Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.6 LAdmitted-Finance | -7.00% | ₹5.6 L | L1 | Admitted-Finance |
| 2 | L2₹5.6 LAdmitted-Finance | -5.60% | ₹5.6 L | L2 | Admitted-Finance |
| 3 | L3₹5.9 LAdmitted-Finance CHAKIYA CHANDAULI | CHAKIYA | CHANDAULI | UTTAR PRADESH | -1.00% | ₹5.9 L | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹59,850
Closing Date
15 Apr 2026, 2:00 pmClosed
CE
Nagar Nigam Ayodhya
Mangal pandey ward me vidhalay me rangai putai etc ka karya As per NIT 06
2026_DOLBU_1131631_6
1145/NNA/2026
Open Tender
Civil Works
30 days
Ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹850
MC
₹59,850
11 May 2026
30 Mar 2026
15 Apr 2026
30 Mar 2026
15 Apr 2026
30 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation in soil mixed with mooram, shingle etc including 1.5metre lift and 30metre lead etc. | |||||
| 2P/L of Cement Concrete 1:4:8(1 cement, 4 fine sand, 8 brick ballast 40mm nominal size) including supply of all material, labour and T & P etc. required for proper completion of work and curing complete also including cost of formwork in foundation and floors. | |||||
| 3First class B/W in 1:4 cement & fine sand including supply of all material, labour and T & P required for proper completion of work in foundation. | |||||
| 4M150 Class brick work in superstructure in 9" wall in 1:4 cement and fine sand of 1.25 F.M. mortar including supply of all material, labour and T & P etc. required for proper completion of work and curing complete | |||||
| 5M150 Class brick work in superstructure in 4" wall in 1:4 cement and coarse sand of 1.25 F.M. mortar including supply of all material, labour and T & P etc. required for proper completion of work and curing complete | |||||
| 612mm thick plaster with cement mortar in proportion of 1:4 cement & fine sand including supply of all material, labour and T & P etc. required for proper completion of work and curing complete | |||||
| 7S/F of Iron ventilator with frame & all fittings for WC | |||||
| 8Painting iron work, two coat including primer coat etc. | |||||
| 9Wall finishing with cement paint two coat including primer coat etc. | |||||
| 10P/L of Cement Concrete 1:2:4(1 cement, 2 fine sand, 4 graded stone ballast 20mm nominal size) including supply of all material, labour and T & P etc. required for proper completion of work and curing complete also including cost of formwork in foundation and floors. | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_2112246.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid