Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.4 CrAccepted-AOC SP 52 MPPGCL COLONY BIRSINGHPUR DISTT UMARIA 484 552 M P | BIRSINGHPUR | UMARIA | MADHYA PRADESH | 484552 | ₹1.4 Cr | L-1 | Accepted-AOC L1 |
| 2 | L-2₹1.6 Cr+₹18.9 L (13.3%)Rejected-AOC PLOT NO 41 SECTOR D BAGRODA INDUSTRIAL AREA BHOPAL MP 462026 | BHOPAL | MADHYA PRADESH | 462026 | ₹1.6 Cr+₹18.9 L (13.3%) | L-2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Disqualified |
| Sl No | Description | Qty | Unit | K K POWER CONSTRUCTION L1 | UNITED ENGINEERING L2 |
|---|---|---|---|---|---|
| 1.00SECTION-A | |||||
| 2.00CLEANING OF BOILER | |||||
| 3.00 | COMPLETE EXTERNAL CLEANING OF BOILER FROM TOP TO BOTTOM | 1 | JOB | 1,83,000 ₹2,15,940 Lowest | 1,97,500 ₹2,33,050 |
| 4.00 | INTERNAL CLEANING OF BOILER IN SECOND PASS | 1 | JOB | 48,000 ₹56,640 Lowest | 58,200 ₹68,676 |
| 5.00 | CLEANING OF ASH FROM ECONOMISER HOPPER WITH CONNECTING DUCTS | 1 | JOB | 48,000 ₹56,640 Lowest | 57,500 ₹67,850 |
| 6.00 | CLEANING OF PENT HOUSE, CAT HOUSE, DEAD CHAMBER | 1 | JOB | 2,55,000 ₹3,00,900 Lowest | 2,72,500 ₹3,21,550 |
| 7.00 | CLEANING OF PENT HOUSE ROOF | 1 | JOB | 25,500 ₹30,090 Lowest | 28,000 ₹33,040 |
| 8.00PREPARATION OF SCAFFOLDING | |||||
| 9.00 | PREPARATION OF SCAFFOLDING IN BOILER HORIZONTAL PASS (SCREEN TUBES, REHEATER, FINAL SUPER HEATER) | 1 | JOB | 48,000 ₹56,640 Lowest | 55,200 ₹65,136 |
| 10.00 | PREPARATION OF SCAFFOLDING ABOVE ECONOMISER HOPPER FOR INSPECTION OF ECONOMISER LOWER BANK COILS & C-HEADER. | 1 | JOB | 39,000 ₹46,020 Lowest | 46,500 ₹54,870 |
Tender Value
₹1.4 Cr
EMD Value
₹2 L
Closing Date
29 Apr 2022, 3:00 pmClosed
CE (Gen) ATPS
O/o SE (PnW) ATPS
Work contract for capital overhaul of pressure parts(COH) at 210 MW ATPS MPPGCL Chachai.
2022_MPPGC_192448_1
PP52
Open Tender
Miscellaneous Works
Item Rate
45 days
ATPS Chachai
As per NIT
20 documents required · 20 mandatory
₹5,000
Yes
₹2 L
Yes
17 Jul 2026
25 Mar 2022
2 May 2022
25 Mar 2022
29 Apr 2022
25 Mar 2022
SECTION-A
CLEANING OF BOILER
COMPLETE EXTERNAL CLEANING OF BOILER FROM TOP TO BOTTOM
INTERNAL CLEANING OF BOILER IN SECOND PASS
CLEANING OF ASH FROM ECONOMISER HOPPER WITH CONNECTING DUCTS
CLEANING OF PENT HOUSE, CAT HOUSE, DEAD CHAMBER
CLEANING OF PENT HOUSE ROOF
PREPARATION OF SCAFFOLDING
PREPARATION OF SCAFFOLDING IN BOILER HORIZONTAL PASS (SCREEN TUBES, REHEATER, FINAL SUPER HEATER)
PREPARATION OF SCAFFOLDING ABOVE ECONOMISER HOPPER FOR INSPECTION OF ECONOMISER LOWER BANK COILS & C-HEADER.
PREPARATION OF QUICK ERECT SCAFFOLDING SYSTEM (CUP-LOCK SYSTEM) IN BOILER FURNACE (FROM TOP TO BOTTOM)
PREPARATION OF SCAFFOLDING IN WIND BOX
PREPARATION OF SCAFFOLDING IN BOTTOM ASH HOPPER
INSPECTION
INSPECTION OF COMPLETE BOILER PRESSURE PARTS (IST & IIND PASS)
INSPECTION & REPAIR OF ALL DOORS ,WINDOWS AND PEEP HOLES IN BOILER
INTERNAL INSPECTION & CLEANING OF BOILER DRUM
CLEANING AND REPAIR OF WIND BOX
WITH STEEL
WITHOUT STEEL
DYE PENETRATION TEST (DP TEST) WITH KIT
TRANSPORTATION OF ASH, SCRAPS, DEBRIES AND OTHER WASTE MATERIALS ( INCLUDING LOADING/UNLOADING)
HYDRO JET CLEANING OF COMPLETE BOILER PRESSURE PARTS
PLATEN SUPERHEATER COILS.
RE-HEATER COILS.
WATER WALL ( FRONT, REAR, LEFT & RIGHT)
SECTION-B
ASSISTANCE IN RADIOGRAPHY
RECTIFICATION, REPLACEMENT AND REFIXING OF PROTECTION SLEEVE (SHIELDING) IN VARIOUS AREAS OF BOILER TUBES.
RECTIFICATION, REPLACEMENT AND REFIXING OF CASSETTE BAFFLES IN VARIOUS AREAS OF BOILER TUBES.
PREPARATION OF BOILER TUBE SURFACE FOR TUBE THICKNESS SURVEY/ OXIDE SCALE MEASUREMENT/ STRESS RELIEVING
WELDING OF HP JOINTS OF BOILER TUBES
WATER WALL TUBES-SCREEN TUBES, HANGER TUBES, REAR ARCH TUBES ETC.
PLATEN SUPERHEATER TUBES
LTSH TUBES AND ASSOCIATED STEAM COOLED WALL
FINAL SUPERHEATER TUBES
ROOF TUBES
REHEATER
ECONOMISER TUBES
INSTRUMENT PIPINGS
WELDING OF FINS
RE-ENFORCEMENT OF WELDED JOINTS (a) ECONOMISER (b) SLING ( c) REHEATER (D) DRUMVENT ( E) LTSH
WELDING & REPLACEMENT OF DRAIN JOINTS
WELDING & REPLACEMENT OF TRACING LINE / SAMPLING LINE
PAD WELDING OF ERODED TUBES OF VARIOUS SIZE
PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS ( SIZE 50MM X 50MM)
ALIGNMENT OF COILS/ TUBES / BLOWERS
ALIGNMENT OF WALLBLOWERS/SERVICING OF WALL BLOWERS
ALIGNMENT /SERVICING OF LONG RETRACTABLE SOOT BLOWER
ASSISTANCE IN HYDRAULIC TEST OF BOILER PRESSURE PART & PREPARATION FOR BOILER LIGHT UP
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GR.A+GR.C)
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GRADE A) 1.REAR ARCH 2. SOOT BOLWER AREA 3. OTHER LOCATIONS 4. BURNER MOUTH
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GRADE C) (1). PENT HOUSE, DOOR, WINDOW MANHOLE & PEEPHOLE, ETC (2)DEAD CHAMBER & SCREEN VALVE (3) FLUE GAS EROSION PLATE OF LTSH & ECO BEND (4) COOLING PIPE OF SEAL PLATE (5) OTHER AREAS (LIKE HOPPER HEADER ETC.)
SECTION-C
COMPLETE SERVICING/OVERHAULING OF HP VALVES
GLAND PACKING OF HP VALVES
UPTO 25 MM
25 MM TO 50 MM
50MM TO 100 MM
100 MM TO 200 MM
ABOVE 200 MM
COMPLETE SERVICING OF VALVES (EXCLUDING ACTUATOR):
UPTO 25 MM
25 MM TO 50 MM
50 MM TO 100 MM
ABOVE 200 MM
REPLACEMENT OF VALVES (WELDED TYPE)
UPTO 25 MM
25 MM TO 50 MM
50 MM TO 100 MM
100 MM TO 200 MM
SERVICING OF BOILER FILL PUMP
SECTION-D
COMPLETE SERVICING OF SPRING LOADED SAFETY VALVES (SV)
BOILER DRUM SV
MAIN STEAM LINES SV
CRH LINES SV
HRH LINES SV
SERVICING OF SOOT BLOWER SAFETY VALVE
SECTION-E
PREPARATION / FABRICATION OF HP TUBE BENDS
REPAIR OF PENT HOUSE OF BOILER
REPAIR OF PENT HOUSE BY PATCHING (WITHOUT STEEL)
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)
REPAIRING OF DEAD CHAMBER
REPAIR OF DEAD CHAMBER BY PATCHING
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES
REPAIR & SERVICING
BUCKSTAYS
REPALCEMENT/ REPAIRING OF ECONOMISER MODULE (CONSIST OF 2 COILS BOTH LOWER & UPPER BANK)
PAINTING OF TAKEN OUT ECONOMISER COILS
REPAIRING OF CAT HOUSE
WITH STEEL
WITHOUT STEEL
SERVICING, CLEANING & REPAIRING OF SAMPLING LINE COOLERS
SERVICING & REPAIRING OF HANGERS & SUPPORTS
SECTION-F
FIXING OF CORRUGATED GI SHEET AT BOILER ROOF & OTHER PLACES
PAINTING OF BOILER BASE STRUCTURE
DISPOSAL OF RUBBISH THERMAL INSULATION
REPAIRING OF HEADER STUBS HAND HOLE PLUGS
Insulation Work
REMOVAL / APPLICATION OF THERMAL INSULATION IN COMPLETE BOILER FROM BOTTOM ASH HOPPER TO PENT HOUSE
REMOVAL / APPLICATION OF THERMAL INSULATION IN STEAM AND WATER PIPING
REMOVAL /APPLICATION OF THERMAL INSULATION IN ESP
REMOVAL / APPLICATION OF THERMAL INSULATION INAIR HEATER & HOPPER
FLUE GAS & HOT AIR DUCT
SHEETING WORK OVER INSULATION (WHERE INSULATION IS IN GOOD CONDITION)
UNITED ENGINEERING
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .