Xen PHE Poonch
Xen PHE Poonch
P/L and fitting of GI pipes at WSS Topa Salwah under BADP
2022_PHE_196117_1
e-NIT No. 99 of 2022-23 Dated 15-11-2022
Open Tender
Civil Works
Item Rate
30 days
Poonch
as per nit
2 documents required · 2 mandatory
₹500
Xen PHE Poonch
Exempted
7 Jan 2023
15 Nov 2022
5 Dec 2022
15 Nov 2022
5 Dec 2022
15 Nov 2022
Amount
PIPE WORK P/L
Excavating trenches of required width for pipes, cables etc including excavation of rocks, dressing of sides ramming of bottoms depth up to 0.50 m including getting out the excavated soil and disposing of surplus soil up to 50 m lead with all kind of soil .
Providing Laying and Fixing of 15 mm dia (L) complete with GI fittings excluding trenching and refilling etc. (External Work)
Providing Laying and Fixing of 20 mm dia (L) complete with GI fittings excluding trenching and refilling etc. (External Work)
Providing Laying and Fixing of 25mm dia (L) complete with GI fittings excluding trenching and refilling etc. (External Work)
Providing Laying and Fixing of 32 mm dia (L) complete with GI fittings excluding trenching and refilling etc. (External Work)
Providing Laying and Fixing of 65mm dia (M) complete with GI fittings excluding trenching and refilling etc. (External Work)
Fill available excavated earth (excluding rock)in trenches , Plinths, sides of foundation etc. Layers not exceeding 20 cm in depth, consolidating each deposited layer excluding ramming and watering lead up to 50 m and lift up to 1.5 M (80% quantity of earthwork)
Carriage of G.I. Pipe avg. distance 1.5 KM by hl from
Making of interconnection of GI distribution with GI main including cutting rethreading 25-40mm
Making of interconnection of GI distribution with GI main including cutting rethreading above 40mm
P/F of Gate valve approved quality
P/F of Check valve/NRV of approved quality
80mm/65mm dia
PIPE WORK L/F
Excavating trenches of required width for pipes, cables etc including excavation of rocks, dressing of sides ramming of bottoms depth up to 0.50 m including getting out the excavated soil and disposing of surplus soil up to 50 m lead with all kind of soil .
Laying fitting of GI pipes 20 mm dia
Laying fitting of GI pipes 25mm dia
Laying fitting of GI pipes 32mm dia
Fill available excavated earth (excluding rock)in trenches , Plinths, sides of foundation etc. Layers not exceeding 20 cm in depth, consolidating each deposited layer excluding ramming and watering lead up to 50 m and lift up to 1.5 M (80% quantity of earthwork)
Carriage of G.I. Pipe avg. distance 2 KM by HL from road side to site
Making of interconnection of GI distribution with GI main 25-40mm
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .