Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.2 LAdmitted-Finance | +0.00% | ₹13.2 L | L1 | Admitted-Finance |
| 2 | L2₹13.3 LAdmitted-Finance | +1.00% | ₹13.3 L | L2 | Admitted-Finance |
| 3 | L3₹13.4 LAdmitted-Finance | +2.00% | ₹13.4 L | L3 | Admitted-Finance |
Updated dates
Tender Value
Refer Docs
Closing Date
5 May 2026, 1:00 pmClosed
Sarpanch Gramsevak Grampanchayat Washimbe
Grampanchayat Washimbe Tal Karmala Dist Solapur 413206
A) Construction of Road From Railway pul to Bhairavanath Mandirr B) Grampanchayat Sushobhikaran
2026_SOLAP_1298769_1
E-Tender/2026-27/01
Open Tender
Civil Works
180 days
washimbe
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Exempted
12 May 2026
28 Apr 2026
6 May 2026
28 Apr 2026
5 May 2026
28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Labour charges for removing grass, thorney shrubs, Jungli shrub, Kubabul and alike grass along roadside making the ground clean by showel and phavaras etc. complete. A) Construction of Road At Washimbe From Railway pul to Bhairavanath Mandir Tal Karmala Dist Solapur | 444 | Square meter | 7 | ₹3,108 | BI01010001010000000000000515BI0100001112 |
| 2 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting ?with Intelligent Compactor with compaction analyzer and V-Sat attachment.to the required density. Grading I (Using Screening Type B (11.2 mm) Aggregate) A) Construction of Road At Washimbe From Railway pul to Bhairavanath Mandir Tal Karmala Dist Solapur | 183.15 | Cubic meter | 2,808.9 | ₹5,14,450.04 | BI01010001010000000000000515BI0100001113 |
| 3 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete.A) Construction of Road At Washimbe From Railway pul to Bhairavanath Mandir Tal Karmala Dist Solapur | 188.7 | Cubic meter | 638.3 | ₹1,20,447.21 | BI01010001010000000000000515BI0100001114 |
| 4 | Spreading hard murum for side width etc. complete A) Construction of Road At Washimbe From Railway pul to Bhairavanath Mandir Tal Karmala Dist Solapur | 188.7 | Cubic meter | 79 | ₹14,907.3 | BI01010001010000000000000515BI0100001115 |
| 5 | Compacting the hard murum side widths including laying in layers on each side with power roller including artificial watering etc. complete. A) Construction of Road At Washimbe From Railway pul to Bhairavanath Mandir Tal Karmala Dist Solapur | 444 | Square meter | 21 | ₹9,324 | BI01010001010000000000000515BI0100001116 |
| 6 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge A) Construction of Road At Washimbe From Railway pul to Bhairavanath Mandir Tal Karmala Dist Solapur | 1 | Number | 2,610 | ₹2,610 | BI01010001010000000000000515BI0100001117 |
| 7 | Quality Control Charges A) Construction of Road At Washimbe From Railway pul to Bhairavanath Mandir Tal Karmala Dist Solapur | 1 | Test | 2,700 | ₹2,700 | BI01010001010000000000000515BI0100001118 |
| 8 | Royalty Charges of Hard Murum A) Construction of Road At Washimbe From Railway pul to Bhairavanath Mandir Tal Karmala Dist Solapur | 188.7 | Cubic meter | 216.18 | ₹40,793.17 | BI01010001010000000000000515BI0100001119 |
| 9 | Add G S T 18 % Charges A) Construction of Road At Washimbe From Railway pul to Bhairavanath Mandir Tal Karmala Dist Solapur | 1 | JOb | 1,19,672.38 | ₹1,19,672.38 | BI01010001010000000000000515BI0100001120 |
| 10 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means B) Grampanchayat Sushobhikaran At Washimbe Tal Karmala Dist Solapur | 1.31 | Cubic meter | 207 | ₹271.17 | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_2230561.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid