Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.2 CrAccepted-AOC | ₹8.2 Cr | 1 | Accepted-AOC L1 M/s.TPC INFRA AND GREEN ENERGIES is Accepted |
| 2 | 2₹8.6 Cr+₹41.1 L (5.00%)Rejected-Finance | ₹8.6 Cr+₹41.1 L (5.00%) | 2 | Rejected-Finance L1 Lowest Tenderer can only be Accepted. L2 is Rejected |
Tender Value
₹8.2 Cr
EMD Value
₹4.2 L
Closing Date
7 Jul 2020, 3:00 pmClosed
Superintending Engineer H C and M
The Superintending Engineer Highways C and M 39 Chikkanna College Road Tirupur 641602
Widg and Impts Const of CD Works Const of Rtg Walls and Incl Up Keeping for a period of 60 months on Govt Roads in Tirupur North H C M Sub Dn Pkg No 38
2020_HWAY_166522_1
TN 03 20 21 HDO Dt 28.05.2020 Pkg 38 Tirupur Dn
Open Tender
Civil Works - Highways
Percentage
300 days
Tirupur
Refer PQ Documents Volume I
15 documents required · 15 mandatory
₹0
₹4.2 L
29 Oct 2020
5 Jun 2020
8 Jul 2020
5 Jun 2020
7 Jul 2020
13 Jun 2020
8 Jun 2020 - 11 Jun 2020
eProcurement System Government of Tamil Nadu Created By: Nagarajan GV Created Date/Time: 22-Jul-2020 11:19 AM Tender Title: TN 03 20 21 HDO Dt 28.05.2020 Pkg 38 Tirupur Division Tender ID: 2020_HWAY_166522_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Tirupur Circle
Name of Work:- Widening and Improvements, Construction of CD Works, Construction of Retaining Walls and including Up Keeping for a period of 60 months on Government Roads in Tirupur North (Highways), C&M, Sub Division. Package No.38 Road A :- Widening from Multi Lane to Four lane and Improvements of Salem - Cochin road (NH 47) (Abandoned stretches) Perumanallur town at km 104/770 - 105/4 including Widening the Pipe culvert at Km 104/8 .including upkeeping for a period of 60 months Road B :- Widening from Multi Lane to Four lane and Improvements of Salem - Cochin road (NH 47) (Abandoned stretches) Perumanallur town at km 105/4 - 106/0 including upkeeping for a period of 60 months Road C :- Widening from Multi Lane to Four lane and Improvements of Salem - Cochin road (NH 47) (Abandoned stretches) Perumanallur town at km 106/0 - 106/6 including upkeeping for a period of 60 months Road D :- Widening from Multi Lane to Four lane and Improvements of Salem - Cochin road (NH 47) (Abandoned stretches) Perumanallur town at km 106/6 - 107/0 including construction of Retaining wall at Km 106/10 including upkeeping for a period of 60 months Road E :- Widening from Multi Lane to Four lane and Improvements of Salem - Cochin road (NH 47) (Abandoned stretches) Perumanallur town at km 107/0 - 107/4 including construction of Retaining wall at Km 107/2 & 107/4 including upkeeping for a period of 60 months
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 SREE INFRATECH 73442555.030 5.000 86368445.000 Eight Crore Sixty Three Lakh Sixty Eight Thousand Four Hundred and Fourty Five
2.00 TPC INFRA AND GREEN ENERGIES 73442555.030 0.000 82255662.000 Eight Crore Twenty Two Lakh Fifty Five Thousand Six Hundred and Sixty Two
Lowest Amount Quoted BY: TPC INFRA AND GREEN ENERGIES(82255662.000)
BOQ Summary Details Tender Title: TN 03 20 21 HDO Dt 28.05.2020 Pkg 38 Tirupur Division Tender ID: 2020_HWAY_166522_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 TPC INFRA AND GREEN ENERGIES 82255662.000 L1
2 SREE INFRATECH 86368445.000 L2
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .