Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹36.5 L
EMD Value
₹36,450
Closing Date
7 Dec 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Panchayat President, Kallurani.
The Panchayat President, Panchayat Office, Kallurani.
Providing water supply system by construction of new open well in Kallurani Panchayat of Keelapavoor Panchayat Union.
2023_RDTN_395207_1
President kallurani28/11/2023
Open Tender
Civil Works
Works
180 days
keelapavoor
Refer tender notice
2 documents required · 2 mandatory
₹0
₹36,450
7 Dec 2023
1 Dec 2023
7 Dec 2023
1 Dec 2023
7 Dec 2023
1 Dec 2023
Amount
Providing Water Supply System by Construction of New Open Well in Kallurani Panchayat of Keelapavoor Panchayat Union.
Open well Excavation Complying with Relevant Clauses of TNBP Well Sinking and with Lead up to 10m in Hard Stiff clay, Black Cotton soil, Hard Red Earth, Shales, Murram, Gravel and Stoney earth etc., and earth mixed with small size boulders and hard gravelly soils etc., complete.
1st Depth from 0m - 2m
Open well Excavation Complying with Relevant Clauses of TNBP Well Sinking and with Lead up to 10m in Soft Disintegrated Rock, Laterite, Soft Rock or Kankar not requiring Blasting (and excluding bailing out of water) etc., complete.
2nd Depth from 2m - 4m
3rd Depth from 4m - 6m
4rd Depth from 6m - 8m
5rd Depth from 8m - 9m
Open well Excavation Complying with Relevant Clauses of TNBP Well Sinking and with Lead up to 10m in Medium Rock and Dense Medium Rock not requiring Blasting (and excluding bailing out of water) etc., complete.
5th Depth from 9m - 10m
Open well Excavation Complying with Relevant Clauses of TNBP Well Sinking and with Lead up to 10m in Medium Rock and Dense Medium Rock requiring Blasting (and excluding bailing out of water) etc., complete.
6th Depth from 10m - 12m
Open well Excavation Complying with Relevant Clauses of TNBP Well Sinking and with Lead up to 10m in Hard granite Measured in soild including Blasting and stacking (and excluding bailing out of water) etc., complete.
7th Depth from 12m - 14m
8th Depth from 14m - 16m
9th Depth from 16m - 18m
10th Depth from 18m - 19m
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
Centering charges for RCC works including all cost and conveyance all materials to site etc., complete.
For Side wall (-8.300 to -9.300m) (ie., from 8.30m Below GL to 9.30m Below GL)
For Side wall (-8.300 to -7.300m) (ie., from 8.30m Below GL to 7.3m Below GL)
For Side wall (-7.300 to 6.300m) (ie., from 7.30m Below GL to 6.30m GL)
For Side wall (-6.300 to 5.300m) (ie., from 6.30m Below GL to 5.30m GL)
For Side wall (-5.300 to 4.300m) (ie., from 5.30m Below GL to 4.30m GL)
For Side wall (-4.300 to 3.300m) (ie., from 4.30m Below GL to 3.30m GL)
For Side wall (-3.300 to 0.000m) (ie., from 3.30m Below GL to 0.000m GL)
For Side wall (0.000m to +1.500m) (Above GL)
Supplying and fabrication of steel including all cost and conveyance and all labour charges for cutting, bending, tieing and placeing in position etc., complete.
RCC 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete excluding cost of steel without centering.
4.50m to 9.00m Below GL
1.50m to 4.50m Below GL (ie., -4.50 to -1.50m)
0.00m to 1.50m Below GL (ie., -1.50 to 0.00m)
Above GL (+0.000 - +1.500m)
Supplying and filling with excavated earth including cost and conveyance and all labour charges such as watering and ramming etc., complete as per standard specification.
Providing for conducting Geo Physical Survey
SUB ESTIMATE I
Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
Earth Fillng for Basement and Foundation as per Standard Specification
Supply and Filling the M.sand complying with stanard specifications etc., complete.
Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete.
Basement
Super Structure
Centering charges for RCC works including all cost and conveyance all materials to site etc., complete.
Supplying and fabrication of steel of RCC works including all cost and conveyance and all labour charges such as cutting bending tying and placed in position etc., complete.
RCC 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete excluding cost of steel without centering.
Terrace flooring with one course of new Machine Pressed tiles of size 23x23x2cm using CM 1:3 with water proffing compound 2% weight of cement used and joints pointed with same mortor including all cost and conveyance of all materials and all labour charges etc., complete
Supply and Fixing of RCC Jolly including cost and conveyance of all materials to site and all labour charges etc., complete
Supply and Fixing of steel door including cost and conveyance of all materials to site and all labour charges etc., complete
Painting two coats over Outer wall surface with best approved quality and colour Plastic emulsion paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats using enamel painting two coats including cost and conveyance and all materials to site and labour charges etc., complete.
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
Plastering with cm 1:5mix 12mm thick including cost and conveyance and all materials to site and labour charges etc., complete.
Plastering with cm 1:3mix 10mm thick including cost and conveyance and all materials to site and labour charges etc., complete.
SUB ESTIMATE II
Supply and Delivery of 3 Phase Wet Type Openwell Submercible Pump Set With Duty Condition ( 75 M Head x 100 LPM )
Supply and fixing of panel Board (Three Phase) for 5 HP Pump Set
Supply delivery of 1.1 KV grade 3 core PVC insulated 4sq.mm copper flat submersible
Labour charges for erection of submersible pump set etc complete
SUB ESTIMATE III
S/D of 90mm PVC 6 KSC Pipe etc., complete
S/D of 80mm GI Pipe etc., complete
Earth work excavation with an initial lead and lift in hard stiff clay, black cotton, hard red earth, sub murram gravel, stone and earth mixed boulders as per SS20B for pipe laying work.
Refilling the excavated earth including all cost and conveyance of materials and all labour charges etc completed.
Labour charges for Laying of GI, PVC rigid pipes with lead of 200m lowering into trench, laying in proper grade, alignment, jointing PVC coupler with specials and tested to the required pressure including conveyance of water upto 1km lead during the testi
80mm GI Pipes
90mm 6 KSC PVC Pipes
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
A.Kulasekaraperumal
stage.html
html • 0.02 MB
finance_470760.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .