| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3 LAccepted-AOC | ₹3 L Quoted ₹1.8 L | 1 | Accepted-AOC Lowest |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
2 Jul 2025, 2:00 pmClosed
EE/D/SNKL
EE/D/SNKL
Execution of contract for Extension of supply works, Improvement and DCW works Except natural calamities work) in Town subdivision of Sankarankovil Division for an amount of Rs. 3 Lakhs for 6 months or upto completion of entire amount whichever is ea
2025_EB_574212_1
EE/D/SNKL/014/25-26
Open Tender
Miscellaneous Works
Works
120 days
EE/D/SNKL
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3,000
Yes
19 Jul 2025
26 Jun 2025
3 Jul 2025
26 Jun 2025
2 Jul 2025
26 Jun 2025
Amount
Normal ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles
Normal ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles
Rocky ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles
Rocky ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles
Normal ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles
Normal ground- Erection of 9M & 9.14M poles
Rocky ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles
Rocky ground- Erection of 9M & 9.14M poles
Normal ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36' length RS Joists
Normal ground- Erection of above 9.14M poles & 36' length RS Joists
Rocky ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36' length RS Joists
Rocky ground- Erection of above 9.14M poles & 36' length RS Joists
Transporting of poles from road side to pole pit - 7.32m, 7.5m, 8m, 8.23m RCC pole
Transporting of poles from road side to pole pit - 9m, 9.14m RCC/PSC pole
Transporting of poles from road side to pole pit - RSJ 36' Pole
Transporting of poles from road side to pole pit - RSJ 42' and above
Loading and Unloading of poles - 7.32m, 7.5m, 8m, 8.23m RCC pole
Loading and Unloading of poles - 9m, 9.14m RCC/PSC pole
Loading and Unloading of poles - RS Joists, tubular & rail pole (above 9.14m)
Concreting of poles as per Board Standards (2'*2'*5'). The material such as cement, sand, jelly, etc., have to be supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.)
Coping of pole (0.6m*0.6m*0.35m)
Concreting of stay (o.3m * 0.3m * 1.5m) including materials except cement
Coil earthing per pole & pole earthing
Normal ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)
Normal ground- Erection of stay set
Rocky ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)
Rocky ground- Erection of stay set
Loading charges of cement
Unloading charges of cement
Stacking charges
Fixing of V & Channel cross arm 5.5' including transporting of materials from road side to site
Fixing of V & Channel cross arm 4.5' including transporting of materials from road side to site
Fixing of V & Channel cross arm 3.5' including transporting of materials from road side to site
Fixing of LT 3Phase cross arm including transporting of materials from road side to site
Fixing of LT 1Phase cross arm including transporting of materials from road side to site
Fixing of HT LT TI fitting including transporting of materials from road side to site
Erection of HT Side arm with stud including transporting of materials from road side to site
Erection of LT Side arm with stud including transporting of materials from road side to site
Fixing of insulator (per location) including transporting of materials from road side to site
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/2.59 ACSR (1Span/Wire)
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/3.35 ACSR (1Span/Wire)
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR (1Span/Wire)
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For Dog Conductor (1Span/Wire)
For HT line clear works for For 7/2.59 ACSR (1Span/Wire)
For HT line clear works for For 7/3.35 ACSR (1Span/Wire)
For HT line clear works for For 7/4.09 ACSR (1Span/Wire)
For HT line clear works for ForDog conductor (1Span/Wire)
LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/2.59 ACSR
LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/3.35 ACSR
LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/4.09 ACSR
For LT line clear works for For 7/2.59 ACSR (1Span/Wire)
For LT line clear works for For 7/3.35 ACSR (1Span/Wire)
For LT line clear works for For 7/4.09 ACSR (1Span/Wire)
Guarding per span length- Spilt Neutral Guarding
Guarding per span length- Flat Guarding (2 wires)
Guarding per span length- Flat Guarding (4 wires)
Guarding per span length- Flat Guarding (6 wires)
Guarding per span length- Cradle Guarding (Fixing of ' X' arm Lacing )
Guarding per span length- Fixing of one earthing device with stud
Erection of transformer/dismantling upto 200KVA
Erection of transformer/dismantling upto 250KVA
Erection of transformer/dismantling upto 500KVA
Erection of centre support (Including concrete)
Erection of feeder cable with open type fuse unit per feeder and for each addl feeder
Erection of feeder cable with open type fuse unit - for each addl feeder
Erection of feeder cable -Bus bar arrangement with open type
Loading & unloading of Distribution transformer below 250KVA
Loading & unloading of Distribution transformer 250KVA
Loading & unloading of Distribution transformer 500KVA
Plinth work for 500KVA DT with construction material
Tube light erection-1*40W tube light complete set (including transport)
Tube light erection-For SV lamp and mercury lamp complete set (including transport)
Tube light erection-For CFL lamp complete set (including transport)
Manufacturing of clamps 50*8 mm
Manufacturing of clamps 65*10 mm
Alteration of clamps
Corroded pole welding with 4 pieces of charges (incl.Concreting of cement) note:pieces will be supplied by board
Welding joint for new RSJ pole at workshop per foot run of welding
Street light switching pont arrangement
Drilling less than 23mm holes per hole/slatted hole
Cutting of channel
Cutting of Flat
Cutting of Angle
RSJ pole cutting
Tubular pole cutting
Rail pole cutting
Fabrication of lightning arrestor frame
LT-Changing of pin point to cut point
HT-Changing of pin point to cut point
Erection of service connection materials-1Ph service
Erection of service connection materials-3Ph service
Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc.,
Dismantling of poles without concrete in damaged condition including grill separation etc.,
Providing jumpering at cut point
complete replacement of worn out earth wire per structure
Labour for manufacturing of open type fuse unit (Materials supplied by board)
Manufacturing of HG fuse stool incl. materials
Tree clearence in HT or LT location- For ordy. Tree clearence and Throng bushes & trees 400/head/day
Tree clearence in HT or LT location- For coconut trees and Palmrah trees 500/head/day
Painting-Double pole Transformer structure materials (Double coat)
Painting-Pole (Colour washing with distember) 2 Nos
Painting-For transformer only (Double coat with paint)
Numbering of poles without paint (Labour)
Numbering of poles with paint (Labour)
Numbering of Distribution Trnasformer (Painting and writing of name board size-1-1/4*1 incl cost of paint and MS sheet
Writing in seating channel (Paint to be supplied by contractor)
Painting of RCC Strcucture poles all metal parts, snowcem & aluminium paint to be supplied by contractor
Painting of RCC Strcucture poles all metal parts, snowcem & aluminium paint to be supplied by board
Painting of RSJ structure poles & metal parts-aluminium paint to be supplied by contrcator
Painting of RSJ structure poles & metal parts-aluminium paint to be supplied by board
Set right of leaning HT pole/LT pole including x arms, TI fittings
Transformer structure erection-Excavation of structure pole pits ( Nos)
Transformer structure erection-Erection of structure poles ( Nos)
Transformer structure erection-Excavation of stay pits(4Nos)
Transformer structure erection-Erection of stay set (4Nos)
Transformer structure erection-Concreting of structure poles incl.materials
Transformer structure erection-Concreting of stays (4Nos) incl.materials
Transformer structure erection-Base Concreting
Erection of Structure materials-Top Channel
Erection of Structure materials-Transformer seating channel and belting angle
Erection of Structure materials-AB switch (Complete)
Erection of Structure materials-HG fuse (Complete)
Erection of Structure materials-Jumpering
Erection of Structure materials-HT LAS
Erection of Structure materials-LT LAS
Earthing system-Excavation of 3 Nos. earth pits
Earthing system-Excavation of earth wire trenches and paving of earth wire, Erection of 3 Nos. earth pipe and giving earth connection, Earthing of all metal parts, Las etc., including central connection
Earthing system-Mason works for earth pits and structure pole coping (cement supplied by Contractor)
Earthing system-Painting of transformer structure 2 coats (Labour only)
Earthing system-Painting with Distember paint on poles
Earthing system-Spreading yard jelly and cut stone and bricks including material
Earthing system-Writing of name board and target board
Erection of Tapping structure-Excavation of structure pole pit.
Erection of Tapping structure-Erection of structure pole.
Erection of Tapping structure-Excavation of stay pit.
Erection of Tapping structure-Erection of stay set.
Erection of Tapping structure-Concreting of pole.
Erection of Tapping structure-Concreting of stay.
Erection of Tapping structure-Base Concreting.
Erection of Structure materials-Top channel
Erection of Structure materials-AB switch (complete)
Erection of Structure materials-Assemble, operating pipe fixing etc., fixing of cross bracing
Earthing system-Excavation of 1 No. earth pits Excavation of earth wire trench and paving of earth wire, Erection of 1 No. earth pipe and giving earth connection, Earthing of all metal parts, for tapping structure.
Earthing system-Mason works for earth pit (including material)
Colour coating on poles with iron materials including paint and distember
Transporting of 42' twin RSJ pole from roadside pole pit
Fabrication of 42' Twin RSJ pole, Materials supplied by Board.
Excavation & Erection of Twin 42'2' fabricated RSJ pole
Concreting of 42' twin RSJ pole
Singple pole structure erection- 9.0 mtr RCC POLE (square) -Loading & Unloading of poles
Singple pole structure erection- 9.0 mtr RCC POLE (square) -Excavation of pole pit & pole erection
Singple pole structure erection- 9.0 mtr RCC POLE (square) -Transporting road side to pole pit
Singple pole structure erection-Excavation and erection of stay set complete with stay clamps ( with 16mm stay rod with base plate )
Fixing of single pole structure materials & structure clamps ( Tapping channel - 1 No., Tr.bed, Erection AB switch - 1 set, Erection HG Fuse set - 1 set )
Erection of 16/25 KVA,11KV / 433 Volts 3 phase
Earthing for 9 mtr RCC structure square pole (3 pits)
Concreting including materials for 9 mtr RCC square pole-Base concreting 1:4:8 500*650*150mm, Pole concreting1:2:4 500*500*1700 & Coping 1:2:4 ( as per actuals )
Concreting including materials for stay sets. (cement, jelly and sand)
Fixing of 11 Kv lighting arrester, metal oxide, 9 KV, 5 KA (HT & LT)
Erection of LT wiring kit ( Double open type circuit)
Fixing of caution / Danger Board as per drawing
Painting of single pole str including iron materials double coat with painting materials
Fixing of guarding X arm
Fixing of Tapping channel X arm
Fixing of LT shackle
Fixing of 11 KV Strain Disc
Maintenance of AB switch-Replacement of male and female one number contact and PTinsulator
Maintenance of AB switch-Cleaning of contacts, lubrication and checking of operating pipe movments
Maintenance of Distribution Transformer-Cleaning of HT/LT Bushings, Oil level checking , Silical gel replacement, Terminal tightness checking, Cleaning of DT yard, earth pit watering and maintenance of open types etc.,
Maintenance of Distribution Transformer-Providing of 'U' jumpering
Dismantling of other line materials - (Please mention In percentage for respective line material errection works)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .