| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.6 LAdmitted-Finance | -7.00% | ₹5.6 L | L1 | Admitted-Finance |
| 2 | L2₹5.6 L+₹8,373.34 (1.51%)Admitted-Finance | -5.60% | ₹5.6 L+₹8,373.34 (1.51%) | L2 | Admitted-Finance |
| 3 | L3₹5.9 L+₹35,885.76 (6.45%)Admitted-Finance CHAKIYA CHANDAULI | CHAKIYA | CHANDAULI | UTTAR PRADESH | -1.00% | ₹5.9 L+₹35,885.76 (6.45%) | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹59,850
Closing Date
15 Apr 2026, 2:00 pmClosed
CE
Nagar Nigam Ayodhya
Mangal pandey ward me vidhalay me rangai putai etc ka karya As per NIT 06
2026_DOLBU_1131631_6
1145/NNA/2026
Open Tender
Civil Works
Percentage
30 days
Ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹850
MC
₹59,850
11 May 2026
30 Mar 2026
15 Apr 2026
30 Mar 2026
15 Apr 2026
30 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation in soil mixed with mooram, shingle etc including 1.5metre lift and 30metre lead etc. | |||||
| 2P/L of Cement Concrete 1:4:8(1 cement, 4 fine sand, 8 brick ballast 40mm nominal size) including supply of all material, labour and T & P etc. required for proper completion of work and curing complete also including cost of formwork in foundation and floors. | |||||
| 3First class B/W in 1:4 cement & fine sand including supply of all material, labour and T & P required for proper completion of work in foundation. | |||||
| 4M150 Class brick work in superstructure in 9" wall in 1:4 cement and fine sand of 1.25 F.M. mortar including supply of all material, labour and T & P etc. required for proper completion of work and curing complete | |||||
| 5M150 Class brick work in superstructure in 4" wall in 1:4 cement and coarse sand of 1.25 F.M. mortar including supply of all material, labour and T & P etc. required for proper completion of work and curing complete | |||||
| 612mm thick plaster with cement mortar in proportion of 1:4 cement & fine sand including supply of all material, labour and T & P etc. required for proper completion of work and curing complete | |||||
| 7S/F of Iron ventilator with frame & all fittings for WC | |||||
| 8Painting iron work, two coat including primer coat etc. | |||||
| 9Wall finishing with cement paint two coat including primer coat etc. | |||||
| 10P/L of Cement Concrete 1:2:4(1 cement, 2 fine sand, 4 graded stone ballast 20mm nominal size) including supply of all material, labour and T & P etc. required for proper completion of work and curing complete also including cost of formwork in foundation and floors. | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_2112246.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .