| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC | L1 | Accepted-AOC FD Submitted | |
| 2 | L2₹6.7 L+₹79,943.55 (13.4%)Rejected-Finance | L2 | Rejected-Finance 2nd lowest | |
| 3 | Rejected-Technical GRAM SHAHAJHPUR NINAIYAN TEHSIL AKBARPUR KANPUR DEHAT 209115 | KANPUR DEHAT | UTTAR PRADESH | 209115 | - | Rejected-Technical Required Document not full fill | |
| 4 | Rejected-Technical 233 ANAND NAGAR RATAPUR KANPUR UTTAR PRADESH | KANPUR | KANPUR | UTTAR PRADESH | - | Rejected-Technical Required Document not full fill |
| Sl No | Description | Qty | Unit | M/S SURAJ PRASAD DWEVEDI AND SONS L1 | M/S SUDHIR CHANDRA CONSTRUCTION AND SUPPLIER L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in dry ordinary soil (Loam, clay or sand) including lift upto 1.50 m. and lead upto 30 m. and including filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation
trenches or into the plinth with removal and disposalof surplus earth as directed by the Engineer - in -charge upto a distance of 30 m. from the foundation trenches. | 47.76 | M³ | 81.36 ₹3,885.75 Lowest | 120 ₹5,731.2 |
| 2.00 | Laying of Cement Concrete 1:3:6 in foundation with cement, c.sand & 10 to 20 mm Stone Grit including all labour and T&P etc complete. | 15.97 | M³ | 5,040.4 ₹80,495.19 | 4,500 ₹71,865 Lowest |
| 3.00 | Ist Class 150 Brick Work 1:4 With Cement & C-Sand including all labour material and t&p | 65.58 | M³ | 5,035.35 ₹3,30,218.25 | 4,500 ₹2,95,110 Lowest |
| 4.00 | S/L Local sand including cast of all labour metarial and T&P etc. | 0.77 | M³ | 1,184.87 ₹912.35 Lowest | 4,500 ₹3,465 |
| 5.00 | Centering and shuttering for R.C.C. work for bridge slab up to 3 met span including cost of labour material and T&P etc. required for completion of the work. | 34.17 | M² | 750.32 ₹25,638.43 Lowest | 2,000 ₹68,340 |
| 6.00 | Steel Reinforcement per MT. | 0.81 | MT | 81,400 ₹65,934 | 6,000 ₹4,860 Lowest |
| 7.00 | Reinforced cement concrete (R.C.C.)1:1.5:3 with cement, c.sand & 10 to 20 mm Stone Grit | 8.07 | M³ | 7,189.18 ₹58,016.68 | 6,000 ₹48,420 Lowest |
| 8.00 | Cement pointing 1:2 (stuck deep) on brick masonary including all material labour and t&p | 68.77 | M² | 213.71 ₹14,696.84 | 101 ₹6,945.77 Lowest |
| 9.00 | Finishing walls with water proofing cement paint of approved manufacturers of required shade on uncoated wall over one coat white cement primer including curing and cost of material in two coats complete. As per I.D. S.O.R ch-12 item 15(i) | 31.54 | M² | 57.86 ₹1,824.9 Lowest | 3,100 ₹97,774 |
| 10.00 | Supplying and fixing of R.C.C wheelgaurd incld all cost of material labour and t&p etc. | 4 | Nos | 1,188.85 ₹4,755.4 | 600 ₹2,400 Lowest |
Tender Value
₹8.2 L
EMD Value
₹82,000
Closing Date
8 Jul 2025, 11:00 amClosed
Executive Engineer
Office of the Executive Engineer Irrigation Division Kanpur Dehat
Reconstruction V.R.B. of Syphon at 88.750
2025_UPIDC_1053566_2
02/EE/2025-26
Open Tender
Civil Works
Item Rate
90 days
Irrigation Division Kanpur Dehat
as per tender condition
2 documents required · 2 mandatory
₹856
₹82,000
8 Dec 2025
3 Jul 2025
8 Jul 2025
3 Jul 2025
8 Jul 2025
3 Jul 2025
Amount
Earth work in foundation in dry ordinary soil (Loam, clay or sand) including lift upto 1.50 m. and lead upto 30 m. and including filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposalof surplus earth as directed by the Engineer - in -charge upto a distance of 30 m. from the foundation trenches.
Laying of Cement Concrete 1:3:6 in foundation with cement, c.sand & 10 to 20 mm Stone Grit including all labour and T&P etc complete.
Ist Class 150 Brick Work 1:4 With Cement & C-Sand including all labour material and t&p
S/L Local sand including cast of all labour metarial and T&P etc.
Centering and shuttering for R.C.C. work for bridge slab up to 3 met span including cost of labour material and T&P etc. required for completion of the work.
Steel Reinforcement per MT.
Reinforced cement concrete (R.C.C.)1:1.5:3 with cement, c.sand & 10 to 20 mm Stone Grit
Cement pointing 1:2 (stuck deep) on brick masonary including all material labour and t&p
Finishing walls with water proofing cement paint of approved manufacturers of required shade on uncoated wall over one coat white cement primer including curing and cost of material in two coats complete. As per I.D. S.O.R ch-12 item 15(i)
Supplying and fixing of R.C.C wheelgaurd incld all cost of material labour and t&p etc.
S/F of sign board at site in 90X60 cm. size of mild steel or iron in plain work to req. shape of angle 40X40X6 mm and 2.50 mm thick plate as necessary for welding and bending incld. Painting and writing in both sides with supply of steel and its wastage as req. for completion of work.
Providing and laying of weephole in brick massonary in abutment and wing wall with 110mm dia PVC pipe extending through the full width of the structuer with slope of 1v:20 H towarddrawing force complete as per drawing and technical specification Clause 614, 709, 1204.3.7 fix as per standard (sl no 730)(As per PWD SOR)
M/S SUDHIR CHANDRA CONSTRUCTION AND SUPPLIER (BID ID -5297102)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .