| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAccepted-AOC | L1 | Accepted-AOC Found lowest one bidder | |
| 2 | L2₹8.9 L+₹24,857 (2.88%)Rejected-AOC | L2 | Rejected-AOC Quoted high rate as compared to L1 | |
| 3 | L3₹10.5 L+₹1.9 L (21.9%)Rejected-AOC | L3 | Rejected-AOC Quoted high rate as compared to L1 |
Tender Value
₹10 L
Closing Date
29 Aug 2022, 2:00 pmClosed
Executive Engineer
rural engineering wing leh
Upgardation of community hall near Imamia Mission school Chuchot
2022_RDD_7358_11
NIT NO 23 - UTL - REWL OF 2022-23
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Payable To Executive Engineer
Exempted
14 Sept 2022
20 Aug 2022
31 Aug 2022
20 Aug 2022
29 Aug 2022
20 Aug 2022
Amount
Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (Not exceeding1.5 mtr in width) and for shafts, wells, cesspits and thelike not exceeding 10 sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All Kinds of soil.
Random Rubble masonry with ~ard stone from nallah in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement: 6 coarse sand: 12 graded stone aggregate 20mm nominal size) upto plinth level with cement mortar 1:6 (1 Cement: 6 fine sannd)
Providing and laying damp-proof course 50rnm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand 4 graded stone aggregate 20mm nominal size .
Providing and fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centring, shuttering and complete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) Crushed
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately):Second class kail wood
Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows including lSI marked M.S. pressed Butt hinges bright finished of required size with necessary screws excludingpanelling which will be paid for separately,al! completeas per direction of engineer- in charge. Second kail wood
Providing and fixing glazed shutters for doors, windowsand clerestory windows using 1 Okg/sqm (4mm thick) float glass panes including lSI marked M.S. pressed butt· hinges bright finished of required size with necessary screws.of 30mm thick using second class Kail wood
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutmen"ts, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, fmishing and reinforcement.1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size)
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars.
Centnng and shuttering including strutting~ propping etc and removal of form work for Lintels, beams, plinth beams, girders, bressumers and centilevers.
Centnng and shuttering including strutting~ propping etc and removal of form work for slabs, suspended floor,etc
Centnng and shuttering including strutting~ propping etc and removal of form work for edge wall under 20cm wide
Peeble dash plaster upto 10m height above ground level with mixture of washed peeble or crushed stone 6mm to 12mm N/size with 1:4 mix
15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 4 ( 1 cement : 4 coarse sand)
Providing and applying white cement based putty of average thickness 2 mm, of approved brand and manufacture, over the plastered wall surface to prepare the surface even and smooth complete.
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade New work (two or more coats) over and in-cluding priming coat with cement primer
French spirit polishing with Two or more coats on new works including a coat of wood filler
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 em in depth, breaking clods, ,-watering, rolling each layer with half tonne roller or wooden L or steel rammers, and rolling every third and top -most layer with power roller of minimun 8 tonnes and dressing up in embankments for roads, flood banks,marginal banks and guide banks or tilling up ground depressions lead upto 50 mtr and lift upto 1. 5 mtr. in : All kinds of soil: .
Providing and laying of dry stone solling in horizontal layer including cost of stone complete job.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) (A) Crushed
Providing and laying of readymade flooring of 8mm thick (Action Tesa AC4) complete job.
Carriage of sand and coarse agg. avg. Lead of 10 Km by MT
Carriage of stone agg. avg. Lead of 10 Km by MT
Carriage of cement and Steel avg. Lead of 10 Km by MT
M/S ZIA UD DIN GOVT CONTRACTOR
M/S MOHSIN ALI GOVT CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .