Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.6 CrAccepted-AOC PANCHAK TENT KARWA SHRI SABHA MALLAN GARIR MAHARIYA JILA ROAD | BHIND | BHIND | MADHYA PRADESH | ₹24.6 Cr | L1 | Accepted-AOC sanjay sharma L1 |
| 2 | L2₹26.2 CrRejected-Finance | ₹26.2 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹26.9 CrRejected-Finance | ₹26.9 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹27.0 CrRejected-Finance | ₹27.0 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹28.3 CrRejected-Finance | ₹28.3 Cr | L5 | Rejected-Finance L5 |
Tender Value
Refer Docs
EMD Value
₹15.4 L
Closing Date
5 Apr 2021, 2:00 pmClosed
Chief Engineer
Chief Engineer Indira Sagar Project (Canals) Sanawad Distt.Khargone
GHAT and ALLIED WORKS DISTRICT SEHORE, GROUP-III as per scope of work.
2021_NVDA_133092_1
05/G/2020-21
Open Tender
Civil Works - Others
730 days
Sehore
Please refer Tender documents.
4 documents required · 4 mandatory
₹50,000
₹15.4 L
Yes
Bhopal
28 Jun 2021
5 Mar 2021
6 Apr 2021
5 Mar 2021
5 Apr 2021
5 Mar 2021
22 Mar 2021
Amount
GHAT & ALLIED WORKS DISTRICT SEHORE, GROUP-III: Construction of (i) Ghat, RCC Retaining Wall and RCC Approach Road at Village Mardanpur and Rewgoan (ii) Ghat & RCC Retaining Wall at Village Nehlai (iii) Ghat at Village Mandi (iv) RCC Retaining Wall at Bhomda Nalla Village-Chhipaner including detail Survey and investigation with expert suggestions design and drawings with vetting from NIT/ IIT. Supplying and fixing of all miscellaneous accessories and all other miscellaneous work requires to complete entire work in 24 Months including maintenance of all structures for 03 years after completion and as directed by Engineer-in-Charge.
GHAT & ALLIED WORKS DISTRICT SEHORE, GROUP-III: Construction of (i) Ghat, RCC Retaining Wall and RCC Approach Road at Village Mardanpur and Rewgoan (ii) Ghat & RCC Retaining Wall at Village Nehlai (iii) Ghat at Village Mandi (iv) RCC Retaining Wall at Bhomda Nalla Village-Chhipaner including detail Survey and investigation with expert suggestions design and drawings with vetting from NIT/ IIT. Supplying and fixing of all miscellaneous accessories and all other miscellaneous work requires to complete entire work in 24 Months including maintenance of all structures for 03 years after completion and as directed by Engineer-in-Charge.
S V CONSTRUCTIONS
M/S Peeyush Sharma
Rajendra Singh Kiledar Constructions Pvt. Ltd. Betul (M.P.)
Banco Construction Pvt Ltd
RAMPAL SINGH MUKHTYAR AHMAD
ATUL KURARIYA
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid