Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 LAccepted-AOC BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical BARDHAMAN DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR WEST BENGAL 713346 | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | - | Rejected-Technical As per TCR | |
| 3 | Rejected-Technical DVC MORE PANDAVESWAR BARDHAMAN WEST BENGAL 713346 | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | - | Rejected-Technical As per TCR |
Tender Value
₹17.0 L
EMD Value
₹21,200
Closing Date
9 Aug 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Engineer (EandM)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Burdwan, West Bengal-713346
Strengthening of B03 belt with dual drive head at Khottadih Colliery.
2024_ECL_313832_1
GM-PND/EandM/24-25/28/267 dated 29/07/2024
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Khottadih Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹21,200
24 Sept 2024
30 Jul 2024
10 Aug 2024
30 Jul 2024
9 Aug 2024
30 Jul 2024
30 Jul 2024 - 2 Aug 2024
Amount
Strengthening of B03 belt with dual drive head at Khottadih Colliery. (Inclusive of EPF/CMPF)
Complete Installation after Transportation & with Necessary Fabrication of 190 mtrs 1000 mm width, 110kW Belt Conveyor at B03 to 70L/9D which includes 1) Transportation, Carrying from Surface & Fitting of Discharge Head (800 X1400 mm) with Deck Plate, Chute, scrapper and 08 nos of Girders (125 X 250 mm) - 3.0 MT 2) Transportation, Carrying from Surface & Fitting of Drive head with Gear Box & Motor – 7.5 MT 3) Transportation, Carrying from Surface & Fitting 1 nos. of load table one for Discharge & 2nd for Tail End& decking plate – 1.5 MT. 4) Transportation & Fitting including grouting of Tail end Assembly with V-Scraper & Decking fabrication & Fitting - 1 MT 5) Fitting Complete 140 mtr Structure with Top & Bottom Rollers after transported from surface to work site laying ,and, fitting @ -110Kg-per-mtr, - 15.4MT
Fabrication of one no of hopper 04 mtrs long which including labour cost, oxygen, DA and welding
Fabrication of one no. of tail-end assembly which including labour cost, oxygen, DA and welding
1000 mm PVC Belting transportation from surface, laying, jointing tensioning trail run etc.
1)Holding down bolts of Drive Hd & Stucture , and Tail End. – 40 Nos
Transportation of ACB, starter & PVC cable, Pull Cord, Signaling System etc surface to site.
Fencing of Drive Head and Tail End
Consumable Nut & Bolt 5/8 “X 2“ -140 Kg ; Plain washer- 10 Kg
Hanging by vartical support 30 mtr. length conveyor structure providing M.S. channel
Dismantling and carrying with transportation of discharge head (800 X 1400mm) with deck plate, chute, scrapper and 08 nos. of girder (100 X 200mm) from B03 Belt in R-IV seam to surface site
Dismantling and carrying with transportation of discharge drive unit (Drive, Gearbox, motor) including base frame from B03 belt in R-IV seam to surface
Dismantling and carrying with transportation of 01 no. to load table (hopper) and tail end set with decking plate from B03 in R-IV seam to surface
Dismantling and carrying with transportation of loop take up with winch & bend pulley frame from B03 in R-IV seam to surface
Dismantling and carrying with transportation of 140 mtrs conveyor structure with top & bottom roller from B03 belt in R-IV seam to surface
Dismantling and carrying with transportation of 1000 mm wide 280 mtr PVC belting from B03 belt in R-IV seam to surface
Dismentling of one tail-end assy. from B03 belt in R-IV seam & carrying to surface
Cleaning of coal for Discharge, Drive, Hopper & Tail end set from B03 belt
Total impact of GST for the purpose of CTC
NANDI ENTERPRISE
SABIR CONSTRUCTION
techsummary_325229.pdf
PDF • 0.39 MB
finsummary_325229.pdf
PDF • 0.39 MB
WO28ENM2425.pdf
PDF • 0.05 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .