Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC | ₹3.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹3.1 L+₹42.60 (0.01%)Rejected-AOC | ₹3.1 L+₹42.60 (0.01%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SRI HARI ENTERPRISES L2 | R MANICKAM L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the damaged Cement concrete as per the instruction of Departmental officers. Including all initial lead and other labour charges | 7 | M3 | 460.9 ₹3,226.3 | 460 ₹3,220 Lowest |
| 2.00 | Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including cost of all labour charges etc., complete as per standard specification 23 & 24 VI (S2) VII.9,10 | 7 | M3 | 78 ₹546 | 75 ₹525 Lowest |
| 3.00 | Centering with steel centering for revetment, drain and culvert Above 1.20m depth using MS sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 X 0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m length including cost of nails etc., Area. 10.80 sq.mtr | 15 | M2 | 314.6 ₹4,719 | 314 ₹4,710 Lowest |
| 4.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm hardbroken granite stone jelly for foundationincluding dewatering if found necessary andlaid in layers of not more than 15 cm thickand compacted etc.,complete complying witstandard specification. | 7 | M3 | 5,306.8 ₹37,147.6 Lowest | 5,306.8 ₹37,147.6 Lowest |
| 5.00 | Cement concrete 1:2:4 (one cement, two sand and four aggregate) using 20mm hardbroken granite stone jelly for foundationincluding dewatering if found necessary andlaid in layers of not more than 15 cm thickand compacted etc.,complete complying witstandard specification. | 39.99 | M3 | 6,662.5 ₹2,66,466.69 Lowest | 6,662.5 ₹2,66,466.69 Lowest |
| 6.00 | Conveying the excavated earth from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers. | 14 | M3 | 163.45 ₹2,288.3 | 163 ₹2,282 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
19 Mar 2025, 3:00 pmClosed
Assistant commissioner, westzone
westzone, coimbatore cororation
Providing Cement Concrete Pavements At Bajini kovil street in Ward No 35 of West zone.
2025_MAWS_531810_9
E7/WESTZONE/2025
Open Tender
Civil Works
Works
90 days
westzone, coimbatore cororation
As per the tender document attached
4 documents required · 4 mandatory
₹0
₹5,000
6 May 2026
12 Mar 2025
20 Mar 2025
12 Mar 2025
19 Mar 2025
12 Mar 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.94 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
BOQ_633038.xls
BOQ • 0.32 MB
Road.pdf
Tender Documents • 0.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .