Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.8 LAccepted-Finance 285 MAHATMA GANDHI ROAD 285 PRANTIKAPAN SHOPPING COMPLEX BL 1 1ST FLOOR SHOP S 35 KOLKATA 700104 | KOLKATA | KOLKATA | WEST BENGAL | 700104 | ₹25.8 L | L1 | Accepted-Finance ACCEPTED |
| 2 | L2₹26.1 L+₹32,348 (1.25%)Accepted-Finance 5743 BAGUINARA ROAD BURIBATTALA SUBHASGRAM SOUTH 24 PARGANA KOLKATA 700147 | KOLKATA | SOUTH 24 PARGANA | WEST BENGAL | 700147 | ₹26.1 L+₹32,348 (1.25%) | L2 | Accepted-Finance ACCEPTED |
| 3 | L3₹26.4 L+₹58,226.40 (2.26%)Rejected-Finance | ₹26.4 L+₹58,226.40 (2.26%) | L3 | Rejected-Finance REJECTED |
Tender Value
₹25.9 L
EMD Value
₹51,757
Closing Date
12 Aug 2026, 2:00 pmClosed
EXECUTIVE ENGINEER KOLKATA SOUTH I DIVISION, HOUSI
84, IBRAHIMPUR ROAD, KOLKATA 700032
Renovation and Repairing work of four nos. R.H.E blocks (RI, R2, R3, R4) at Regent Estate Govt. R.H.E, Kolkata-700092
2026_HSD_1034613_1
WBHOUSING/EE/KS ID/e-NIT05/2026-27
Open Tender
CIVIL WORKS
Percentage
120 days
RHE REGENT ESTATE
Please refer Tender documents.
4 documents required · 4 mandatory
₹51,757
24 Aug 2026
27 Jul 2026
14 Aug 2026
29 Jul 2026
12 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.
a) In ground floor including roof. Gr Floor | 1 | Sq.M. | 1,956 | ₹1,954.04 |
| 1.01 | First Floor | 1 | Sq.M. | 2,006 | ₹2,003.99 |
| 1.02 | Second Floor | - | Sq.M. | 2,056 | - |
| 1.03 | Third Floor | - | Sq.M. | 2,106 | - |
| 2 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | - | Sq.M. | 19 | - |
| 3 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. | - | Sq.M. | 335 | - |
| 3.01 | 1st Floor | 1 | Sq.M. | 353 | ₹352.65 |
| 3.02 | 2nd Floor | 1 | Sq.M. | 371 | ₹370.63 |
| 3.03 | 3rd Floor | 1 | Sq.M. | 389 | ₹388.61 |
| 4 | Cleaning the concrete surface by removing dirt and debris, marking defective locations and removing loose concrete by careful stripping untill hard surface is exposed, cutting the concrete to regular shape, wire brushing the exposed surface and removing debris from site complete as per direction of the Engineer - in - Charge. | 0.8 | Sq.M. | 90 | ₹72 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_2541228.xls
BOQ • 0.39 MB
2911.pdf
Tender Documents • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .