Tender Value
₹8.1 L
EMD Value
₹8,090
Closing Date
10 May 2023, 3:00 pmClosed
Block Development Officer (V.Pt)
Block Development Office (V.Pt) Arni
Construction Of Kitchen Shed at PUM school in Poosimalaikuppam Panchayat at Arni Block under AGAMT scheme 2023-24
2023_RDTN_309267_1
Roc.No. A13-1/1825/2023 Date.18/04/2023 ARNI22
Open Tender
Civil Works - Buildings
Item Rate
90 days
Arni
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,090
23 May 2023
2 May 2023
10 May 2023
2 May 2023
10 May 2023
2 May 2023
Amount
Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification.
Supplying and filling in foundations and basement with filling gritty gravel in layers not exceeding 15 cm.thick,well watered,rammed and consolidated etc. complete complying with standard specifications.
Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
Brick work in following Cement Mortar 1:5 using best quality II class table moulded bricks 8"3/4 x 41/4" X23/4" for foundation and basement including curing etc.,complete complying with standard specification.including scaffolding curing cost of reinforcement etc.all complete as per specifications and drawings as directed by the Engineer in-charge.
Steel - Fe 500 D: Supply, fabrication and placing of reinforcement steel of high yield strength ribbed bars of various diameters and grade conforming to IS 1786 for reinforced concrete work. The work includes recoiling, straightening, cutting, bending, fabricating, and placing in position, at all levels including lead and lift, according to drawings, specifications etc. complete and supply & use of 18G black annealed binding wire double fold to tie the bars in position and providing precast cement/ PVC cover blocks for main reinforcement to ensure specified cover and complete., including all labor charges etc as directed by departmental officers.
Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid).
Below Ground level
Above Ground level
Rainforcement Cement Concrete 1:1.5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof s
Plastering with CM 1:5, 12mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Ceiling Plastering with cement mortar 1:3 mix to 10 mm thick for R.C.C. Items including cost and conveyance of all materials to site and all labour charges etc complete
Paving the Floor with scratch proof ceramic tiles of size 305x305x6mm including cost and conveyance
Weathering course with best quality broken brick jelly of size 20 mm uniform gauge in pure slaked lime (no sand to be listed ) over the RCC roff slab in the proposition being brick jelly to lime 32:12:1/2 by volume and laid over in to a single layer and c
Terrace flooring with one course of pressed tiles size of 23 x 23 x 2cm using CM1:3 mixed with crude oil 10% by weight of cement and pointed with cement mortor 1:3 etc., complete
Distembering 2 coats using Oil Buond Distember including cost and conveyanceand all labour charges ctc. Complete
Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
Painting TWO coats of new iron works such as steel doors, windows,ventilators, window bars, balustrades etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats, etc., complete complying with stan
Cuddappa slab
Window
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
BALAJI P
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .