Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹8.3 L+₹19,210.50 (2.37%)Rejected-Finance | L2 | Rejected-Finance Above Quoted |
Tender Value
₹8.2 L
EMD Value
₹8,200
Closing Date
14 Jul 2023, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER
PANCHAYAT UNION APPLE BY ROAD COONOOR
PROVIDING BARBED WIRE FENCING TO EVICTION LAND (SURVEY NO. 89/1) (VGG LAND) AT NARIKUZHIPALLAM OF HUBBATHALAI PANCHAYAT UNDER ENCROACHMENT FENCING
2023_RDTN_336282_1
Proc.A1/0912/2023 under Encroachment Fencing 23-24
Open Tender
Civil Works
Item Rate
90 days
PANCHAYAT UNION COONOOR
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,200
Yes
19 Jul 2023
7 Jul 2023
14 Jul 2023
7 Jul 2023
14 Jul 2023
7 Jul 2023
Amount
PROVIDING BARBED WIRE FENCING TO EVICTION LAND (SURVEY NO. 89/1) (VGG LAND) AT NARIKUZHIPALLAM OF HUBBATHALAI PANCHAYAT IN COONOOR BLOCK - TN-PK01
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15CM thick well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc including levelling the sites complete complying with standard specifications and as directed in hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, gravel, stoney earth and earth muds with 50%
Cement concrete 1:4:8 (one cement Four sand and Eight hard broken stone) using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm, thick, compacting etc., complete complying with standard specification and as directed
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with Cross bracings using mild steel sheets of size 90cms x 60cm and 10 gauge stiffened welded with mild steel angles of size 25mm x 25mmx3mm for boarding laid over silver oak (Country wood) Joists of size 10cm x 6.5 cm dia spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre etc complete complying with standard specification and as directed for the following items.
Cement concrete 1:2:4 using 20mm gauge hand broken granite stone jelly including all etc., complete complying with standard specification and as directed.
Towards supply and fixing of RCC Precast pillar 100mmx100mm in size including cost and conveyance of all materials to site and all labour charges etc complete.
Towards chain link fencing Barbed Wire - 10 Gauge - Two Ply and Four Pronged (Galvanised) using 10 Gauge Galvanised Iron Wire (of all sizes) including cost and conveyance of all materials to site and all labour charges etc., complete.
Painting two coats using approved plastic emulsion paint including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats using using best quality anticorrosive Paint & approved variety of colouring pigments including brushes,scaffolding charges etc., complete
Provision for supply and fixing of Steel Gate (1 no) including transporting and fixing at site for labour charges all etc complete (including Lock and key)
Provision for transporting charges from market to working site and local head loading shifting charges for RCC Post 150mmx150mm x2.40m including all etc complete
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
V RAVIKUMAR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .