Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Qualified |
| 2 | Accepted-Technical 0 SOMA KHANGBU SHEY SHEY ROAD SHEY LEH LADAKH LEH LADAKH 194201 UDYAM LA 02 0005556 | LEH LADAKH | LADAKH | 194201 | Accepted-Technical Qualified |
| 3 | Accepted-Technical | Accepted-Technical Qualified |
| 4 | Accepted-Technical | Accepted-Technical Qualified |
| 5 | Accepted-Technical STAKMO | Accepted-Technical Qualified |
Tender Value
₹14.0 L
EMD Value
₹33,020
Closing Date
11 May 2026, 4:00 pmClosed
Executive Engineer construction division Leh.
Executive Engineer construction division Leh.
Construction of Compound walling at new site of PHC Sakti (Balance Work) (Under Capex)
2026_PWD_18812_1
CDL 22 of Leh of 2026-27
Open Tender
Civil Works - Others
Percentage
30 days
Leh
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Executive Engineer construction division Leh.
₹33,020
16 May 2026
21 Apr 2026
12 May 2026
22 Apr 2026
11 May 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing & fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position in cement mortar 1:3 (1cement:3 coarse sand), cost of required centring, shuttering and curing complete4.10.3 1:3:6 (1 cement : 3 coarse sand : 6 graded crushed stone aggregate 20 mm nominal | - | Cum | 14,111.48 | - |
| 2 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with floating coat of neat cement including cement slurry and curing complete but excluding coat of nosing of steps etc complete. | - | Sqm | 564.87 | - |
| 3 | Carriage of material by MT including loading, unloading and stacking complete job. a) Cement an average lead of 50km | - | MT | 585.62 | - |
| 4 | b) Sand an average lead of 15km | - | Cum | 384.75 | - |
| 5 | c) Aggregate an average lead of 15km | - | Cum | 384.75 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_44938.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .