Loading…
Loading…
Tender ID
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance H A 24 2210 VILL WEST KODILA LICHU BAGAN P O NEW BARRACK PUR KOLKATA 700 131 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700131 | L1 | Admitted-Finance | ||
| 2 | L2₹6.0 L+₹1.0 L (20.0%)Admitted-Finance 13 11 MOTILAL GUPTA ROAD KOLKATA 700 008 | KOLKATA | KOLKATA | WEST BENGAL | 700008 | L2 | Admitted-Finance | ||
| 3 | L3₹6.2 L+₹1.2 L (23.1%)Admitted-Finance 3 C DR JAGABANDHU LANE KOLKATA 700012 | KOLKATA | KOLKATA | WEST BENGAL | 700012 | L3 | Admitted-Finance |
Tender Value
₹7.7 L
EMD Value
₹15,447
Closing Date
3 Feb 2026, 1:00 pmClosed
EEI,KNHED, PW Dte
THE EXECUTIVE ENGINEER, P.W.D /KOLKATA NORTH HEALTH ELECTRICAL DIVISION
Operation of Bed-cum Passenger lift at BC Roy PGIPS Phool Bagan under North Kolkata Health Electrical Sub-Division,PWD. (For the F.Y. - 2026-27)
2026_WBPWD_985112_1
WBPWD/EE/KNHED/e-NIT-11/25-26
Open Tender
ELECTRICAL WORKS M/R
Percentage
365 days
Kolkata
Please refer Tender documents.
5 documents required · 5 mandatory
₹15,447
Yes
Office of the EE, KNHED,PW Dte
11 May 2026
7 Jan 2026
5 Feb 2026
7 Jan 2026
3 Feb 2026
16 Jan 2026
15 Jan 2026
Day to day Operation/ Bed-cum passenger lifts by providing Lift Operator 03 (three) shift throughout the year. For 3 shift per Day For 'Dr BC Roy PGIPS : Semiskilled Labour
The agnecy will be bound to produce ESI,PF challan when asked for by the EIC i)Cleaning / House Keeping Lift Machine Room ,Lift well , & Lift car to be done by the concern agency operating the lift . ii)The lift operator/attendant should have a sound knowledge with valid lift operator license issued by the Licensing Board, Govt. of West Bengal. iii)The operator/attendant should be obliging dutiful and polite to all while on duty. In case any irregularities of duty or complain against the operator/attendant if noticed, would be withdrawn forthwith and shall be replaced by new operator.
iv)The report is to be submitted periodically about the working of lift incl. all safety devices and Governor to the concerned JE/AE. v)Agency must have to produce the list of the staff mentioning their Name, contact Mobile No.in writing with proper photo identity and address proof & their Valid Lift Operating License issued by D.O.E., Govt of West Bengal along with photo copy to the concerned JE & AE before commencing the work. This should be treated as mandatory. vi)The agency will have to provide proper dress for his staff and color of the dress will be decided by the EIC. No staff will be allowed for performing duty without proper dress.
vii)The agency will issue a photo Identity Card, duly signed by the agency and countersigned by the concerned JE / AE to all the operation Staffs deployed including substitutes. They should always carry the said Photo Identity Card while on duty. The agency should also submit one copy of the said Identity Cards to the JE viii)The agency shall have to prepare a Duty Roster of the operation Staff at the beginning of every month, or as directed from time to time. A copy of the said Duty Roster, duly signed by all staffs, should be submitted to the concerned JE.
ix)The agency must have separate contact telephone numbers with Mobile Nos. for his office and Supervisor deputed at worksite so that the agency may be communicated in case of any urgency and the same should be intimated to the E.I.C., A.E. & J.E concerned, in writing. The telephone call should be responded without delay. x)Rescue operation is in the scope of agency in case of exigency arises out of lifts getting stopped in between landing floors with passengers inside cage. xi)The lift enclosure , Machine Room to be kept neat & clean regularly by the operator.
xii)The operational work of the lift is to be supervised directly under the supervision of technical staff of the contractors under the direct control of JE/AE concerned. The contractor shall be responsible for any damage to the lift due to mishandling, loss will be recovered from the contractors bill as per direction of EIC. xiii)The Log Book recording regarding functioning, checking of ARD of lift weekly and breakdown of the lift is to be maintained at site by the contractor under supervisions of JE concerned. If any kind of trouble arises, it should be brought to the notice of JE, AE concerned immediately. The JE/AE would put their signature on log book making note on performance.
xiv)In case of any absence of operator, alternative operator immidiately to be placed. In case of absence prorate deduction will be made from the contractors bill and the contract may be terminated if it exceeds 3 (three) days. In this respect Executive Engineer’s decision will be final. xv)This department would not be held responsibility for any accident of the liftman on duty for any reasons. The contractor or their lift operators on duty would not claim any compensation in any shape from this department for such accident.
xvi)The Executive Engineer,North Kolkata Health Electrical Division, P.W.Dte. would have sole authority to cancel the contract without assigning any reason with a notice of one month only. xvii)Any conditional quotation offered would not be accepted. xviii)Any quotation offered with price variation clause would not be accepted. xix)The payment will be made quarterly on submission of bill in triplicate by the agency with satisfactory report regarding performance by the concerned JE/AE. Copy of log book has to be enclosed with the bill.
xx)Documentary evidence in support of payment of minimum wages as per Labour Act to be produced to the Principal Employer i.e. Executive Engineer,North Kolkata Health Electrical Division, P.W.Dte. in-charge of works if any discripency or issue came under his notice . xxi)As per direction of EIC Lift Operator may be posted at any lift under R.G Kar Medical College Electrical Sub-Division, P.W.Dte. for on going and upcoming Lift if any.
xxii)The agency has to provide one GPS activated smart phone dedicated for call center. The cost of the handset and running cost i.e. phone bills have to be borne by the agency. No claim of payment against any telephone bill will be entertained by this department.The 24 hour x 7 days Available Phone number of Supervisor/Owner to be pasted on lift wall .xxiii)The supervisor/operator must inform JE/AE any Lift related problem at the earliest .
xxvi)The Lift Operator / Attendant Personnel, deputed by the agency preferably should be a permanent resident of West Bengal with valid Voter Identity/ Adhaar Card and should possess valid Lift Operator License, as mentioned below, issued by Directorate of Electricity, Govt. of West Bengal xxvii)Semi-Skill (Lift operator/attendant) =Lift Operating License issued by D.O.E., Govt of West Bengal
xxvi)The Lift Operator / Attendant Personnel, deputed by the agency preferably should be a permanent resident of West Bengal with valid Voter Identity/ Adhaar Card and should possess valid Lift Operator License, as mentioned below, issued by Directorate of Electricity, Govt. of West Bengal xxvii)Semi-Skill (Lift operator/attendant) =Lift Operating License issued by D.O.E., Govt of West Benga
xxviii)If The concern agency maintain or pay the minimum wages as per state government rule/Law as stand the 1 st january of the Acceptence reciving year . xxix)The Deduction pershift=(1/30)*(Rate/Shift/Month) should be deducted as penalty from bill amount in case any absent in per shift lift opration xxx) The payment to be done to the agency against bill depends upon availability of fund xxxi) The Log Book recording regarding functioning,checkingof ARD of lift weekly and breakdown of the lift is to be maintained at site by the contract or under supervision of JE concerned. If any kind of troublearises,it should be brought to the notice of JE,AE concernedimmediately.The JE/AEwouldputtheirsignatureonlogbookmakingnote on performance
Add :- GST 18%
Add:- LWC 1%
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.28 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.58 MB
suspension.pdf
Additional Documents • 2.91 MB
2911.pdf
Tender Documents • 0.50 MB
BOQ_2404044.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .