Panchayat Pradhan
Office of the Pradhan Dungra GP
Culvert bridge repairing at Dungra Cluster house P.S NO 193 under Dungra G.P within Kalimpong-I Dev. Block under Amader Para Amader Samadhan
2025_GTA_940173_1
PP/DUNGRAGP- KPG-I/eNIT 04/2025-2026
Open Tender
CIVIL WORKS
Percentage
45 days
Kalimpong
Please refer Tender documents.
3 documents required · 3 mandatory
₹663
₹4,420
8 Dec 2025
6 Nov 2025
1 Dec 2025
6 Nov 2025
28 Nov 2025
6 Nov 2025
PWD(WB)/BUILDING WORKS(CCS)/Page-1/Item-2Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. .(a) Depth of excavation not exceeding 1.500 mm.
PWD(WB)/BUILDING WORKS(CCS)/Page-229/Item-12Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming.
PWD(WB)/BUILDING WORKS(CCS)/Page-229/Item-11ACost of stone boulder 150 mm size delivered ans stacked at site.
PWD(WB)/BUILDING WORKS(CCS)/Page-22/Item-44 Rubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site In Road and Jhora Work
PWD(WB)/BUILDING WORKS(CCS)/Page-34/Item-22II (II) Cement concrete with 30 mm. down graded shingles excluding shuttering.N.B. VarietyIn ground floor .(a) 1:3:6 proportion.
PWD(WB)/BUILDING WORKS(CCS)/Page-92/Item-1 Taking out old damaged tarfelt from the roof, parapet etc.preparing the roof surfaces by removing all spoils, blisters,moss etc. from the working site and disposal of the samebeyond the compound and cleaning the site in all respect asper direction of Engineer-in-Charge. All floor.
PWD(WB)/BUILDING WORKS(CCS)/Page-192/Item-1 Labour for Chipping of concrete surface before taking up Plastering work.
PWD(WB)/BUILDING WORKS(CCS)/Page-10/Item-2 Dismantling all type of plain cement concrete works, stacking serviceable materrials at site and removing rubbish as directed with in a lead of 75 m In ground floor including roof. (a) upto 150 mm. thick.
PWD(WB)/BUILDING WORKS(CCS)/Page-24/Item-5 Controlled Cement concrete with well graded stone chips (20 mm nominal size ) excluding shuttering and reinforcement with complete design of concrete as per ISI-456 and relevant special publications submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in-charge. Consumption of cement will not be less then 300kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basic of preliminary test & job mix formula In Ground floor & foundation.[using concrete mixture]M 20 Grade. (ii) N.B. Veriety (stone metal).
PWD(WB)/BUILDING WORKS(CCS)/Page-43/Item-40 Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction. (a) For works in foundation, basement and up to roof of ground floor/up to 4m. Tor steel/Mild steel.other than SAIL/TATA/RINL/JSW/JSPL/Shyam/SRMB/ISSL/BMASL/Electrosteel
PWD(WB)/BUILDING WORKS(CCS)/Page-42/Item-36 Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). (a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of the Engineer-in-charge.
PWD(WB)/BUILDING WORKS(CCS)/Page-189/Item-1 Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface].(i) with 1:6 cement mortar.(c)15 mm. thick plaster.
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.28 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_2223389.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .