Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-Finance GROUND FLOOR THAKUR COMPLEX BASANTPUR | BASANTPUR | SHIMLA | HIMACHAL PRADESH | 171018 | L1 | Accepted-Finance Accept | |
| 2 | L2₹3.8 L+₹38,570 (11.2%)Rejected-Finance HOUSE NO 114 WARD NO 1 KRISHNA NAGAR TEH AND DISTT HAMIRPUR H P | L2 | Rejected-Finance Reject | |
| 3 | L3₹4.1 L+₹71,050 (20.7%)Rejected-Finance | L3 | Rejected-Finance Reject | |
| 4 | L4₹4.3 L+₹83,148 (24.2%)Rejected-Finance | L4 | Rejected-Finance Reject |
Tender Value
₹4.1 L
EMD Value
₹8,500
Closing Date
20 Jun 2026, 5:00 pmClosed
Executive Engineer
Executive Engineer
RR damages on link road Patta Km 000 to 1100 SH PL CC pavement at RD 100 to 1100
2026_PWD_136625_6
3039-79 dated 10-06-2026
Open Tender
Civil Works - Roads
Percentage
Bhoranj
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
₹8,500
10 Jul 2026
15 Jun 2026
22 Jun 2026
15 Jun 2026
20 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing concrete for plain/ reinforced concrete in P.C.C. grade M-10(M- ten )nominal mix 1:3:6 ( one cement : three sand : six graded crushed stone aggregate) 40mm(forty millimeters) nominal size in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 as per the direction of the Engineer-in-charge including entire carrriage of material within all leads and lfts and other incidentals The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government. | 35 | Per cubic metre | 5,200 | ₹1,82,000 |
| 2 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size)as per directon of Engineer-in-Charge including entire carrriage of material within all leads and lfts and other incidentals . The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government. | 35 | Per Cubic Meter | 6,400 | ₹2,24,000 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.70 MB
SBD6.pdf
Tender Documents • 5.05 MB
BOQ_202220.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .