Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56,655Accepted-AOC | L1 | Accepted-AOC L1 |
Tender Value
₹56,655
Closing Date
17 Feb 2025, 2:00 pmClosed
EE/D/KZI
EE/D/KZI
Natural calamity estimate for the replacement of damaged 1 no 8mts PSC poleat Loc no FI 2 and reerection of leaned pole structure and a 9mts pole at loc FII 2 at vattiyamkonam SS 63 KVA due to fallen of rubber tree over HT LT line on 27.06.2024
2025_EB_524270_1
EE/D/KZI/ETW 35/dt03.02.2025
Open Tender
Electrical Works
Works
90 days
Kuzhithurai
As per Specification
3 documents required · 3 mandatory
₹0
Yes
8 May 2025
12 Feb 2025
18 Feb 2025
12 Feb 2025
17 Feb 2025
12 Feb 2025
12 Feb 2025 - 17 Feb 2025
Civil works
Excavation of pole pit upto 8.0 mts length by using JCB/Manual
Erection of RCC,REC,PSC pole upto 8.0 Mts length by using Crane/manual
Loading & unloading charges of all RCC ,REC pole upto 8.0 Mts length
Transporting charges of all type of pole and other associated materials from Road side to pole pit and vice versa up to 2 KM
Dismantling & Re-Erection of 3Q Xarm
Dismantling & Re-Erection of SQ X arm
Dismantling & Re Fixing of LT Pin Insulater
Dismantling & Re Fixing of HT Pin Insulater
Dismantling & Re Fixing of HT Disc Insulater
Dismantling & Re Fixing of shackle
Dismantling & Re Fixing of Aluminium knob
Dismantling & Re-Erection of V Xarm
Dismantling & Re-Erection of HT/LT 'TI' Fittings
Dismantling & Re Erection of stay set complete
Dismantiling Re-Erection of 1*40 W tube light cmplete set
Dismantiling & Redoing of S phase connection
Dismantiling & Re Stringing of conductor 7/4.09 mm ACSR
Dismantiling & Re Stringing of conductor up to 7/2.59 mm ACSR or other equivalent conductor
Dismantiling of Distribution Transformer Structure complete including AB Switch,HG Fuse set, feederAarrangement, Jumbering,beltting angle,setting channel,HT/LT lAS and earth pits
Erection of Distn Tr Str complete as per TNEB standard including painting,Feeders arrangement,colour washing of RCC poles etc…Excavation and leaning of pole of HT/LT lAS and Jumbering 3 nos Earth pit with earth etc
Dismantiling of Distribution Transformer 100KVA
Erection of Distribution Transformer Above 25 KVA to 100KVA
OrdinaryTree Clearance
Coconut Tree Clearance
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .