoxy primer to give dry film thickness of 70 5 microns and finish coat (two coats) of solvent less coal tar epoxy paint using airless spray to provide dry film thickness of 150 5 microns per coat thus total dry film thickness of all coats, including primer coating, should not be less than 350 microns., including packing & forwarding, transportation charges complete, as per specifications and approved drawings. | 10 | Tonne | 1,09,721.2 | ₹10,97,212 |
| 7 | Dismantling cement concrete including disposal of material within 50 m lead, inclusive of de-watering wherever required. | 302 | Cum | 646 | ₹1,95,092 |
| 8 | Demolishing stone rubble masonry including stacking of usable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required.In cement mortar | 244.8 | Cum | 489 | ₹1,19,707.2 |
| 9 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Thick | 18,06,641.8 | Sqm | 2.5 | ₹45,16,604.5 |
| 10 | Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of: 75 mm | 570.1 | Sqm | 480 | ₹2,73,648 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
Morel.pdf
Tender Documents • 3.18 MB
BOQ_1044410.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].