| 1 | L1₹20.1 LAccepted-AOC 1ST SHAKUNTALA SADAN 04 RAMPURA BASTI LALGARH BIKANER RAJASTHAN 334001 | BIKANER | RAJASTHAN | 334001 | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹23.3 L+₹2.6 L (12.5%)Rejected-Finance | L2 | Rejected-Finance not lowest bidder | |
| 3 | L3₹23.3 L+₹2.6 L (12.6%)Rejected-Finance SHIV BARI ROAD NEAR KASUMAL HOTEL BIKANER 334003 RAJASTHAN | BIKANER | BIKANER | RAJASTHAN | 334003 | L3 | Rejected-Finance not lowest bidder | |
| 4 | L4₹25.1 L+₹4.4 L (21.2%)Rejected-Finance 580 INDRA COLONY JAISALMER RAJASTHAN 345001 | JAISALMER | JAISALMER | RAJASTHAN | 345001 | L4 | Rejected-Finance not lowest bidder |
| Sl No | Description | Qty | Unit | M/s Rohit Construction Co. L3 | HINGLAZ ENTERPRISES L4 | J.D INFRA ENGINEERING L1 | DASHMESH ENTERPRISES L2 |
|---|---|---|---|---|---|---|---|
| 1.01 | Annual comprensive maintenance of a filtration plant comprising the following equipments complete all as specified and directed.
(a) Raw water Jack well -01 No
(b) Low lift pump sets 7.5 HP x3 and control panels -01 set
(c) Receiving Chamber -01 No
(d) Flash mixer chamber including motor, control panel - 01No
(e) Clari flocculator tank complete with motor and control panel -01 No
(f) Sand and gravel filter bed - 03 Nos
(g) Alum dosing & soda mixing chamber , pump set etc - 01 each
(h) Sludge deposit well & pump set - 01 Each
(i) Air compressor and connected items - 01 Set
(j) Connected pipe line and sluice valves and accessories - 01 set
NOTE :-
(i)Rate quoted by the contractor shall be deemed to included the following
(ii) Grease and lubricating oil shall be provided by the contractor.
(A) Weekly maintenance
(i) Contractor shall provide a trained technician and a helper, who will visit filtration plant once a week, to check and repair / servicing of the eqpts above mentioned including back washing of sand bed to ensure the serviceability and proper functioning of filtration plant.
(ii) Cleaning all filtration plant building inside, plant room,eqpts including surrounding area minimum for five meter all around of bldgs, chamber, jack well.
(B) Monthly maintenance
(i) Check and ensure serviceability of all centrifugal pump set connected to the filtration plant and made functional to ensure its proper functioning, and carry out greasing. | 6 | Per Month | 20,000 ₹1,20,000 | 20,000 ₹1,20,000 | 18,000 ₹1,08,000 | 17,000 ₹1,02,000 Lowest |
| 1.02(ii) Check and ensure serviceability of the Alum dosing chamber ,cleanliness of the chamber and top-up of oil in gear box , greasing in existing motor. (iii) Check and ensure proper functioning of clari-flocculator tank , agitator fan with bushes , agitator gear box and motor and its relevant items , top-up of oil and grease, checking the control panel for its smooth functioning and its breeze movement . (iv) Check and ensure the functioning of flash mixer , and necessary top-uping of oil and grease in gear box and motor including control panels . (v) Carrying out necessary cleanness of the filter media . NOTE:-(i) Replacement of MCCBs, power contactor shall be measured and paid separately under the relevant items of this schedule. (ii) Rewinding of motor and repair of pump set shall be measured and paid separately if required. (iii) minor parts such as nut, bolt & washer, welding works, cleaning materials, wiring of control panels, fuse / MCB's,star couple, bearing, pump shaft bush, including consumable items like gland packing, greasing etc other than Alum & Soda shall be provided by the contractor at his own end and nothing extra shall be paid to the contractor on this account. | |||||||
| 1.03(iv)Periodical maintenance ie weekly and monthly shall be done in presence of JE (E/M), Also as and when the periodical maintenance will be commenced, contractor shall inform to AGE (E/M) and JE (E/M) one day before, so that necessary check and balance for supervision of work can be exercised by the executives. (v) In case any periodical maintenance is not carried out contractor in this case, he is liable to pay penalty as given below:- (a) For non providing weekly maintenance -one fourth of quoted rate. (b) For non providing monthly maintenance - Three Fourth of quoted rate and item will not be measured for payment. (vi) On the particular month, when the quarterly maintenance is due as stipulated with item No. 2 here in after, no payment for monthly maintenance to be done and only weekly maintenance shall be carried out. Hence this aspect shall be kept in mind while quoting rates by the contractor. | |||||||
| 2.01 | Material and labour for Quarterly maintenance of a filtration plant complete all as specified and directed.
Note:- The Following activites for maintenance of Filteration plant are to be carried out :-
(i) Draining of complete water from raw water jack well, cleaning manually by wire brushes , taking out mud , algae and other dust particles, re-cleaning with bleaching and lime mixed with water and drying, checking of all valves and accessories complete all as specified and as directed by Engineer-in-charge.
(ii) Draining of complete water from the clari-flocculator of size 5 m dia and 2.5 m deep(Approx) , cleaning manually by wire brushes , taking out mud , algae and other dust particles, re-cleaning with bleaching and lime mixed with water , cleaning off all flocculating motor shaft and blades complete all as specified and as directed by Engineer-in-charge.
(iii) Draining of complete water from the raw water receiving chamber and flash mixer chamber, then cleaning manually by wire brushes , taking out mud , algae and other dust particles, re-cleaning with bleaching and lime mixed with water , complete all as specified and directed by Engineer-in-charge.
(iv) Cleaning the dosing chamber after taking out stainless steel-grill manually with wire brushes ,taking out dirt particles then cleaning with bleaching and lime mixed with water and refixing the grill complete all as specified and as directed by Engineer-in-charge .
(iv) Cleaning of sludge disposal chamber by removing and spreding sludge 100 mtr away from the site as indicated and directed, cleaning connected under water pipes cleaning submersible pump and foot valve complete all as specified and directed by Engineer-in-charge. | 3 | Per Three month | 25,000 ₹75,000 | 20,000 ₹60,000 | 15,000 ₹45,000 Lowest | 18,000 ₹54,000 |
| 2.02NOTE:- (i) Filtration plant consists of the certain equipments/accessories as mentioned in through indicated in item No. 1 here in before, accordingly unit rate of this item includes the maintenance of composite filtration plant. (ii) Replacement of control valves, pipe line, NRV shall be measured and paid separately under the relevant items of schedule. (iii) Rate is inclusive for providing bleaching powder, lime with water for cleaning purpose. (iv) Before under taking the above maintenance, contractor shall arrange the sufficient man power and T&P required for Job well in time. (v) Date of quarterly maintenance shall be fixed by AGE (E/M), 5 days in advance and entire quarterly maintenance of particular period of filtration plant shall be completed within two days to the satisfaction of Engineer-in-charge, in case work is not completed with in two days a penalty sum of Rs. 10,000/- per day basis for delay period shall be charged from the contractor. Record of the same will be maintained by JE/Engineer-charge. | |||||||
| 3.00 | M & L for Cleaning of filter beds 60000 ltr per hour by removing of accumulated sand/dust particles and unserviceable filter media from bottom of the filter beds and removing sludge/ wastage to 3 kms away from the defence land and refilling filter media back in to bed after thorough cleaning, however additional gravels required, shall be measured and paid for separately as supply only complete all as specified and directed.
Note :
(i) Beds shall be cleaned manually to avoid any damage in the bed/ structure / piping system.
(ii) Unit rate of this item includes the cost of removal including loading and un-loading in vehicle of existing filter media/ gravel through suitable transportation. Vehicle shall be provided by the contractor at his own end and cost .Filter media required for replacement if any shall be measured and paid separately.
(iii) Before under taking the above maintenance, contractor shall arrange the sufficient man power and T&P required for Job well in time. | 3 | Each Job | 20,000 ₹60,000 | 25,000 ₹75,000 | 20,000 ₹60,000 | 17,000 ₹51,000 Lowest |
| 4.00 | Supply only natural gravels of size 20-25mm complete all as specified and directed. | 15 | Cum | 3,500 ₹52,500 | 3,200 ₹48,000 Lowest | 3,200 ₹48,000 Lowest | 4,000 ₹60,000 |
| 5.00 | Supply only natural gravels of size 15-20mm complete all as specified and directed. | 12 | Cum | 3,000 ₹36,000 | 3,000 ₹36,000 | 2,950 ₹35,400 Lowest | 4,000 ₹48,000 |
| 6.00 | Supply only natural gravels of size 6-10mm complete all as specified and directed. | 10 | Cum | 2,500 ₹25,000 | 2,500 ₹25,000 | 2,000 ₹20,000 Lowest | 4,000 ₹40,000 |
| 7.00 | Taking down flash mixer motor of 2 HP, 3 Phase, 440 V by disconnecting from steel shaft & reduction gear arrangement and including repairing the motor by replacing the burnt winding, repairing the vertical down 3 inch centre 30/1 ratio gear box suitable for 2 Hp motor and re-fixing the same after changing suitable bushes, greasing, oiling changing its complete agitator frame , running and testing complete all as specified and directed. | 1 | Each Job | 7,500 ₹7,500 | 8,000 ₹8,000 | 8,000 ₹8,000 | 4,000 ₹4,000 Lowest |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
14 Jul 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE AF NAL
GE AF NAL
AS DESCRIBED IN BILL OF QUANTITIES
2025_MES_715121_1
GE (AF) NAL /T-19/2025-26
Open Tender
Water Equipments/ Meter/ Drilling/ Boring
Item Rate
273 days
GE AF NAL
AS PER NIT AND TENDER DOCUMENTS CATEGORY A(ii)CLASS E AND ABOVE
8 documents required · 8 mandatory
₹500
GE AF NAL
₹50,000
Yes
6 Aug 2025
17 Jun 2025
16 Jul 2025
17 Jun 2025
14 Jul 2025
1 Jul 2025
17 Jun 2025 - 26 Jun 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .