Loading
Loading…
Loading…
Tender Value
₹4.1 L
EMD Value
₹4,060
Closing Date
9 Jul 2026, 3:00 pmDue tomorrow
BDO VP
PU Vikravandi
VPM/VKDI/MF-2025-2026/ORTHUR
2026_RDTN_683015_1
VPM/VKDI/MF-2025-2026/ORTHUR
Open Tender
Civil Works
PU Vikravandi
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,060
Yes
27 Jun 2026
27 Jun 2026
9 Jul 2026
27 Jun 2026
9 Jul 2026
27 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing Cement concrete Pavement at Nathamedu 1 Cross street in Orathur panchayat. | |||||
| 1.01 | EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc. complete. | 7.44 | m3 | 263.78 | ₹1,962.52 |
| 1.02 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 24.12 | m3 | 5,770.81 | ₹1,39,191.94 |
| 1.03 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle | 66.34 | m3 | 547.39 | ₹36,313.85 |
| 1.04 | Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 23.14 | m3 | 7,073.78 | ₹1,63,687.27 |
| 1.05 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | - | GST Amount (in Rupees) | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_821065.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid