Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Finance | -51.55% | ₹2.4 L | L1 | Admitted-Finance |
| 2 | L2₹2.4 LAdmitted-Finance | -51.00% | ₹2.4 L | L2 | Admitted-Finance |
| 3 | L3₹2.6 LAdmitted-Finance | -46.66% | ₹2.6 L | L3 | Admitted-Finance |
| 4 | L4₹2.8 LAdmitted-Finance | -41.90% | ₹2.8 L | L4 | Admitted-Finance |
| 5 | L5₹3.0 LAdmitted-Finance | -37.99% | ₹3.0 L | L5 | Admitted-Finance |
Tender Value
₹4.9 L
EMD Value
₹9,720
Closing Date
25 May 2026, 6:00 pmClosed
XEN OFFICE REW JAMMU
XEN OFFICE REW JAMMU
Constt. Of Edge wall of Shamshanghat road of pindi Charkan kallan in Pyt. Pindi Charkan Block Arnia for the Year 2026-27 under CDF, 2nd Call
2026_RDPR_310131_1
e-NIT No. 35 REWJ of 2026-27 dated 16-05-2026
Open Tender
Civil Works
XEN OFFICE REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹9,720
2 Jun 2026
16 May 2026
26 May 2026
16 May 2026
25 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | General site clearance including levelling of ground and disposal of material 3 labour for 1 days | 3 | no's | 553 | ₹1,659 |
| 2 | Earh Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 37.83 | cum | 479.3 | ₹18,131.92 |
| 3 | Providing and laying in position cement concrete 1 cement:5 fine sand:10 graded crushed stone aggregates 40mm size excluding the cost of centring and shuttering- all works upto plinth level. | 4.73 | cum | 4,846.3 | ₹22,923 |
| 4 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 45.4 | cum | 5,733.6 | ₹2,60,305.44 |
| 5 | (a) Foundation, Footing, Base of Columns etc. | 124.16 | sqm | 286.35 | ₹35,553.22 |
| 6 | Excavating, supplying and filling of local earth (including royalty)by mechanical
transport upto a lead of 5 km also including ramming and watering of the earth in
layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete | 181.25 | cum | 276.6 | ₹50,133.75 |
| 7 | Rbm,supplying and filling (including royality) by mechanical transport also including ramming and watering etc. complete | 122 | cum | 425 | ₹51,850 |
| 8 | (b) Sand by 30kms | 23.56 | cum | 520.34 | ₹12,259.21 |
| 9 | (c) Aggregate by 30kms | 44.62 | cum | 520.34 | ₹23,217.57 |
| 10 | Add cost of Sigh Board and painting | 1 | each | 10,000 | ₹10,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_1003612.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid