| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.7 LAccepted-AOC UTTAR PRADESH UP | GONDA | UTTAR PRADESH | 271001 | ₹53.7 L | L1 | Accepted-AOC AOC |
| 2 | L2₹59.2 LRejected-Finance UTTAR PRADESH UP | AGRA | UTTAR PRADESH | 283110 | ₹59.2 L | L2 | Rejected-Finance Not admitted |
| 3 | L3₹59.6 LRejected-Finance CHANDAULI | ₹59.6 L | L3 | Rejected-Finance Not admitted |
| 4 | Not Admitted-Fee/PreQual/Technical UTTAR PRADESH UP | GORAKHPUR | UTTAR PRADESH | 273001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Updated dates
Tender Value
₹72 L
EMD Value
₹5.6 L
Closing Date
11 May 2026, 12:00 pmClosed
SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur
SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur
C/o Amberpur Belwa Jamua Tekari road (ODR) Km 4 me 3x3x3 Mtr RCC Box Culvert and Approach Road in Distt. Jaunpur
2026_CEUVZ_1134842_1
1993/SETender/jnp-gzp circle/25 Date-30-03-2026
Open Tender
Civil Works
180 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹5.6 L
Yes
22 May 2026
9 Apr 2026
11 May 2026
9 Apr 2026
11 May 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantiling brick work in line or cement mortar and including stacking of materials as directed by the engineer in charge within a distance of 60 metres as per Si no 692 Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert) | - | Cum | - | - |
| 2 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert) | - | Cum | - | - |
| 3 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MORTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. As per MORTH Sr.No. 13.10 and 710.1.4.of IRC:78 and 2200 Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert) | - | Cum | - | - |
| 4 | Plain cement concrete 1:3:6 with crushed stone nominal mix in foundation aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curring for 14 days. Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert) | - | Cum | - | - |
| 5 | RCC Grade M30 using batching plant transit mixer & manual placing as per MORTH SI. No. 12.9 Case-II and specification No.1500, 1700, 2100 Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert) | - | Cum | - | - |
| 6 | Supplying, fitting and placing HYSD reinforcement complete in sub-structure drawing as per and Technical Specification As per MORTH Sr.No. 12.40 and Specification No. 1600 Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert) | - | MT | - | - |
| 7 | Plain cement concrete in open foundation complete and as per drawing technical specifications. (M- 15) As per MORTH Sr.No. 12.8 and Specification No. 1500, 1700 Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert) | - | Cum | - | - |
| 8 | Providing and laying Pitching on slopes laid including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. As per MORTH Sr.No. 15.4 and Specification No. 2504 Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert) | - | Cum | - | - |
| 9 | Providing weep holes in Brick work /plain /reinforced concrete abutment, wing wall/ return wall with 100mm dia AC pipe extended through the full width of structure with slope of 1V:20H towards drawing foce. Complete as per drawing and technical specifications No. 2706 & 2200 Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert) | - | RM | - | - |
| 10 | Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces SI.No.-8.8 Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert) | - | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.31 MB
Tendernotice_2.pdf
PDF • 1.30 MB
BOQ_2118617.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid