Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC N A | ₹1.6 Cr | L1 | Accepted-AOC Allotted |
| 2 | L2₹1.6 Cr+₹93,475.75 (0.59%)Rejected-AOC NULL | ₹1.6 Cr+₹93,475.75 (0.59%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹1.6 Cr+₹2.7 L (1.70%)Rejected-Finance 1077 SECTOR 16 AND 17 125001 | HISAR | HISAR | HARYANA | 125001 | ₹1.6 Cr+₹2.7 L (1.70%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹1.6 Cr+₹4.0 L (2.51%)Rejected-Finance HARYANA ENGINEERING WORKS PORTAL HEWP | KAITHAL | HARYANA | 136020 | ₹1.6 Cr+₹4.0 L (2.51%) | L4 | Rejected-Finance Rejected |
| 5 | L5₹1.6 Cr+₹4.7 L (2.97%)Rejected-Finance DSS 72P SECTOR 15AP HISAR HARYANA 125001 | HISAR | HARYANA | 125001 | ₹1.6 Cr+₹4.7 L (2.97%) | L5 | Rejected-Finance Rejected |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
8 Oct 2020, 5:00 pmClosed
EE PD 1 Hisar
EE PD 1 PWD B and R Rajgarh road Opposite Congress Bhawan Hisar
Widening and Strengthening of road from Siswala to Bhiwani Rohillan (RD 0.500 to 3.700) in Hisar Distt. (Road ID 4931) under NABARD Scheme RIDF-XXVI
2020_HRY_145638_1
Widening Strengthening of road from Siswala to B
Open Tender
Civil Works
Item Wise
180 days
Hisar
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
EE PD1 PWD B and R
₹3.6 L
Yes
Hisar
1 Jan 2021
25 Sept 2020
9 Oct 2020
25 Sept 2020
8 Oct 2020
25 Sept 2020
28 Sept 2020
Amount
Milling of distress bituminous layer upto 20mm depth in a single pass with suitable milling machine (capable of milling @ 200-300 sqm area per Hr.) fitted with loading conveyor for loading the milled material directly on the trucks i/c hauling and stock piling the reclaimed material near the central recycling plant or reclaiming to bring to required specification to reuse with the approval of Engineer-in-Charge for safe disposal with all leads and lifts complete in all respects. Note I : The unutilized quantity of reclaimed bituminous mix material shall be a recovery item.
Dismantling Brick Work, Tile Masonry or Tile Lining and Tile Terracing Dry brick work [HSR 8.5 (i)]
Earth work excavation in ordinary soil exclusive of compensation of earth-earth-work undressed with a combined lead upto 15 metres including breaking of clods. (HSR 6.2b) , and re-compact the same including laying , dressing, watering & rolling as per HSR 6.2 g-i, g-iii & g-v
Preparation of berms including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift, but including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305 and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. As per X-section attached at DNIT at Section -9. This item also includes E/W if required in sub grade for Widening and Shoulder. Earth used for sub grade, shoulder and berms should have minimum CBR of 8%. Note:- No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer.
Preparation of sub grade including trenching, rough dressing of spoil, final dressing of earth, to given levels and camber, watering, rolling with road roller, and compacting the bed (HSR 24.1) Note: - In widening portion sub grade will be prepared with the use of Baby roller (HSR 24.1) or width of excavation should be made sufficient wide to accommodate road roller. Extra width required for compaction of sub grade shall not be paid and its expenditure shall be in incidental to the work.
Providing and laying 150 mm thick granular sub base consisting of filter layer confirming to Table 400.1 Grading - III of MoRT&H 5th edition, mixing in a mechanical mix plant at OMC, carriage of mix material to the site of work, spreading in uniform layer with motor grader on prepared surface and compacting with vibratory power roller to achieve desired density complete as per clause No. 401 of MoRT&H specifications. Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by engineer in writtng.
Providing & laying 225mm thick (Compacted) stone metal (G-II) 53mm to 22.4mm gauge wearing coat to water bound macadam in layer of 75 mm each using screening type ‘B’ compacting with 3 wheeled steel roller/vibratory roller to achieve the desire density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects. (N.S). Note:-only curst material should be used no local earth/sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by engineer in writtng.
Providing and Laying primer Coat using emulsion S.S. Grade-I @ of 60 Kg per hundred Sqm on new WBM surface and complete in all respects including cost of emulsion as per MoRT&H specification (5th edition)2013 clause No.502. (NS)
Providing and laying tack coat with bitumen VG-10 grade pressure distributor at the rate of 0.30 kg per sqm on the prepared bitumen/granular surface cleaned with mechanical broom including cost of bitumen as per clause No. 503 (5th edition) 2013 as per MoRT&H specification (NS)
Providing and Laying 50 mm thick Compacted bituminous macadam in (BM) in one layer by drum type hot mix plant and paver finisher with sensor control to the required grade as per clause No. 504 table No. 500-4 of MoRT&H specification for road and bridge works (5th Revision) of 2013 using minimum 3.4 % bitumen grade VG-30 as binder content by weight of total mix, complete in all respects i/c cost of bitumen, instruction issued from time to time by MoRT&H regarding machinery & bitumen will be followed strictly. The use of self propelled mechanical paver fitted with electronic sensor device conforming to MoRT&H specification in mandatory. If bitumen required on this account is more than 3.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. Note: Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS-6241. If coating and stripping to bitumen aggregate mix is less than 95%, anti-stripping agent will be used by the contractor. The anti-stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor.
Pdg & laying 50mm BM using the reclaimed material to the extent of 30% of the required quantity, hauling and stockpiling the reclaimed material near the central recycling plant after carrying out necessary checks and evaluation, adding fresh material including rejuvenators as required, mixing in Drum type hot mix plant, with appropriate arrangement for use of R.A.P., transporting and laying at site with hydraulic paver finisher with sensor control to the required grade and compacting to the required grade level and thickness with appropriate rollers all as specified in clause 519 (5th Revision) of 2013 using bitumen VG-30. (minimum Bitumen's 3.40% i/c bitumen of retrieved material as per job mix formula). Note: - 1. The milled material to be used in BM shall be minimum 80% of the theoretical quantity. 2. If bitumen required more than 3.40% as per job mix formula no extra payment will be paid extra bitumen required will be considered as incidental to work. 3. Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS-6241. If coating and stripping to bitumen aggregate mix is less than 95%, anti-stripping agent will be used by the contractor. The anti-stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor.
Providing and laying 20mm thick premix carpet (PC) excluding cost of tack coat, @ 1.46 Kg. per Sqm. with mixed material brought from Hot mix plant and laying with paver finisher and compacting with road roller to achieve specified value of compaction and direction of Engineer including cost of lighting arrangement, sign board and night watch, complete in all respect. I /c cost of Bitumen VG-10 grade as per clause 510 MoRT&H specification (5th edition) 2013 (NS). Note: Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS-6241. If coating and stripping to bitumen aggregate mix is less than 95%, anti-stripping agent will be used by the contractor. The anti-stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor.
Providing & laying “B” Type seal coat with VG-10 grade bitumen excluding cost of tack coat, with mixed material brought from Hot mix plant and laying with paver finisher and compacting with road roller to achieve specified/desirable value of compaction as per direction of Engineer including cost of lighting arrangement, sign board and night watch, complete in all respect as per clause 511 and 510.1.3 of MoRT&H specification (5th edition) 2013 (N.S)
Earth work in excavation in foundations, trenches, etc. in all kinds of soils, not exceeding 2 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 metres. (HSR 6.6)
Cement concrete 1:8:16 with brick ballast 40mm nominal size in foundation and plinth (HSR. 10.26)
First Class brick work laid in cement sand mortar 1:5 in foundation and plinth (HSR.11.3)
Providing, lowering, cutting, jointing and testing 600mm dia RCC pipe Class NP-3 as per IS 458-2003 with Spigot and socketed joints manufactured with ISI marked Sulphate Resistance Cement as per ISI 12330 with rubber rings ISI marked , antitermite as required at site , into trenches, for all depths and laying out the same to correct alignments, gradients and levels including dressing and trimming and cutting of concrete beds and sides of trenches , if required , Jointing with rubber rings in trenches and jointing with 1:1 ½ cement sand mortar and with end dowels filled with 1:1 ½ cement sand mortar and finishing the joints at angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in (HSR item No 29.38,29.44,29.45 & 29.46) including cartage , loading and unloading complete in all respects. Note:- Contractor shall supply bill of manufacture of pipes. Pipes should bear name of manufacturer and ISI mark along with bill duly valid ISI certificate of manufacturer should be supply. Without these bills certificate no payment shall be released.
Striking joints in lime or cement on brick and tile walls (HSR. 15.69 (a)
Earth filling under floor with surplus soil, excavated from foundation and taken only from cutside the building plinth, in 15cm layers including ramming watering and consolidating lead upto 30 metres (HSR. 6.13 a)
Providing & fixing Reinforcement cement concrete 1:2:4 km. stone village road of standard design fixed in position including finishing painting and lettering (HSR 10.129 (iii) + 16.75 (b) iii
Providing & fixing Reinforcement cement concrete 1:2:4 boundary pillers of standard design fixed in position including fixing painting and lettering. (HSR 10.131 + 16.69 (a).
Providing & Marking center line / side line 2.5mm thick (minimum) with hot applied thermo-plastic road marking paint 10 Cms wide complete in all respect such as furnishing all labour, materials, tolls equipments including all incidental costs necessary for carrying out in work at site confirming to the technical specification as clause No. 803 of MORT&H specification for road and bridge works (5th revision) of 2013/ Latest edition. Each container of the thermoplastic material shall have the name trademark or other means of identification of manufacturer, batch number, date of manufacture color maximum application temperature and maximum heating temperature. The thermoplastic paint material shall be of Asian Paint-Apcomark/Berger-Sigmarc/Prismo. The glass beads shall be of Potters/Sovitec/Fleolite. The thermoplastic material shall be sampled and tested in accordance with appropriate ASTM/BS method. The contractor shall furnish to the Engineer-in-Charge a copy of certified test reports from the manufacturer of the thermoplastic material meet all requirement of the specifications. The reflectorzing glass beads shall meet the requirement of clause 803.4.2 and test methods mentioned in clause 803.4.2.4 shall be meticulou8sly followed. The minimum thickness specified is exclusive of surface of glass beads the method of thickness measurement shall be in accordance with appendix B and C of BS:3262 (part-3). Note: - Before start of work the contractor shall give brand, batch number, manufacturing date of the material to be used along with a photocopy of bill duly signed by the contractor and get approved the same from Engineer-In-Charge before use.
Providing & erecting OVERHEAD SIGNS gantry supported by M. S. Pipe Structure (MS Pipe should be of TATA/Sail/Jindal/RINL make only) complete as per drawings, Technical Specifications and as directed by Engineer-In-Charge including painting with red oxide primer and first quality synthetic enamel paint, construction of R. C. C. foundation for providing of M. S Tubular structure for Cantilever signage at given site as per drawing enclosed. The C. C. mix to be in ratio of 1:1½:3 (RCC 1:1½:3) and that of lean to be ratio of 1:3:6 the work will be carried out as per the instructions of Engineer-In-Charge. Note: - Foundation including reinforcement etc. as per Drawing. Cantilever Over head Sign gantry. (r-Type) frame/truss Size- 3.05 m x 1.525 m.
Providing & fixing public information board consisting of 75 mm GI Pipe of size 2.45 m x 1.15 m with 900 mm x 900 mm GI sheet 16 gauge connected/ welded with 5 mm thick steel plate of 50 mm duly painetd as per cloumn mentioned in the Drawing and fixing at site in 60 x 60 x 75 cm cement concrete 1:2:4 block complete in all respect.
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. i) Material obtained on Brick work have been calculated taking assumption that 80% of theoretical material will be retrieved. The scarified material will be issued for use in any of the item for the work after modification (bringing it to required specifications) as per approval of employer. In case it is not possible to use this material on the work, the agency can take away this material after approval from employer. This material will be issued at the price quoted by the agency or reserve price whichever is high. The reserve price is as under:- Good Bricks @ Rs. 4.50/- per Each
Brick Bats @ Rs. 450/- per Cum. Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual scarifying and if material after scarifying is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price.
Routine Maintenance 1st year Maintenance as per general condition of contract data (Rs. 25464/- per km)
2nd year Maintenance as per general condition of contract data (Rs. 76394/- per km)
3rd year Maintenance as per general condition of contract data (Rs. 101858/- per km)
4th year Maintenance as per general condition of contract data (Rs. 127322/- per km)
5th year Maintenance as per general condition of contract data (Rs. 178252/- per km) Item no- 27 to 31 Note- The bidder is not required to quote his rate for routine maintenance. The rates are to be paid for routine maintenece are indicated in thebill of quantities. Further the payment for routine maintenance to the contractor shall be regulated based on his performance of maintenance activities as per chapter eleven of rural road in manual(IRC-SP-20-2002). Note:- If any discrepancy found in the unit/ Nomenclature in the items of BOQ. The Nomenculature of HSR/ MoRT&H shall be applicable
Jaideep Kumar Contractor
M/s Hisar Construction Company
SANJAY KUMAR
DHARIWAL BUILDTECH LIMITED
M.K. Constructions
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .