Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 CrAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.2 Cr+₹21.0 L (3.00%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹7.4 Cr+₹35.0 L (5.00%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹7.0 Cr
EMD Value
₹3.6 L
Closing Date
22 Dec 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, NH,Madurai
O/o Superintending Engineer, National Highways, No.5, Besant Road, ChinnaChokkikulam Madurai 02
Strengthening at km 2/8 - 10/660 and construction of retaining wall at km 10/2 of Aruppukottai - Kurundhamadam road (ODR). (Job.No.TN-CRIF-2025-26-MDU-28)
2025_MoRTH_888049_1
TN No 17/2025-26/HDO/NH/Dt.02.12.25
Open Tender
Civil Works - Roads
Percentage
180 days
Aruppukottai
As per Tender documents
5 documents required · 5 mandatory
₹17,700
Divisional Engineer NH Madurai
₹3.6 L
O/o Superintending Engineer, NH,Madurai
14 Feb 2026
3 Dec 2025
23 Dec 2025
3 Dec 2025
22 Dec 2025
3 Dec 2025
12 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing Light jungle with uprooting including all other incidental charges etc., as per MORTH standadrd specifications | 6,864 | sqm | 6.89 | ₹47,292.96 |
| 2 | Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and depositing the debris excluding cost of materials including all labour charges. | 8,676.27 | sqm | 23.36 | ₹2,02,677.67 |
| 3 | Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 150mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5. | 3,904.32 | cum | 2,568.77 | ₹1,00,29,300.09 |
| 4 | Prime coat - Providing and laying Prime Coat over WBM / WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals formachinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5. | 26,028.8 | sqm | 86.5 | ₹22,51,491.2 |
| 5 | Tack Coat - Providing and laying Tack Coat over WBM / WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5. | 26,028.8 | sqm | 19.96 | ₹5,19,534.85 |
| 6 | Tack Coat - Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5. | 25,105.78 | sqm | 28.81 | ₹7,23,297.52 |
| 7 | Bituminous Macadam - Providing, laying 50 mm consolidated thick Bituminous Macadam using 0.20 cum of 26.50 - 13.20 mm, 0.43 cum of 13.20 - 2.36 mm and 0.08 cum of 2.36 mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing the minimum required temperature using Central hot mix plant 20 - 30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20 - 30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5. | 2,563.06 | cum | 9,218.82 | ₹2,36,28,388.79 |
| 8 | Bituminous Concrete - Providing and laying Bituminous Concrete to 30/40 mm thick using 0.13 cum of 19.00 - 9.50 mm, 0.17 cum of 9.50 - 2.36 mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMPsite, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20 - 30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical paver to the specified grades and cross sections and consolidated by 8 - 10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20 - 30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. | 1,534.06 | cum | 11,649.18 | ₹1,78,70,541.07 |
| 9 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottomof excavation backfilling, clearing up the site and disposal of all surplus materials etc.,complete as per standard specification. For making up of low berms with conveyance | 2,095.8 | cum | 208.52 | ₹4,37,016.22 |
| 10 | PCC Retaining wall at Km 10/2
Earthwork excavation in all classes of soils except hard rock requring blasting depositing on bank with all leads and lifts as per SS 20B including cost of all labour,materials, tools, equipments and all incidential charges such as bailing out water providing and maintaining necessary conferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and cleaning the site and disposal of all surplus materials etc complete as per relevant standard specifiation for Founadation of PCC Reataining wall. | 37.13 | cum | 414 | ₹15,371.82 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
DOC172.rar
Tender Documents • 1.85 MB
BOQ_933409.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .