Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.8 L+₹1,277.10 (0.71%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹1.9 L+₹8,919.10 (4.98%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹2.0 L+₹18,393.70 (10.3%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹2.0 L+₹24,425.70 (13.6%)Admitted-Finance VILL VAMHORA HIMAYUPUR MAHEVA DISTRICT ETAWAH | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s CHANDRA PAL SINGH L1 | RAJKUMAR SHARMA CONTRACTOR L2 | M.K. ENTERPRISES L5 | KUNDAN SINGH CONTRACTOR L4 | SHRI KRISHAN CONTRACTOR L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Uprooting jhunds and moonj with disposal away from site.As per Direction by Engineer-In-Charage. | 2,709 | Sqm. | 4.1 ₹11,106.9 Lowest | 26 ₹70,434 | 25.5 ₹69,079.5 | 29.4 ₹79,644.6 | 20 ₹54,180 |
| 2.00 | Earth work in silt clearance including lift upto 1.5m and lead upto 6m by JCB Machine i/c cost of driver, POL, maintenance of machine etc. | 1,610 | CuM | 45 ₹72,450 | 30.4 ₹48,944 | 35.27 ₹56,784.7 | 29 ₹46,690 | 20 ₹32,200 Lowest |
| 3.00 | Scrapping internal section of existing channel i.e. Bed & Slope with silt up to 5 cm per Sqm. | 20,320 | Sqm. | 4.7 ₹95,504 | 3 ₹60,960 Lowest | 3.82 ₹77,622.4 | 3.5 ₹71,120 | 5 ₹1,01,600 |
Tender Value
₹2.4 L
EMD Value
₹4,800
Closing Date
17 Sept 2026, 4:40 pmClosed
Neeraj Kumar Singh
Lower Division Agra Canal Agra
INTERNAL CLEARANCE OF HIRONDA MINOR FROM KM 0.000 TO KM. 8.600
2026_UPIDC_1184359_18
03/EE/2026-27
Open Tender
Civil Works - Canal
Item Wise
20 days
INTERNAL CLEARANCE OF HIRONDA MINOR FROM KM 0.000
Tender
3 documents required · 3 mandatory
₹89
₹4,800
Yes
Lower Division Agra Canal Agra
28 Sept 2026
10 Sept 2026
18 Sept 2026
10 Sept 2026
17 Sept 2026
10 Sept 2026
10 Sept 2026 - 17 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting jhunds and moonj with disposal away from site.As per Direction by Engineer-In-Charage. | 2,709 | Sqm. | - | - |
| 2 | Earth work in silt clearance including lift upto 1.5m and lead upto 6m by JCB Machine i/c cost of driver, POL, maintenance of machine etc. | 1,610 | CuM | - | - |
| 3 | Scrapping internal section of existing channel i.e. Bed & Slope with silt up to 5 cm per Sqm. | 20,320 | Sqm. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.22 MB
BOQ_2228269.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .