Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 0 DHANA TEJA BARARI DHANA TEJA MATHURA MATHURA UTTAR PRADESH 281005 | MATHURA | UTTAR PRADESH | 281005 | Admitted-Finance |
| 2 | Admitted-Finance 248 1 CHHEDIPURWA STATION ROAD BEHIND GURU NANAK SCHOOL GONDA UTTAR PRADESH 271001 | GONDA | UTTAR PRADESH | 271001 | Admitted-Finance |
| 3 | Rejected-Technical MIRZAPUR MUMTAZ NAGAR AYODHYA AYODHYA UTTAR PRADESH 224001 | AYODHYA | UTTAR PRADESH | 224001 | Rejected-Technical Reject |
Tender Value
₹17.0 L
EMD Value
₹17,100
Closing Date
26 Sept 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EWC GONDA
SE EWC DEVIPATAN ZONE GONDA
04/EWC(G)/2023-24
2023_MVVNL_838928_2
NVS_03-04/EWC(G)/2023-24
Open Tender
Electrical Works
Item Rate
90 days
EWC GONDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
EE EWD GONDA
₹17,100
Yes
5 Oct 2023
16 Sept 2023
27 Sept 2023
16 Sept 2023
26 Sept 2023
16 Sept 2023
Amount
Safe Loading carriage for 33/11 KV Substation Chandawatpur Ghat Gonda including unloading & proper stacking of following store S/S materials from ESC Gonda/JE store to site of work. (15 Km Approx). All the material at Sl No. 1 shall be given by department and rest all the material including civil material will be arranged by the contractor itself. Any other material if required for completion of work which might not have been mentioned in bid document, shall be arranged by the contractor.
33 KV Bus Isolator
33 KV VCB 800A, 750MVA
33 KV CT 200/100/1-1A
Single T/F Control Pannel
33 KV Post Insulator
33 KV Lightenning Arrestor
90 LBS rail Piece for T/F
11 KV Incoming Switch gear 400/200/5A,250 MVA, 630 A
11 KV Outgoing Switch gear 200/100/5A, 250 MVA
11 KV 3x300 mm2 XLPE cable
11 KV 3x120 mm2 XLPE cable
ST Pole (11 Mtr long)
ACSR DOG Conductor
Steel Sections(M.S Channel, M.S. Angle etc)
11 KV cable jointing kit indoor 3x300sq mm xlpe
11 KV cable jointing kit outdoor 3x300sq mm xlpe
11 KV cable jointing kit indoor 3x120sq mm xlpe
11 KV cable jointing kit outdoor 3x120sq mm xlpe
Polymeric Pin insulator 33 KV
Stay Set complete 20x1800mm
Earth Rod with G.I. wire 6 S.W.G.
Safe Loading carriage for 33/11 KV Substation Khutehna Bahraich including unloading & proper stacking of following store S/S materials from ESC Bahraich/JE store to site of work. (45 Km Approx). All the material at Sl No. 1 shall be given by department and rest all the material including civil material will be arranged by the contractor itself. Any other material if required for completion of work which might not have been mentioned in bid document, shall be arranged by the contractor.
33 KV Bus Isolator
33 KV VCB 800A, 750MVA
33 KV CT 200/100/1-1A
Single T/F Control Pannel
33 KV Post Insulator
33 KV Lightenning Arrestor
90 LBS rail Piece for T/F
11 KV Incoming Switch gear 400/200/5A,250 MVA, 630 A
11 KV Outgoing Switch gear 200/100/5A, 250 MVA
11 KV 3x300 mm2 XLPE cable
11 KV 3x120 mm2 XLPE cable
ST Pole (11 Mtr long)
ACSR DOG Conductor
Steel Sections(M.S Channel, M.S. Angle etc)
11 KV cable jointing kit indoor 3x300sq mm xlpe
11 KV cable jointing kit outdoor 3x300sq mm xlpe
11 KV cable jointing kit indoor 3x120sq mm xlpe
11 KV cable jointing kit outdoor 3x120sq mm xlpe
Polymeric Pin insulator 33 KV
Stay Set complete 20x1800mm
Earth Rod with G.I. wire 6 S.W.G.
Plinth of 5 MVA, for 33/11 KV T/Fs - Construction of Plinth of size 3.46x3.46 Mtr suitable for 5 MVA to 10 MVA T/F Plinth decided by E/I. The work includes Excavation of foundation, base concreting in C.C. 1:6:12 ratio (cement, coarse sand and brick ballast) Ist Class bricks work in cement mortar of ratio 1:4 foundation, C.C.in 1:4:8 ratio (cement, coarse sand and brick ballast) and RCC working ratio 1:2:4 (cement, coarse sand and stone grit of 20 mm gauge) using MS Bars of 10 mm Dia (Tor) in reinforcement including its cutting, bending and binding in required shape. The work also includes laying of 2 Nos. 3.46 mts long each rail pieces complete with cutting, welding and proper fitting etc. The Plinth will be made as per Drawing and shall be plastered/ finished on Top and Side of the Plinth.
Earth filling in the switchyard at low land area including cost of earth handling and cartage upto switchyard from out side with ist unloading and laying in the yard leveling watering and ramming till its compatness
Fabrication, Erection & Grouting of Sub Station Structure
Bus Isolator Structure - Fabrication of isolator structures 3.5mtr in height as per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x0.9 xO.3 Mtr providing stone pad at the bottom of the pit and grouting pad at the bottom of the pit and grouting of two legs of the isolator structure in CC (cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 mtx 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, shifting upto 40 Mtr., Raising and erecting the two legs with runner of Isolator in proper allingment level and plumb. Both Plinths of the Isolator structure shall be properly finished with champering of edges.
Lightening Arrestor Structure - Fabrication of Lightening Arrestor per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.3 xO.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the above structure in CC (cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 Mtr x 0.3 Mtr x 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, shifting upto 40 Mtr. Raising and erecting the two legs with Top frame above structure's in proper allignment level and plumb. Both Plinths of the structure shall be properly finished with champering of edges etc.
Post Insulator/C.T. Structure - Fabrication of Post Insulator per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.3 x O.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the above structure in CC (cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 Mtr x 0.3 Mtr x 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with Top frame above structure's in proper allingment level and plumb. Both Plinths of the structure shall be properly finished with champering of edges etc.
Plinth for 33 KV VCB - Construction of Plinth of 2.0X1.5X0.9(mtr) suitable for erection of super structure 33 KV VCB including grouting of Anchor boards in proper alligntment and level. Scope of work incluldes exvacation of foundation base concreting base CC 1:6:12(cement, Coarse sand and brick ballast) first class brick work in cement mortar of ratio 1:4 CC in ratio 1:4:8 and RCC work in ration 1:2:4(Cement, coarse sand and stone grid of 20 mm gaze) as per drawing.
Erection and Installation Of 33/11 KV 5 MVA Transformer
Erection and installation of 33/11 KV, 5 MVA Transformer in a leveled position on the Plinth. The work include shifting of transformer to the site of installation with in the Sub-Station premises, assembling, fixing and fitting of all accessories and filling of transformer oil to the desired level and ensuring that there is no leakage.
Fabrication and grouting of M.S. Angle 65x65x6 mm in L shape & in proper size and allignment to provide support for the two separate earthing strips for Power Transformer Neutral including supply & fixing of two Nos Flexible Copper bonds for neutral earthing.
Fabrication and erection of cable support made of two pieces of M.S. Strip 65 x 65 x 6 mm, 3.0 Mtr long joined to each other by means of 5 Nos M.S. Flat 5Ox6mm pieces of size 150 mm long each by welding at equal intervals as per drawing and grouting in a block of size 300 x 300 x 700 mm complete with one coat of ready mixed primer and two coats of Alluminum Paint. This includes providing of four Nos. M.S.clamp made of M.S. flat for holding the Cable including nuts and Bolts and fixing of XLPE cable.
Special Earthing by way of boring and lowering of "B" class G.I. pipe 50mm Dia, 20Mtr long from ground upto the water level and it will be connected to the G.S. strip size 50X6mm for transformer neutral connection. The earth strip will be welded to the G.I. Pipe. The work also includes Cap & Clamps for pouring water, the cost of all material with all labour & T&P etc. Complete in all respect.
Body earthing of 5 MVA T/F
Neutral of Transformer
Lightening Arrestor
C.T. Structure
Installation of Isolators - Assembling and installation of Bus isolator on the Isolator structure, adjusting of opening mechanism in proper alignment so as to ensure smooth operation of the same. In case of line Isolator proper operation of earth links shall also be ensured. The work includes fabrication for proper fixing if required.
Installation of lightning Arrestors - Assembling and installation/ mounting of three Nos. Lightening Arrestors on the L.A. structure/ complete with making earth connection (Separate) and line connections. The work includes fabrication for proper fixing if required.
Installation of Post Insulator - Installation of 3 Nos Post Insulators on the post insulators. The work includes fabrication for proper fixing if required
Installation of CT's - Installation of 3 no. CT's of ratio 200/100/1 amp. On the Ct's structure. The work includes fabrication for proper fixing if required.
Installation of VCB - Installation of 33 kv VCB 800 amp capacity complete in all respect including commissioning.
Installation of Switchgears in Control Room
Shifting, carefully and safely 11 KV Switchgear from out side of the , switch gear room, Including grouting the two Nos. 100x50x6mm channels pieces (each 800mm long including cutting to size) and, foundation Bolts in 1:2:4 CC (Including cutting of CC of the floor and finishing of Floor) as per direction of Engineer Incharge, Placing and fixing of switchgear on foundation providing nuts & bolt of proper size in proper position in the alignment and filling of oil in tank after cleaning and checking, complete work with mounting of P.T. on incoming S/G.
Fixing and making Bus Bar connection in between all switchgears after cleaning and tapping with H.T. tape, Empire tape and PVC tape properly Providing and fixing of 6mm thick bakelite seperators and plugging of all opening and holes with plastic compound. complete work including cost of all material ( Except Copper Bus Bars) Strictly to the satisfaction of site incharge
Shifting carefully and installation of 33 KV VCB single transformer pannel in control room including grouting of above and its proper connection.
Earthing of 11 KV & 33 KV Switchgear
Earthing of all indoor equipment by providing and laying G.S. strip 50 x 6 mm including cutting, welding, bending etc.
Providing and laying of G.S. strip of size 50x6mm for connecting the earth mat with the super structure as well as body and neutral of power T/F, 33 kv VCB, C.T. structure, L.A. structure, post insulator structure up to equipments including digging of trench 500x750mm (approx) deep till existing earth mat, bending, cutting, straightening and welding of the earth strip with the earth mat and various street structure using high quality Arc welding. The work include proper overlapping of the strip and jointing by welding .
H.T. Cable Laying
Laying & dressing of 11 KV, 3x300 Sq.mm XLPE Cable underground from 5 MVA T/F to 11 KV incoming switchgear in the trench 450mm wide, 900mm deep, providing 150mm fine sand cushion bench and 150mm fine sand cushion above the cable. The cable shall be duly protected by 1st class bricks two either side and third on top of the cables. The cable shall be duly protected by 1st class bricks two either side and third on top of the cables, laid in series one after the other, the work includes supplying of fine sand and bricks, refilling and ramming of the left out soil, closing the trench and leveling. Spare cable shall be left and buried in the trench in the safe of rings at both ends. Cable laying work includes unrolling, cutting, meggering and sealing both end of the cable.
Laying & dressing of 11 KV, 3x120 Sq.mm ground cable in the trench 450mm wide, 900mm deep, providing 150mm fine sand cushion bench and 150mm fine sand cushion above the cable. The cable shall be duly protected by1st class bricks two either side and third on top of the cables, laid in series one after the other, the work includes supplying of fine sand and bricks, refilling and ramming of the left out soil, closing the trench and leveling. Spare cable shall be left and buried in the trench in the safe of rings at both ends. For the protection of the cable 100mm Dia G.I.pipe has to be worn on the Cable where the cable is to be laid across PUCCA/Main Road/ Nallah. Cable laying work includes supply of G.I.Pipe, unrolling, cutting, meggring & sealing both ends of the cable.
Hoisting of 11 KV cable, cable box, fixing with clamp nut & bolt with proper clamping with provision of G.I. pipe 3 mtr long of 150 mm dia.(All material will be supplied by the contractor)
Fixing and erection of cable jointings kits suitable for following sizes of 11 KV XLPE cable of 11 KV cables. With housing of 3.5Mtr long 100 sq.mm. Dia G.I.pipe with feeder cable at feeder D/P.
11 KV 3x300 sq.mm. indoor jointing kit
11 KV 3x300 sq.mm.outdoor jointing kit
11 KV 3x120 sq.mm. indoor jointing kit
11 KV 3x120 sq.mm. outdoor jointing kit
Erection & Grouting of 2 Nos 11Mtr STP support for making D/P structure Including fabrication, Fixing of MS Channel, M.S. angle etc. The work Includes supply and fixing of necessary clamp with nut, bolts and washers & Stay set including grouting. The work also includes grouting of double pole supports in CC 1:4:8 in block of size 0.45Mtr into 0.45Mtr into 2.0Mtr earthing of Double pole with M.S. earthing rod, complete in all respect. Painting of one Coat of Red Oxide Primer and Two Coats of Aluminum paint of good quality. (All material excluding 2 Nos of STP will be provided by contractor.)
Supply & Laying of 2x2.5 sq.mm./ 4x2.5 sq.mm. control cable by construction of trench pakka as per requirement.(All the materials will be provided by contractor as well as Cement, sand bricks, stone , grit, control cable of sizes etc.
Supply, laying and Fixing of lnterlocking Bricks in the Switchyard 1.5 Mtr wide. Making approach path after Proper leveling and finishing etc. The work includes cost of all the material.
Painting of Structure Painting of following structure with one coat of ready mixed primer and 2 coats of AL.Paint of good quality including cost of material, Labour and T&P complete in all respect. The work includes cost of all the material.
Bus/Line Isolator Structure
Lightening Arrestor
Post Insulator Structure
Cable Stand
Neutral Stand
VCB & CT Structure
Supply, fixing and mounting of following equipments/ items in the control room
Rubber matting one side chequered and other side plane size 1800x900x12mm
Rubber hand gloves
Commissioning of 01 No. 5MVA T/F and its eqipments installed in switchyards and 11 KV Incoming and Outgoing Pannels complete in all respect upto energising.
M/s S.K. Construction
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .