Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹20.5 LAccepted-AOC 12 ATRAULI KHERA PATAN SARAI DHODA ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | 1 | Accepted-AOC lowest bid rate | |
| 2 | 2₹20.9 L+₹41,086.56 (2.00%)Rejected-Finance | 2 | Rejected-Finance higher bid rate | |
| 3 | Rejected-Technical 1 306 LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | - | Rejected-Technical technically not qualified |
| Sl No | Description | Qty | Unit | BHUPENDRA KUMAR L1 | SHAILESH SINGH L2 |
|---|---|---|---|---|---|
| 1.00 | Gas cutting for dismantling, Repairing and Erection work for foundation girder work including material,labour and T&P etc. | 112.56 | Mtr. | 194 ₹21,836.64 Lowest | 196 ₹22,061.76 |
| 2.00 | Electric Arc Welding in Erection, fabrication, repairing, reconditioning and strengthening work including material, labour, T&P etc. | 265.36 | Mtr. | 248 ₹65,809.28 Lowest | 252 ₹66,870.72 |
| 3.00 | Strengthening work of foundation Girder (horizontal) Hanging between piers including cost of material, Fabrication, labour, T&P etc. | 2 | Job | 3,35,350 ₹6,70,700 Lowest | 3,40,000 ₹6,80,000 |
| 4.00 | Replacing of steel wire rope 28 mm dia of Shahzad Dam by dismantling & taking out damaged steel wire rope by special jigs and fixtures chain pulley block ceiling and assembling new steel wire rope 28 mm dia including cost of all material, labour, T & P etc. requied for proper completion of work of Gate No. 4 | 1 | Job | 12,60,200 ₹12,60,200 Lowest | 12,90,000 ₹12,90,000 |
| 5.00 | Replacing defective alignment of gate by adjusting length of steel wire rope, plummer block and other allied work as required including cost of all material, labour,T & P Jigs and fixture, scaffolding bridges etc as per requirement for proper completion of work. (Gate no. 4) Gate Span more than 12.00 mtr. | 1 | Job | 34,600 ₹34,600 Lowest | 35,300 ₹35,300 |
Tender Value
Refer Docs
EMD Value
₹43,300
Closing Date
7 Jul 2025, 10:00 amClosed
Executive Engineer
Office of E.E., B.M.M.D, 67-A, Cantt., Kanpur 208004
Replacement of Steal wire rope and strengthening of foundation girder of Sahzad Dam, Distt- Lalitpur.
2025_UPIDM_1053162_1
14 (Lot-1)/EE/BMMDK/2025-26
Open Tender
Miscellaneous Works
Fixed-rate
15 days
Sahzad Dam, Distt- Lalitpur.
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹43,300
4 Dec 2025
1 Jul 2025
7 Jul 2025
1 Jul 2025
7 Jul 2025
1 Jul 2025
Amount
Gas cutting for dismantling, Repairing and Erection work for foundation girder work including material,labour and T&P etc.
Electric Arc Welding in Erection, fabrication, repairing, reconditioning and strengthening work including material, labour, T&P etc.
Strengthening work of foundation Girder (horizontal) Hanging between piers including cost of material, Fabrication, labour, T&P etc.
Replacing of steel wire rope 28 mm dia of Shahzad Dam by dismantling & taking out damaged steel wire rope by special jigs and fixtures chain pulley block ceiling and assembling new steel wire rope 28 mm dia including cost of all material, labour, T & P etc. requied for proper completion of work of Gate No. 4
Replacing defective alignment of gate by adjusting length of steel wire rope, plummer block and other allied work as required including cost of all material, labour,T & P Jigs and fixture, scaffolding bridges etc as per requirement for proper completion of work. (Gate no. 4) Gate Span more than 12.00 mtr.
SHAILESH SINGH (BID ID -5287423)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .