Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | ₹3.0 L | L1 | Admitted-Finance |
| 2 | L2₹3.2 LAdmitted-Finance MAHUAR KIRAWALI AGRA | AGRA | AGRA | UTTAR PRADESH | ₹3.2 L | L2 | Admitted-Finance |
| 3 | L3₹4.3 LAdmitted-Finance 0 ABHISHEK ENTERPRISES CHARWA PACHIMTHOK KAUSHAMBI UTTAR PRADESH 212203 | KAUSHAMBI | UTTAR PRADESH | 212203 | ₹4.3 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | aashirvad contractor L1 | ABHISHEK ENTERPRISES L3 | GARG ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00 | Carriage of following from electricity store center, Tajganj, Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) PCC pole 8.5 Mtr. long | 2 | No. | 826 ₹1,652 | 708 ₹1,416 | 590 ₹1,180 |
| 2.00 | Carriage of following from electricity store center, Tajganj, Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) 25 KVA T/F | 1 | No. | 2,950 ₹2,950 | 1,416 ₹1,416 | 2,360 ₹2,360 |
| 3.00 | Carriage of following from electricity store center, Tajganj, Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) 11 KV XLPE Cable 3×70 sqmm. | 380 | Mtr. | 47.2 ₹17,936 | 29.5 ₹11,210 | 20.06 ₹7,622.80 |
| 4.00 | Cartiage of following material from electricity store center,Tajganj, Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) Line material viz. Stone Pad (02 Nos.)/Cross Arm Clamp (02 Nos.)/MS T-off Channel (02 Nos.)/ACSR Weasal conductor (50 Mtr.)/ Cable Jointing Kit O/D (04 Nos.)/11 KV Pin Insulator with Pin (12 Nos.)/ Earthing Complete (02 Nos.)/11 KV Disc Insulator with fitting (03 Nos.)/ Stay Set Complete (02 Nos.)/ Top Channel (01 Nos.)/ Dropper Channel (01 Nos.)/ MS Base Angle (02 Nos.)/ Fuse Set (01 Nos.)/Danger Board (01 Nos.)/DP Clamp (11 Nos.)/HDPE Pipe 6'' Dia (300 Mtr.)/GI Pipe 6'' Dia (16 Mtr.) and other line material, if required | 20 | Qtl. | 295 ₹5,900 | 206.5 ₹4,130 | 236 ₹4,720 |
| 5.00 | Erection and grouting of double pole (8.5 Mtr. long PCC pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | 1 | Nos. | 4,720 ₹4,720 | 4,130 ₹4,130 | 6,490 ₹6,490 |
| 6.00 | Erection and grouting of stay in ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. | 2 | Nos. | 590 ₹1,180 | 708 ₹1,416 | 531 ₹1,062 |
| 7.00 | Fixing of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | 2 | Nos. | 118 ₹236 | 118 ₹236 | 59 ₹118 |
| 8.00 | Laying sagging stringing and binding and jumpering of conductor in LT/HT Line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. ACSR Weasal conductor | 50 | Mtr. | 2.36 ₹118 | 2.36 ₹118 | 4.72 ₹236 |
| 9.00 | Mounting of 25 KVA T/F on existing double pole & making HT/LT connection . | 1 | Nos. | 2,950 ₹2,950 | 2,950 ₹2,950 | 2,360 ₹2,360 |
| 10.00 | Laying of 11 KV XLPE Cable 3x70 sqmm (double circuit) by drill machine/ H.D.D. Machine threw H.D.P.E. Pipe 6" Dia including the cost of arrangment of labour, T&P & Drill machine/H.D.D. machine as per respo norms. for complete the work. | 300 | Mtr. | 767 ₹2.3 L | 1,214.22 ₹3.6 L | 826 ₹2.5 L |
Updated dates
Tender Value
₹6.0 L
EMD Value
₹6,100
Closing Date
28 Mar 2026, 1:00 pmClosed
SE, EDC, B 690, Kamla Nagar, Agra
EDC, B 690, Kamla Nagar, Agra
For releasing new connection of 20 KW in LMV-2 for Ms. A.P. Sheltors Pvt. Ltd. Site Khasra No. 756-2 Artoni, Agra in Full Deposit scheme under EDD, Sikandra, Agra
2026_DVVNL_1115910_2
34/EDCA/2025-26
Open Tender
Electrical Works
30 days
EDC, B 690, Kamla Nagar
As Per Pre Qualifying Conditions
2 documents required · 2 mandatory
₹1,180
www.dvvnl.org
₹6,100
31 Mar 2026
16 Mar 2026
28 Mar 2026
16 Mar 2026
28 Mar 2026
16 Mar 2026
Select, Excess (+), Less (-)
Tender Inviting Authority: Superintending Engineer, EDC, DVVNL, Kamla Nagar, Agra
Name of Works : For releasing new connection of 20 KW in LMV-2 for Ms. A.P. Sheltors Pvt. Ltd. Site Khasra No. 756/2 Artoni, Agra in full deposit scheme under EDD, Sikandra Agra.
Tender No: 34/EDCA/2025-26
Sl. No. Items Description Item Code / Make Qty. Units Quoted Qty. by tenderer Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Rate Per unit (Rs.) GST (Rs.) Total Unit Rate in (Rs.) Total Unit Rate in (Rs.)
Carriage of following from electricity store center, Tajganj, Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) PCC pole 8.5 Mtr. long Item 1 No. Excess(+) Full Conversion INR DVVNL
Carriage of following from electricity store center, Tajganj, Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) 25 KVA T/F Item 2 No. Excess(+) Full Conversion INR
Carriage of following from electricity store center, Tajganj, Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) 11 KV XLPE Cable 3×70 sqmm. Item 3 Mtr. Excess(+) Full Conversion INR
Cartiage of following material from electricity store center,Tajganj, Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) Line material viz. Stone Pad (02 Nos.)/Cross Arm Clamp (02 Nos.)/MS T-off Channel (02 Nos.)/ACSR Weasal conductor (50 Mtr.)/ Cable Jointing Kit O/D (04 Nos.)/11 KV Pin Insulator with Pin (12 Nos.)/ Earthing Complete (02 Nos.)/11 KV Disc Insulator with fitting (03 Nos.)/ Stay Set Complete (02 Nos.)/ Top Channel (01 Nos.)/ Dropper Channel (01 Nos.)/ MS Base Angle (02 Nos.)/ Fuse Set (01 Nos.)/Danger Board (01 Nos.)/DP Clamp (11 Nos.)/HDPE Pipe 6'' Dia (300 Mtr.)/GI Pipe 6'' Dia (16 Mtr.) and other line material, if required Item 4 Qtl. Excess(+) Full Conversion INR
Erection and grouting of double pole (8.5 Mtr. long PCC pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. Item 5 Nos. Excess(+) Full Conversion INR
Erection and grouting of stay in ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. Item 6 Nos. Excess(+) Full Conversion INR
Fixing of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Item 7 Nos. Excess(+) Full Conversion INR
Laying sagging stringing and binding and jumpering of conductor in LT/HT Line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. ACSR Weasal conductor Item 8 Mtr. Excess(+) Full Conversion INR
Mounting of 25 KVA T/F on existing double pole & making HT/LT connection . Item 9 Nos. Excess(+) Full Conversion INR
Laying of 11 KV XLPE Cable 3x70 sqmm (double circuit) by drill machine/ H.D.D. Machine threw H.D.P.E. Pipe 6" Dia including the cost of arrangment of labour, T&P & Drill machine/H.D.D. machine as per respo norms. for complete the work. Item 10 Mtr. Excess(+) Full Conversion INR
Laying of 11 KV XLPE Cable 3x70sqmm cable threw exesting GI Pipe on double pole and overhead laying with making loop (at a distance of approx. 4 mtr.) for complete work as per RESSPO norms. Item 11 Mtr. Excess(+) Full Conversion INR
Fixing of G.I. Pipe 6" Dia for Laying of 11 KV XLPE Cable 3x70 sqmm through Above G.I. Pipe). Item 12 Mtr. Excess(+) Full Conversion INR
Installation of D.O. Fuse set on Double pole. Item 13 1 Nos. Excess(+) Full Conversion INR
Fixing of Danger board on exesting Double pole. Item 14 1 Nos. Excess(+) Full Conversion INR
Filling of 11 KV 3×70 sqmm outdoor/Indoor cable boxes and making connection as per direction of supervising engineer on existing double pole. Item 15 Nos. Excess(+) Full Conversion INR
Making HT 'T' off Channel on existing line as per RESPO norms. Item 16 Nos. Excess(+) Full Conversion INR
Providing & Fixing of Bolt & Nut of various sizes as per RESPO Norms Labour, T &P and carrier etc other associated works shall be born by the contractor at his own cost. Item 17 Kg. Excess(+) Full Conversion INR
Fabircation & Fixing of Top Channel, Dropper Channel, T-off Channel & Base Angle with required Hole approximate 50 Nos. as per RESPO Norms Labour, T &P and carrier etc including Fabircation work shall be born by the contractor at his own cost. Item 18 Nos. Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select %
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
TechnicalBid34D23032026.rar
Tender Documents • 1.29 MB
BOQ_2099643.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid