Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance AT NEHUR COLONY PO NAYA BAZAR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance W NO 03 FOREST COLONY BARIPADA PO PS BARIPADA DIST MAYURBHANJ | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹25.9 L
EMD Value
₹25,900
Closing Date
23 Jun 2026, 5:00 pmClosed
Executive Engineer,Div-II
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Construction of Kulisani Anganwadi Centre at Bardhaman Compound in Ward No.39.
2026_ORULB_131615_2
MC(CMC)CTC_Div-IINo11/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹25,900
Yes
29 Jun 2026
17 Jun 2026
29 Jun 2026
17 Jun 2026
23 Jun 2026
17 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in all kind of soil with all leads and lift including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with all leads and lifts, T&P for shoring, shuttering, dewatering if required etc. complete as per the drawing, designing including cost of all labour, T&P etc. as required for the work complete as directed by the engineer- in- charge. | 59.78 | CUM | 299.52 | ₹17,905.31 |
| 2 | Filling in foundation trenches, plinths, sites of foundation, in the space below the grade level slab and other underground structures with good quality river sand (inclusive of cost, conveyance, royalties, taxes, loading and unloading) laying in layers not exceeding 225mm in thickness, filling, watering and compacting / ramming, in each layers or complete as per specification, drawing and direction of the Engineer-in-Charge. | 16.77 | CUM | 612.7 | ₹10,274.98 |
| 3 | Cement concrete (1:3:6) with 4cm. Size crusher broken hard Granite metal including cost of all labour, materials with all taxes, lead,T & P etc all complete. | 9 | CUM | 6,393.8 | ₹57,544.2 |
| 4 | Fly ash bricks of 25cmx12cmx8cm. Size having crushing strength not less than 75 Kg/Sqcm. With dimensional tolerance +2%. percentin cement mortar (1:6) in foundation and plinth | 7.95 | CUM | 5,538.3 | ₹44,029.49 |
| 5 | RCC work M20 with 20 mm and down graded size black hard grinite ( crusher broken ) stone chips including hoisting,lowering & laying concrete & compacting by using vibrator watering & curing for 4 weeks including cost & conveyance, royalties & taxes, Centring & Shuttering of all materials & labour required for the work etc complete with all T & P in all respect but excluding cost & conveyance of M.S rods & binding wires & tying the grills & placing in proper position.A) R.C.C. FOUNDATION & COLUMN BASE. | 9.56 | CUM | 6,925.12 | ₹66,204.15 |
| 6 | B) R.C.C. PLINTH BEND | 3.41 | CUM | 7,795.47 | ₹26,582.55 |
| 7 | C) R.C.C. LINTELS | 1.7 | CUM | 14,588.47 | ₹24,800.4 |
| 8 | D) R.C.C. BEAM & COLUMN | 7.89 | CUM | 18,597.01 | ₹1,46,730.41 |
| 9 | E) R.C.C. SLAB | 6.33 | CUM | 14,173.05 | ₹89,715.41 |
| 10 | F) R.C.C. CHAJJA | 0.3 | CUM | 1,264.19 | ₹379.26 |
stage.html
html • 0.02 MB
finance_596759.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_596759.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .