Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹5.9 L+₹428.34 (0.07%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GIRIDHARAN K L2 | SURESH CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00Providing CC pavement at Ambetkar Nagar Seyyur Colony in Seyyur Panchayat | |||||
| 2.00 | Earth work Excavation and depositing on bank with initial lead and lift including all charges | 17.64 | cum | 130 ₹2,293 | 125 ₹2,205 Lowest |
| 3.00 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc.. Complete | 39.69 | cum | 5,910 ₹2,34,568 Lowest | 5,910 ₹2,34,568 Lowest |
| 4.00 | Supplying and erecting of Centering for all PCC items including cost and conveyance labour charges etc complete. | 104.86 | sqm | 182 ₹19,085 | 180 ₹18,875 Lowest |
| 5.00 | C.C 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete | 6.76 | cum | 6,668.52 ₹45,079 | 6,665 ₹45,055 Lowest |
| 6.00 | C.C 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete | 27.56 | cum | 7,216.46 ₹1,98,886 | 7,215 ₹1,98,845 Lowest |
| 7.00 | Supply and Fixing of Bitumen Pad | 1 | Each | 3,000 ₹3,000 Lowest | 3,000 ₹3,000 Lowest |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 90,523.98 ₹90,523.98 | 90,458.64 ₹90,458.64 Lowest |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
3 Sept 2026, 12:00 pmClosed
BDO BP AKM
Panchayat Union Arakkonam
Providing CC Pavement at Ambedkar Nagar Seyyur Colony H/O Seyyur Panchayat
2026_RDTN_696283_1
A2/2445/2026
Open Tender
Civil Works
Item Rate
180 days
Panchayat Union Arakkonam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,000
Yes
29 Sept 2026
20 Aug 2026
3 Sept 2026
20 Aug 2026
3 Sept 2026
20 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing CC pavement at Ambetkar Nagar Seyyur Colony in Seyyur Panchayat | - | - | - | - |
| 2 | Earth work Excavation and depositing on bank with initial lead and lift including all charges | 17.64 | cum | 131.89 | ₹2,326.54 |
| 3 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all etc.. Complete | 39.69 | cum | 5,913.49 | ₹2,34,706.42 |
| 4 | Supplying and erecting of Centering for all PCC items including cost and conveyance labour charges etc complete. | 104.86 | sqm | 182.5 | ₹19,136.95 |
| 5 | C.C 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete | 6.76 | cum | 6,668.52 | ₹45,079.2 |
| 6 | C.C 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete | 27.56 | cum | 7,216.46 | ₹1,98,885.64 |
| 7 | Supply and Fixing of Bitumen Pad | 1 | Each | 3,000 | ₹3,000 |
| 8 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | - | GST Amount | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
seyyur.pdf
Tender Documents • 0.35 MB
BOQ_837077.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .