| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-Finance V P O BARNOH TEHSIL DISTT UNA H P | UNA | HIMACHAL PRADESH | 174301 | ₹3.5 L | L1 | Accepted-Finance L1,L2 |
| 2 | L2₹3.6 LRejected-Finance GROUND FLOOR THAKUR COMPLEX BASANTPUR | BASANTPUR | SHIMLA | HIMACHAL PRADESH | 171018 | ₹3.6 L | L2 | Rejected-Finance L1,L2 |
| 3 | Rejected-Technical VILL TIHRA KHAS PO MANDALI TEH BANGANA DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | - | - | Rejected-Technical Non Responsive |
Tender Value
₹3.4 L
EMD Value
₹6,900
Closing Date
2 Jan 2026, 5:00 pmClosed
E.E. Bangana
Executive Engineer Bangana Division HPPWd Bangana
C/o Boundary Wall
2025_PWD_124448_1
11136-65 dated 20.12.2025
Open Tender
Civil Works - Buildings
60 days
Bangana
Please refer Tender documents.
13 documents required · 13 mandatory
₹350
₹6,900
2 Mar 2026
27 Dec 2025
3 Jan 2026
27 Dec 2025
2 Jan 2026
27 Dec 2025
Earth work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains in ordinary rock / all kind of soil (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, upto all leads and lifts, including getting out the excavated soil and disposal of surplus excavated soil as directed, within all lead and lifts and disposed earth to be levelled and neatly dressed as directed by Engineer-in-charge all leads and lifts including clearing of jungle.Pick Jumper work and than disposing of all surplus unserviceable excavated earth as directed by the Engineer-in-charge including carriage of material within all leads and lifts and other incidental. The rates are inclusive of octroi, royality, Malkana, toll tax, GST, Labour Cess or other taxes imposed by the Government.
Providing form work with steel plates 3.15mm (three point fifteen millimeter) thick welded with angle iron in frame 30×30×5mm (thirty into thirty into five millimeter) so as to give a fair finish including centring, shuttering, strutting and propping etcetera with wooden battens and ballies upto any height of propping and centring below supporting floor to ceiling upto any height and removal of the same for in-situ reinforced cement concrete and plain concrete work as per HPPWD specifications in foundations, footings, bases of columns, etc. for mass concrete as per the direction by the Engineer in charge including entire carriage of materials with in all leads and lifts and other incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, sale tax, goods service tax, labour cess or other taxes imposed by the Government.
Providing and laying cement concrete 1:4:8 ( One cement : four coarse sand : eight graded crushed stone aggregate 40mm (forty milimetre) nominal size)mechaniclly mixed and curing complete excluding cost of form work upto all work plinth level including carriage of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge and other incidental. The rates are inclusive of octroi, royality, Malkana, toll tax, GST , labour cess or other taxes imposed by the Government.
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 ( seven point five) in foundation and plinth in Cement mortar 1:6 (one cement : six coarse sand) including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of the Engineer-in-Charge and carriage of material within all leads and lifts and other incidentals.The rates are inclusive of octroi, royality, Malkana, toll tax, sale tax, good service tax or other taxes imposed by the Government.
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 (seven point five) in super structure above plinth level up to floor all level in cement mortar 1:4 ( one cement : four coarse sand) as per the direction of the Engineer-in-Charge and carriage of material within all leads and lifts and other incidentals.The rates are inclusive of octroi, royality, Malkana, toll tax, sale tax, good service tax or other taxes imposed by the Government.
15mm (fifteen millimetre) cement plaster in Cement mortar 1:6 (one cement : Six sand) single coat on the rough side of brick/concrete/stone walls for interior plastering upto all floor level including arrises, internal rounded angles, chamfers and/or rounded angles not exceeding 30cm (thirty centimetre) in girth and finished even and sand papered smooth including carriage of materials within all leads and lifts. including carriage of material within all leads and lifts and other incidental. The rates are inclusive of octroi, royality, Malkana, toll tax, GST or other taxes imposed by the Government.
Finishing walls with 100% Premium acrylic emulsion paint make of Nerolac, Berger(Bison Acrylic) Asian Paint (Tractor, Acrylic) Shalimar having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives.New work (Two or more coats applied @1.43 litre/ 10 sqm. complete upto all floor level Over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm. including entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government.
Steel work welded in built up sections/ framed work approved make i.e.TATA/JINDALSail, Tisco Shyam Steel, including cutting ,hoisting ,fixing in position and applying a priming coat of red lead paint in gratings framed guard bars, ladders, railling, brackets and similar works complete upto all heights all floor as per the direction by the Engineer in charge including entire carriage of materials with in all leads and lifts and other incidentials . The rates are inclusive octroi, royality, Malkana, toll tax, sale tax, goods service tax, labour cess or other taxes imposed by the Government.
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm (zero point ninety liter per ten square meter) over an under coat of primer applied @ 0.80 ltr/ 10 sqm (zero point eighty liter per ten square meter) of approved brand and manufacture ICI (Dulux Gloss) Nerolac, Berger (Luxol High Gloss) Asian Paints (Premium Apcolite Glosss) Shalimar upto all heights in all floor level as per the direction by the Engineer in charge including entire carriage of materials with in all leads and lifts and other incidentials . The rates are inclusive octroi, royality, Malkana, toll tax, sale tax, goods service tax, labour cess or other taxes imposed by the Government.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_182917.xls
BOQ • 0.29 MB
2.pdf
Tender Documents • 4.56 MB
Download all tender documents and submit your bid